The Contracting Authority wants to purchase Electricity Market Modelling Software. Energinet is relaying on electricity market forecasts as the foundation for any analysis, business case, electricity adequacy, budgeting, and other studies. Making qualified guesses on future elec-tricity prices, emissions, constraints, and market dynamics through simulations is therefore of great importance for Energinet. Energinet does this through market models, that can simulate a wide range of possible future European energy systems (electricity, heat, and hydrogen) on an hourly basis. The needs for Ener-ginet include a State-of-the-art electricity market model with the ability to handle sector coupling, i.e., gas, hydrogen, and heat. State-of-the-art is defined by market models able to handle complex international studies, such as ERAA22 and TYNDP22, while also having capabilities to simulate hydro power through water value calculation algorithms.
Deadline
Fristen for modtagelse af bud var på 2023-07-10.
Indkøbet blev offentliggjort på 2023-06-23.
Leverandører
Følgende leverandører er nævnt i tildelingsbeslutninger eller andre indkøbsdokumenter:
Udbudsbekendtgørelse (2023-06-23) Objekt Omfanget af udbuddet
Titel: It-tjenester: rådgivning, programmeludvikling, internet og support
Referencenummer: 23/06793 - 336331
Kort beskrivelse:
The Contracting Authority wants to purchase Electricity Market Modelling Software.
Energinet is relaying on electricity market forecasts as the foundation for any analysis, business case, electricity adequacy, budgeting, and other studies. Making qualified guesses on future elec-tricity prices, emissions, constraints, and market dynamics through simulations is therefore of great importance for Energinet.
Energinet does this through market models, that can simulate a wide range of possible future European energy systems (electricity, heat, and hydrogen) on an hourly basis. The needs for Ener-ginet include a State-of-the-art electricity market model with the ability to handle sector coupling, i.e., gas, hydrogen, and heat. State-of-the-art is defined by market models able to handle complex international studies, such as ERAA22 and TYNDP22, while also having capabilities to simulate hydro power through water value calculation algorithms.
The Contracting Authority wants to purchase Electricity Market Modelling Software.
Energinet is relaying on electricity market forecasts as the foundation for any analysis, business case, electricity adequacy, budgeting, and other studies. Making qualified guesses on future elec-tricity prices, emissions, constraints, and market dynamics through simulations is therefore of great importance for Energinet.
Energinet does this through market models, that can simulate a wide range of possible future European energy systems (electricity, heat, and hydrogen) on an hourly basis. The needs for Ener-ginet include a State-of-the-art electricity market model with the ability to handle sector coupling, i.e., gas, hydrogen, and heat. State-of-the-art is defined by market models able to handle complex international studies, such as ERAA22 and TYNDP22, while also having capabilities to simulate hydro power through water value calculation algorithms.
Procedure
Procedureform: Udbud efter forhandling
Bud-type: Indsendelse gældende for alle delaftaler
Kriterier for tildeling
Det økonomisk mest fordelagtige bud
Please note that this is a negotiated procedure. With the exception of mandatory parts, the Tender Documents may as a result undergo changes as part of the negotiation process.
Objekt Omfanget af udbuddet
Kort beskrivelse:
The Contracting Authority wants to purchase Electricity Market Modelling Software.
Energinet is relaying on electricity market forecasts as the foundation for any analysis, business case, electricity adequacy, budgeting, and other studies. Making qualified guesses on future elec-tricity prices, emissions, constraints, and market dynamics through simulations is therefore of great importance for Energinet.
Energinet is relaying on electricity market forecasts as the foundation for any analysis, business case, electricity adequacy, budgeting, and other studies. Making qualified guesses on future elec-tricity prices, emissions, constraints, and market dynamics through simulations is therefore of great importance for Energinet.
Energinet does this through market models, that can simulate a wide range of possible future European energy systems (electricity, heat, and hydrogen) on an hourly basis. The needs for Ener-ginet include a State-of-the-art electricity market model with the ability to handle sector coupling, i.e., gas, hydrogen, and heat. State-of-the-art is defined by market models able to handle complex international studies, such as ERAA22 and TYNDP22, while also having capabilities to simulate hydro power through water value calculation algorithms.
Energinet does this through market models, that can simulate a wide range of possible future European energy systems (electricity, heat, and hydrogen) on an hourly basis. The needs for Ener-ginet include a State-of-the-art electricity market model with the ability to handle sector coupling, i.e., gas, hydrogen, and heat. State-of-the-art is defined by market models able to handle complex international studies, such as ERAA22 and TYNDP22, while also having capabilities to simulate hydro power through water value calculation algorithms.
