2023-01-04KBH05 – 145 kV Submarine Cable Systems (Energinet Eltransmission A/S)
The Contracting Authority wants to purchase the complete functional supply of approximately 12 km 145 kV submarine cable system, including all labour, equipment and materials required for design, fabrication and factory testing, transport of cable and accessories to a harbour in Zealand, installation of transition joints and hang offs and completion and commissioning as a part of a new 145 kV cable system connecting Amager Power Plant (AMV) and Glentegård (GLN) substation to a new substation Oceankaj (OCE).
Se udbuddet » Nævnte leverandører:Zhongtian Technology Submarine Cable Co., Ltd
2021-03-22Framework Agreement for Cable Repair and Maintenance (Energinet Eltransmission A/S)
Through the establishment of the present framework agreement, the contracting authority wants to establish a framework agreement regarding preparedness and maintenance for supplying repair work (Jointing), manpower, standby fee, tools and spare parts for the repair of Energinets cables Offshore and Onshore (20 kV-525 kV).
Se udbuddet » Nævnte leverandører:NKT (Denmark) A/S
2020-05-05Framework Agreement for Cable Repair (Energinet Eltransmission A/S)
Through the establishment of the present framework agreement, the contracting authority wants to establish a framework agreement regarding preparedness for supplying repair work (jointing), manpower, standby fee, tools and spare parts for the repair of Energinets cables Offshore and Onshore (20 kV-525 kV).
Se udbuddet » Nævnte leverandører:NKT (Denmark) A/S
2020-03-03KBH02 — Kabel og Ledning — Udbud — Søkabel HK13018 AMV-SMK (Energinet Eltransmission A/S)
The contracting authority wants to purchase the complete functional supply of approximately 10 km 145 kV submarine cable system, including all labour, equipment and materials required for design, fabrication, factory testing, supply, construction, transition joints and hang offs, transport of cable to a harbour in Zealand, jointing works, completion and commissioning as a part of a new 145 kV cable system connecting Amager Power Plant (AMV) and Svanemølle substation (SMK).
Se udbuddet »
2011-07-19Indkøb af 12 kV søkabel til Agersø og Omø (SEAS-NVE Holding A/S)
Indkøb af 12 kV søarmeret radielt og langsgående vandtæt 3-leder PEX-isoleret kabel med 95 mm2 Al ledertværsnit.
Maksimalt vanddybde ca. 40 meter.
Levering tæt ved site senest den 31.7.2012 på 1 eller 2 tromler.
Se udbuddet »