2016-11-14   ASV8 Superheater (DONG Energy Thermal Power A/S)
The purpose of the project is to replace the electrical superheater belonging to the 98 MW steam boiler, which is backup for the steam supply from Asnaesvaerkets unit 2 and unit 5. The scope of the agreement is basically engineering, manufacturing and shipping of superheater and power modulation unit. Se udbuddet »