Energinet is relaying on electricity market forecasts as the foundation for any analysis, business case, electricity adequacy, budgeting, and other studies. Making qualified guesses on future electricity prices, emissions, constraints, and market dynamics through simulations is therefore of great importance for Energinet.
Energinet is relaying on electricity market forecasts as the foundation for any analysis, business case, electricity adequacy, budgeting, and other studies. Making qualified guesses on future electricity prices, emissions, constraints, and market dynamics through simulations is therefore of great importance for Energinet.
Energinet does this through market models, that can simulate a wide range of possible future European energy systems (electricity, heat, and hydrogen) on an hourly basis. The needs for Energinet include a State-of-the-art electricity market model with the ability to handle sector coupling, i.e., gas, hydrogen, and heat. State-of-the-art is defined by market models able to handle complex international studies, such as ERAA22 and TYNDP22, while also having capabilities to simulate hydro power through water value calculation algorithms.
Energinet does this through market models, that can simulate a wide range of possible future European energy systems (electricity, heat, and hydrogen) on an hourly basis. The needs for Energinet include a State-of-the-art electricity market model with the ability to handle sector coupling, i.e., gas, hydrogen, and heat. State-of-the-art is defined by market models able to handle complex international studies, such as ERAA22 and TYNDP22, while also having capabilities to simulate hydro power through water value calculation algorithms.
As Energinet will have users using the model on a day-to-day basis as well as users with more moderate needs, a flexible user access structure is needed. The wide range of user types also demands for an intuitive and logical Graphical User Interface (GUI) so that users quickly can get familiar with the model and themselves input data, run simulations, and access results. Results from the market model should be a wide array of detailed data relevant to the energy system, e.g., flows, prices generation, emissions, adequacy indicators, water values.
As Energinet will have users using the model on a day-to-day basis as well as users with more moderate needs, a flexible user access structure is needed. The wide range of user types also demands for an intuitive and logical Graphical User Interface (GUI) so that users quickly can get familiar with the model and themselves input data, run simulations, and access results. Results from the market model should be a wide array of detailed data relevant to the energy system, e.g., flows, prices generation, emissions, adequacy indicators, water values.
The model needs to be suitable for implementation and running on private cloud (or on-premises) solutions. The underlying data and databases will be available for Energinet users only. Energinet should be able to backup, store and restore databases up to 10 years back in time – meaning that the supplier must provide solutions so that this can be achieved. After end of contract a view-only mode should be available for Energinet, so that any archived databases can be restored with all input- and output data.
The model needs to be suitable for implementation and running on private cloud (or on-premises) solutions. The underlying data and databases will be available for Energinet users only. Energinet should be able to backup, store and restore databases up to 10 years back in time – meaning that the supplier must provide solutions so that this can be achieved. After end of contract a view-only mode should be available for Energinet, so that any archived databases can be restored with all input- and output data.
For further details concerning the purchase, reference is made to the Tender Documents.
Anslået værdi uden moms: 25 000 000 DKK 💰
Varighed: 240 måneder
Yderligere oplysninger:
Please note that this is a negotiated procedure. With the exception of mandatory parts, the Tender Documents may as a result undergo changes as part of the negotiation process.
Juridiske, økonomiske, finansielle og tekniske oplysninger Betingelser for deltagelse
Økonomisk og finansiel stilling:
The applicant must confirm the economic ability in the ESPD part IV.B: “Economic and financial standing” with information from the latest annual report regarding the following economic indicators:
2. Equity ratio (equity/total assets). This must be stated with two decimals.
If the applicant is relying on the capacities of one or more other entities (e.g. a parent or sister company or a subcontractor) or the applicant is a group of economic operators (e.g. a consortium) the information for the ESPD part IV.B must also be given in a separate ESPD from each of these entities, cf. section VI.3 “Additional information”. It is the sole responsibility of the applicant to secure that the minimum level(s) of standards required are reached on the basis of consolidation when the applicant is relying on the capacity of other entities or when the applicant is a group of economic operators (e.g. a consortium).
If the applicant is relying on the capacities of one or more other entities (e.g. a parent or sister company or a subcontractor) or the applicant is a group of economic operators (e.g. a consortium) the information for the ESPD part IV.B must also be given in a separate ESPD from each of these entities, cf. section VI.3 “Additional information”. It is the sole responsibility of the applicant to secure that the minimum level(s) of standards required are reached on the basis of consolidation when the applicant is relying on the capacity of other entities or when the applicant is a group of economic operators (e.g. a consortium).
