2016-11-14ASV8 Superheater (DONG Energy Thermal Power A/S)
The purpose of the project is to replace the electrical superheater belonging to the 98 MW steam boiler, which is backup for the steam supply from Asnaesvaerkets unit 2 and unit 5. The scope of the agreement is basically engineering, manufacturing and shipping of superheater and power modulation unit.
Se udbuddet »
2015-04-01Lot M4: Steam turbine, Generator and District Heating Systems (HOFOR Energiproduktion A/S)
Lot M4: Steam turbine, Generator and District Heating Systems.
A full functional unit for Steam turbine, Generator and District Heating Systems.
Scope of Supply includes:
— Backpressure non reheat steam turbine (estimated steam data 560C / 140 bar / approx. 190 kg/s and approx. output 150 MWe/400MWth) as well as auxiliaries (lube oil, control fluid and vibration monitoring, etc.)
— Synchronous generator and auxiliary systems (CT/VT, generator busbars, protection, excitation system and synchronization, …
Se udbuddet » Nævnte leverandører:Doosan Skoda Power s.r.o.
2013-10-04SKV4 Wood Chips - Bypass heat exchanger (DONG Energy Thermal Power A/S)
Introduction:
DONG Energy Thermal Power is planning to implement district heating production based on biofuels through erection of a number of wood-chip boilers, providing steam for existing steam turbine and/or stand alone district heating condenser. Two to four boilers are envisaged as an add-on to the existing gas fired plant, Skærbækværket. The new biomass fired boilers shall deliver up to 320 MW heat to the district heating system. It is envisaged that the new boiler plant shall have a capacity of …
Se udbuddet » Nævnte leverandører:Valmont SM A/S