2016-03-18HCV Peak Load Boiler Plant — M-05 Valves (DONG Energy Thermal Power A/S)
DONG Energy is planning to increase the district heating peak load capacity in Copenhagen.
At H.C. Ørstedværket (HCV) 50-100 MJ/s new gas-fired hot water boiler capacity will be installed together with a new 200 MJ/s steam-water heat exchanger.
In addition, a new concept for operation of the CTR-pump station at HCV will be incorporated.
Finally, at Svanemølleværket new electrical hot water boiler of total 80 MJ/s capacity will be installed.
This Contract notice regards the design, testing and delivery of …
Se udbuddet » Nævnte leverandører:Grønbech & Sønner A/SPentair Valves & Controls Denmark A/S
2013-07-05Rammeaftale: Indkøb af pumper (Guldborgsund Spildevand A/S)
Guldborgsund Spildevand A/S (herefter betegnet »Ordregiver«) har et løbende behov for at indkøbe pumper til udskiftning af de eksisterende.
For at sikre den løbende forsyning af pumper, udbyder Ordregiver herved en rammeaftale, som skal dække det forventede behov for pumper i de kommende 2 år. Rammeaftalen udbydes for en 2-årig periode med option på op til 2 års forlængelse.
Ordregiver forventer over en 2-årig periode at skulle indkøbe 60-75 pumper i følgende størrelser:
0-2 KW
2-4 KW
4-6 KW
6-25 …
Se udbuddet » Nævnte leverandører:Grønbech & Sønner A/S