Nylige indkøb, hvor leverandøren MH Power Systems Europe GmbH er nævnt
2014-11-14M-01 Mill-, Burner- and PA-systems (DONG Energy Thermal Power A/S)
The scope of work is related to DONG Energy's conversion of Avedøre Power Station, unit 1, from coal firing to 100 % wood pellets operation, while maintaining the present option of using coal.
The present tender covers modification of mill and burner system, primary air system and installation of water soot blower.
The modification of the mill and burner systems includes:
— Modification of existing coal mills, including installation of explosion suppression system.
— Necessary modifications to existing …
Se udbuddet » Nævnte leverandører:MH Power Systems Europe GmbH