2016-12-20HØK — Renewal of CHP plant — Helsingør (Helsingør Kraftvarmeværk A/S)
Helsingør Kraftvarmeværk A/S is operating a gas-fired combined cycle plant at the site of Energivej 19 in
Helsingør. A decision has been made to renew the existing plant by establishing a biomass-fired boiler at the
site.
The existing turbine condensers (district heating) to the existing steam turbine (combined cycle) will be utilised
for the new steam turbine. Only one steam turbine will be in operation at a time. It will not be possible to run
combined cycle plant and bio boiler plant in parallel. The …