2017-10-2493200.R10 Independent Check and Engineering Services (Vejdirektoratet)
The new 4 km Storstrøm Bridge between Masnedø and Falster will replace the existing bridge from 1937, which is in poor condition and does not have the capacity to carry the increased railway freight traffic resulting from the opening of the Fehmarn Belt Connection.
The bridge comprises approximately 45 viaduct spans of 80 m in length, and 2 navigational spans of 160 m each. The main bridge is a cable-stayed bridge, with a single pylon, carrying a double-track electrified railway (200 km/h for passenger …
Se udbuddet » Nævnte leverandører:JV SBP — MGC — A&A