Mindstekrav til niveauet:
Concerning 1: Equity from the latest annual report must, at the time of prequalification, be at least DKK 750.000.
Concerning 2: Equity ratio from the latest annual report must, at the time of prequalification, be at least 20 pct. If the equity ratio is between 15 pct. and 20 pct. the applicant can qualify if Equity exceeds DKK 25 mio.
Teknisk og faglig kompetence:
The applicant can inclue the up to 3 most comparable and relevant references undertaken in the past three (3) years as part of the application. The references must be stated in the ESPD part IV.C: “Technical and professional ability”. Undertaken in the past three (3) years implies that the reference must not have been completed prior to the date reached when counting 3 years backwards from the submission date for prequalification. References older than this will not be taken into consideration. References which have not yet been fully completed can be included as part of the application, but if this is the case, the applicant must describe the parts which have not yet been delivered, and this may affect the evaluation of the applicant, cf. section II.2.9.
The applicant can inclue the up to 3 most comparable and relevant references undertaken in the past three (3) years as part of the application. The references must be stated in the ESPD part IV.C: “Technical and professional ability”. Undertaken in the past three (3) years implies that the reference must not have been completed prior to the date reached when counting 3 years backwards from the submission date for prequalification. References older than this will not be taken into consideration. References which have not yet been fully completed can be included as part of the application, but if this is the case, the applicant must describe the parts which have not yet been delivered, and this may affect the evaluation of the applicant, cf. section II.2.9.
The references should include:
• A specific description of the work performed for each reference, including:
• The model described in the reference must be used by a European TSO (Transmission System Operator) or the ENTSO-E (European Network of Transmission System Operators for Electrici-ty) at the current time (deadline for submission of application).Contract value (if possible)
• The model described in the reference must be used by a European TSO (Transmission System Operator) or the ENTSO-E (European Network of Transmission System Operators for Electrici-ty) at the current time (deadline for submission of application).Contract value (if possible)
• Contact information for the entity in question (including contact person)
• Date of initiation and final delivery (day, month, year)
If more then 3 Envisaged number of candidates are fulfills the above specification, the 3 most collectible candidates will be chosen, based on the most comparable conditions in the references in relation to this tender.
Any ambiguities and/or incomprehensibilities concerning the above information may have a negative effect on the selection of candidates, cf. section II.2.9. Please note the “description” box can contain more text than is visible. I.e. it is possible to copy paste text into the box.
Any ambiguities and/or incomprehensibilities concerning the above information may have a negative effect on the selection of candidates, cf. section II.2.9. Please note the “description” box can contain more text than is visible. I.e. it is possible to copy paste text into the box.
If the applicant is relying on the references of one or more other entities (e.g. a parent or sister company or a subcontractor) or the applicant is a group of economic operators (e.g. a consortium) the information for the ESPD part IV.C must also be given in a separate ESPD from each of these entities.
If the applicant is relying on the references of one or more other entities (e.g. a parent or sister company or a subcontractor) or the applicant is a group of economic operators (e.g. a consortium) the information for the ESPD part IV.C must also be given in a separate ESPD from each of these entities.
The number of references should not surpass a maximum of the 3 most comparable and relevant references. If the applicant is relying on the capacity of one or more other entities (e.g. a parent or sister company or a subcontractor) or the applicant is a group of economic operators (e.g. a consor-tium) the maximum number of references to be submitted must still be respected and cannot exceed 3 when combined. If more than 3 references are submitted, the Contracting Authority will only consider the 3 most recent references determined by date of final delivery (in this case not yet finished references will not be included).
The number of references should not surpass a maximum of the 3 most comparable and relevant references. If the applicant is relying on the capacity of one or more other entities (e.g. a parent or sister company or a subcontractor) or the applicant is a group of economic operators (e.g. a consor-tium) the maximum number of references to be submitted must still be respected and cannot exceed 3 when combined. If more than 3 references are submitted, the Contracting Authority will only consider the 3 most recent references determined by date of final delivery (in this case not yet finished references will not be included).
Mindstekrav til niveauet:
It is required as a minimum that the applicant includes at least 2 references, where both require-ments are included in the same reference.
The model described in the reference must be used by a European TSO (Transmission System Operator) or the ENTSO-E (European Network of Transmission System Operators for Electricity) at the current time (deadline for submission of application).
Liste og kortfattet beskrivelse af regler og kriterier:
The applicant must submit a completed version of the ESPD.
Applicants may not be subject to the mandatory grounds for exclusion, cf. the Danish Public Procurement Act (udbudsloven) Section 135 (1-3) and 136.
