Nylige indkøb, hvor leverandøren Turbocare Sp.zo.o er nævnt
2011-09-20Major overhaul of Avedøreværket(AVV) unit 1 steam turbine section MP2 and LP (Avedøreværket)
Major overhaul of AVV unit 1 steam turbine section MP2 and LP.
Unit 1 was commissioned in 1990 and is a 262 MW BBC turbine with a steam pressure of 240 bar and steam temperature of 540 C running at 3000 RPM. It consist of a high pressure section, two medium pressure sections and a low pressure section. The work concerns the second medium pressure (IP2) section and the low pressure section (LP), both of which are with dual outlet with asymmetrical outlet pressures. The condenser pressure after the …
Se udbuddet » Nævnte leverandører:Turbocare Sp.zo.o