2017-03-27Modification of coal burners for straw co-combustion on Fjernvarme Fyn Unit 7 (Fjernvarme Fyn A/S)
Fjernvarme Fyn power station is located in Odense, a few kilometres from the city centre. Fjernvarme Fyn consists of a coal fired CHP unit, a straw-fired CHP unit and an incineration plant.
Fjernvarme Fyn intends to co-fire up to 15 % straw on energy basis on their coal-fired plant.
This call for tender addresses LOT M3. The purchase includes modifying 4 identical coal-fired burners to be able to co-fire with straw. The burners must still be able to fire with coal when no straw is available. The works …
Se udbuddet »
2012-12-19LOT M1: Continuous Ship Unloader (CSU) for wood pellets; LOT M2: Transport and silo discharge equipment for wood... (Vattenfall A/S)
The purchase will be divided into four (4) different lots as described in the following. These may either be ordered as four (4) separate contracts or be freely combined into common contracts.
LOT M1: Continuous Ship Unloader (CSU) for wood pellets.
Supply of one Continuous Ship Unloader (CSU) for wood pellets at Amager Power Station located in the city of Copenhagen.
The supply includes engineering, purchase, manufacturing, installation, commissioning, testing and documentation of one Continuous Ship …
Se udbuddet »
2012-05-23Modification of burners for a biomass co-firing plant for wood pellets (Vattenfall A/S)
The supply includes modification of existing coal fired burners for a biomass co-firing plant for wood pellets located at Nordjyllandsværket in the city of Aalborg.
The supply includes design, manufacturing, supply, installation, testing and commissioning of modifications of four existing coal dust burners at the unit 3 at Nordjyllandsværket in the city of Aalborg. The unit 3 is an 845 MW thermal super critical coal dust fired boiler with sixteen burners where four burners shall be modified to be able to …
Se udbuddet »