Please see section VI.3 “Additional information” for further information regarding the ESPD. The application must be submitted through EU-Supply, cf. link in section I.1 in this notification. Applications not submitted via EU-supply or received after the deadline will not be accepted.
Liste og kortfattet beskrivelse af regler og kriterier
Please see section VI.3 “Additional information” for further information regarding the ESPD. The application must be submitted through EU-Supply, cf. link in section I.1 in this notification. Applications not submitted via EU-supply or received after the deadline will not be accepted.
The Contracting Authority reserves the right to request the applicant to supplement, specify or complete the information submitted.
Kontraktens udførelse
Krav om deponering og sikkerhedsstillelse: The information is stated in the Tender Documents.
De vigtigste finansieringsbetingelser og betalingsordninger og/eller henvisning til de relevante bestemmelser, der regulerer dem: The information is stated in the Tender Documents.
Den juridiske form, som den sammenslutning af økonomiske aktører, der skal have kontrakten, skal have:
No special legal form is required.
If the agreements are awarded to a group of economic operators (e.g. a consortium) the partici-pants are required to undertake joint and several liabilities and to appoint one economic operator to represent the group.
Betingelser for opfyldelse af kontrakten: The information is stated in the Tender Documents.
Procedure
Retsgrundlag: 32014L0025
Påtænkt antal ansøgere: 3
Objektive kriterier for udvælgelse af det begrænsede antal ansøgere:
If more than 3 applicants fulfill the minimum requirements, cf. section III, the Contracting Authority will prequalify the 3 applicants who are evaluated as most qualified for the specific tendered assignment. Only these applicants will be invited to submit a tender. The selection of the applicants will be based on the relevance of the submitted references, cf. the scope stated in section II.2.4, and the extent to which the references overall demonstrate comprehensive experience with deliveries comparable to the tendered assignment regarding solution, complexity and scope, especially concerning:
Objektive kriterier for udvælgelse af det begrænsede antal ansøgere
If more than 3 applicants fulfill the minimum requirements, cf. section III, the Contracting Authority will prequalify the 3 applicants who are evaluated as most qualified for the specific tendered assignment. Only these applicants will be invited to submit a tender. The selection of the applicants will be based on the relevance of the submitted references, cf. the scope stated in section II.2.4, and the extent to which the references overall demonstrate comprehensive experience with deliveries comparable to the tendered assignment regarding solution, complexity and scope, especially concerning:
• The model has been used in ENTSO-E projects such as Ten Year Network Development Plan, European Resource Adequacy Assessment (previously Midterm Adequacy Forecast) and Seasonal Outlooks, either by ENTSO-E or by a TSO. This can be both as the published tool or as a benchmarking tool used in the alignment process.
Objektive kriterier for udvælgelse af det begrænsede antal ansøgere
• The model has been used in ENTSO-E projects such as Ten Year Network Development Plan, European Resource Adequacy Assessment (previously Midterm Adequacy Forecast) and Seasonal Outlooks, either by ENTSO-E or by a TSO. This can be both as the published tool or as a benchmarking tool used in the alignment process.
• The model is used by European TSOs, with more relevance given to TSOs located in similar part of the European system as Denmark (i.e. Northern Europe).
Tidspunkt for modtagelse af tilbud: 16:00
Sprog, på hvilke bud eller ansøgninger om deltagelse kan indgives: engelsk 🗣️
Tilbuddets gyldighedsperiode: 6 måneder
The applicant must submit a completed ESPD to apply for prequalification for this tender procedure. The ESPD for this tender can be found via EU-supply. The ESPD must be completed in EU-Supply and submitted via “My Response”. A guide to the ESPD can be found on the webpage of the Competition and Consumer Authority (www.kfst.dk) in Danish (the Contracting Authority is not responsible for the content of the guide).
The applicant must submit a completed ESPD to apply for prequalification for this tender procedure. The ESPD for this tender can be found via EU-supply. The ESPD must be completed in EU-Supply and submitted via “My Response”. A guide to the ESPD can be found on the webpage of the Competition and Consumer Authority (www.kfst.dk) in Danish (the Contracting Authority is not responsible for the content of the guide).
Please note:
- An applicant participating on its own, but relying on the capacities of one or more other entities (e.g. a parent or sister company or a subcontractor), must ensure that the application includes the applicants own ESPD together with a separate ESPD from each of the entities it relies on with a completed part II: “Information concerning the economic operator” and part III: “Exclu-sion grounds” of the ESPD as well as the relevant information regarding part IV: “Selection crite-ria” and part V: “Reduction of the number of qualified candidates”. The ESPD from each of the entities should be duly filled and signed by the entities concerned.
