2018-08-31Certification Services for Baltic Pipe offshore Pipeline (Energinet TSO Gas A/S)
The Contracting Authority wants to purchase offshore pipeline certification of the EPII branch pipeline, the Lillebælt Pipeline and PLEM (Pipeline End Manifold), for the Baltic pipe project. The certification must include verification of all phases from design through manufacturing, installation and commissioning in compliance with DNVGL-ST-F101/DNV-OS-F101-and DNVGL-SE-0475/DNV-OSS-301. Based on this the Baltic pipe project must obtain an unconditional certificate of conformity for the pipelines and …
Se udbuddet » Nævnte leverandører:DNV GL Denmark A/S