2023-03-07   Framework Agreement for gas compressor packages (Energinet)
The Framework Agreement covers installation of a number of reverse-flow plants with compressors for moving upgraded biogas from the distribution grid into the 80 barg natural gas transmission grid in Denmark. The compressor packages will have different requirements to capacity range as well as pressure range. Basically, the units shall cover the capacity range from 5.000 Nm3/hr., to 15.000 Nm3/hr., with a min. inlet pressure of either 12, 23 or 35 barg and an approximate max. outlet pressure of either 60 … Se udbuddet »
2023-01-27   Framework Agreement for gas compressor packages (Energinet)
The Framework Agreement covers installation of a number of reverse-flow plants with com-pressors for moving upgraded biogas from the distribution grid into the 80 barg natural gas transmission grid in Denmark. The compressor packages will have different requirements to capacity range as well as pres-sure range. Basically, the units shall cover the capacity range from 5.000 Nm3/hr to 15.000 Nm3/hr, with a min. inlet pressure of either 12, 23 or 35 barg and an approximate max. outlet pressure of either 60 … Se udbuddet »
2019-04-12   Delivery, Installation and Service of Compressors for Injection of Upgraded Biogas (Dansk Gas Distribution Service Viborg A/S)
The purpose of this public procurement procedure is to establish a Framework Agreement between the contracting entity, Dansk Gas Distribution Service Viborg A/S, (hereinafter “the Buyer”) and one (1) supplier according to which the buyer — on an ongoing basis as needed — may order the delivery of complete biomethane injection compressor installations placed in enclosure for outdoor installation (hereinafter “Compressor(s)”) to be installed, connecting the existing or new biomethane upgrading plants to … Se udbuddet »
Nævnte leverandører: Fornovogas Srl
2019-03-26   Tender for Maintenance and Repair Services for Biomethane Injection Compressors (HMN Naturgas I/S)
The buyer wishes to procure maintenance services related to preventive maintenance work and repair work of the buyer’s existing 29 Fornovo Gas Biomethane Injection Compressors. The compressors are placed at different biogas plant sites around Central and Northern part of Jutland. At most sites, two or more compressors are installed to make failover possible and to mitigate the immediate impact in case of unplanned stops and/or breakdowns. Maintenance services entail the supplier’s performance of … Se udbuddet »
2016-12-05   Odins Bro — Drift og vedligehold — Mekanik og hydrauliske installationer (Odense Kommune, By- og Kulturforvaltningen, Drift og Anlæg)
Odins Bro (Broen) er Nordeuropas største dobbelte svingbro og kun den anden af sin art i Danmark. Nærværende udbud er en del af den strategi, som Odense Kommune har lagt for Broens drifts- og vedligeholdelse for at sikre effektiv konkurrence og den bedste udnyttelse af tilgængelige offentlige midler. Broens drifts- og vedligeholdelsesopgaver er delt op i 2 udbudspakker: — Mekanik og hydrauliske installationer; samt — Automation og elektriske installationer. De 2 pakker udbydes parallelt og har tætte … Se udbuddet »
Nævnte leverandører: SH Group A/S