- An applicant participating on its own, but relying on the capacities of one or more other entities (e.g. a parent or sister company or a subcontractor), must ensure that the application includes the applicants own ESPD together with a separate ESPD from each of the entities it relies on with a completed part II: “Information concerning the economic operator” and part III: “Exclu-sion grounds” of the ESPD as well as the relevant information regarding part IV: “Selection crite-ria” and part V: “Reduction of the number of qualified candidates”. The ESPD from each of the entities should be duly filled and signed by the entities concerned.
Further where an applicant wants to rely on the capacities of other entities, it shall prove to the contracting authority that it will have at its disposal the resources necessary, for example, by producing a commitment by those entities to that effect, which must be submitted as part of the final documentation.
Further where an applicant wants to rely on the capacities of other entities, it shall prove to the contracting authority that it will have at its disposal the resources necessary, for example, by producing a commitment by those entities to that effect, which must be submitted as part of the final documentation.
- Where groups of economic operators, including temporary associations, participate together in the procurement procedure, a complete separate ESPD for each of the participating economic operators must be submitted.
Further the final documentation must include a signed declaration by all parties of the group of economic operators (joint venture, consortium or other) stating that all economic operators as-sume joint and several liabilities towards the Contracting Authority for the performance of the contract as a whole.
Further the final documentation must include a signed declaration by all parties of the group of economic operators (joint venture, consortium or other) stating that all economic operators as-sume joint and several liabilities towards the Contracting Authority for the performance of the contract as a whole.
Complaints regarding a candidate not being pre-qualified must be filed with The Complaints Board for Public Procurement within 20 calendar days starting the day after the contracting authority has sent notification to the candidates involved, provided that the notification includes a short account of the relevant reasons for the decision.
Complaints regarding a candidate not being pre-qualified must be filed with The Complaints Board for Public Procurement within 20 calendar days starting the day after the contracting authority has sent notification to the candidates involved, provided that the notification includes a short account of the relevant reasons for the decision.
Other complaints must be filed with The Complaints Board for Public Procurement within:
1. 45 calendar days after the contracting authority has published a contract award notice in the Official Journal of the European Union (with effect from the day following the publi-cation date);
2. 30 calendar days starting the day after the contracting authority has informed the ten-derers in question, that the contracting authority has entered into a contract based on a framework agreement through reopening of competition or a dynamic purchasing sys-tem, provided that the notification includes a short account of the relevant reasons for the decision.
2. 30 calendar days starting the day after the contracting authority has informed the ten-derers in question, that the contracting authority has entered into a contract based on a framework agreement through reopening of competition or a dynamic purchasing sys-tem, provided that the notification includes a short account of the relevant reasons for the decision.
3. 6 months starting the day after the contracting authority has sent notification to the can-didates/tenderers involved that the contracting authority has entered into the framework agreement, provided that the notification included a short account of the relevant rea-sons for the decision.
3. 6 months starting the day after the contracting authority has sent notification to the can-didates/tenderers involved that the contracting authority has entered into the framework agreement, provided that the notification included a short account of the relevant rea-sons for the decision.
Tjeneste, hvorfra der kan indhentes oplysninger om klageproceduren
Navn: Konkurrence- og Forbrugerstyrelsen
Postadresse: Carl Jacobsen Vej 35
Postby: Valby
Postnummer: 2500
Telefon: +45 41715000📞
E-mail: kfst@kfst.dk📧
Internetadresse: http://www.kfst.dk🌏
Kilde: OJS 2023/S 122-388447 (2023-06-23)
Bekendtgørelse om indgåede kontrakter (2023-11-23) Objekt Omfanget af udbuddet
Den samlede værdi af udbuddet: 17 741 000 DKK 💰
Bekendtgørelsens metadata
Dokumenttype: Bekendtgørelse om indgåede kontrakter
Tildeling af kontrakt
Dato for kontraktindgåelse: 2023-11-15 📅
Navn: AFRY Consult AS
Nationalt registreringsnummer: 934 948 262
Postadresse: Lille Grensen 5
Postby: Oslo
Postnummer: 0159
Land: Norge 🇳🇴
Oslo
🏙️
Den samlede værdi af udbuddet: 17 741 000 DKK 💰
Supplerende oplysninger Gennemgå organ
Navn: Klagenævnet for Udbud
Kilde: OJS 2023/S 229-721198 (2023-11-23)