Objekt Omfanget af udbuddet
Titel: Turntable for Spare Offshore Cable – Viking Link
21/09091
Produkter/tjenester: Produkter til konstruktioner📦
Kort beskrivelse:
“The Contracting Authority wants to purchase a Turntable for 15 km Spare Offshore cable for the international project Viking Link.”
Anslået værdi uden moms: EUR 2 600 000 💰
1️⃣
Yderligere produkter/tjenester: Kabeltilbehør, isoleret📦
Yderligere produkter/tjenester: Kabeltromler📦
Sted for udførelsen: Danmark🏙️
Hovedsted eller sted for udførelsen: Esbjerg Harbor
Beskrivelse af udbuddet:
“The Contracting Authority wants to purchase a Turntable for 15 km Spare Offshore cable for the international project Viking Link. In case of emergencies or...”
Beskrivelse af udbuddet
The Contracting Authority wants to purchase a Turntable for 15 km Spare Offshore cable for the international project Viking Link. In case of emergencies or damage on the Off-shore cable a spare cable is necessary and to handle the spare cable a turntable for unloading and loading from the ship is required. The tender concerns design of a Turnta-ble able to handle 1000 t (carrying capacity), design of cable handling equipment, manu-facturing and installation of turntable and manufacturing and installation of cable han-dling equipment including cable rollers, caterpillar, cable tensioner and chute.
The Ttrntable will be placed at the harbor of Esbjerg which is an area with high risk of cor-rosion.
Vis mere Kriterier for tildeling
Prisen er ikke det eneste tildelingskriterium, og alle kriterier er kun anført i udbudsdokumenterne
Omfanget af udbuddet
Anslået samlet værdi ekskl. moms: EUR 2 600 000 💰
Kontraktens, rammeaftalens eller det dynamiske indkøbssystems varighed
Nedenstående tidsramme er udtrykt i antal måneder.
Beskrivelse
Varighed: 12
Oplysninger om begrænsningerne i antallet af ansøgere, der kan indbydes
Påtænkt minimumsantal: 3
Maksimalt antal: 5
Objektive kriterier for udvælgelse af det begrænsede antal ansøgere:
“If more than 5 applicants fulfill the minimum requirements, cf. section III, the Contracting Authority will prequalify the 3-5 applicants who are evaluated...”
Objektive kriterier for udvælgelse af det begrænsede antal ansøgere
If more than 5 applicants fulfill the minimum requirements, cf. section III, the Contracting Authority will prequalify the 3-5 applicants who are evaluated as most qualified for the specific tendered assignment. Only these applicants will be invited to submit a tender. The selection of the applicants will be based on the relevance of the submitted references, cf. the scope stated in section II.2.4 and the Tender Document ‘Scope of work’, doc.no. 21/09091-1, and the extent to which the references overall demonstrate comprehensive experience with deliveries comparable to the tendered assignment regarding solution, complexity and scope. As such, references demonstrating experience with construction of large steel constructions used for cable handling, with a carrying capacity similar to the one required for this tender and with a corrosion protection of C5M (or equivalent) or higher will take precedence over references only including one or more, but not all, of the characteristics.
Vis mere Beskrivelse
Yderligere oplysninger:
“Please note that this is a negotiated procedure. With the exception of mandatory parts, the Tender Documents may as a result undergo changes as part of the...”
Yderligere oplysninger
Please note that this is a negotiated procedure. With the exception of mandatory parts, the Tender Documents may as a result undergo changes as part of the negotiation process.
Juridiske, økonomiske, finansielle og tekniske oplysninger Økonomisk og finansiel stilling
Liste og kortfattet beskrivelse af udvælgelseskriterier:
“The applicant must confirm the economic ability in the ESPD part IV.B: “Economic and financial standing” with information from the latest annual report...”
Liste og kortfattet beskrivelse af udvælgelseskriterier
The applicant must confirm the economic ability in the ESPD part IV.B: “Economic and financial standing” with information from the latest annual report regarding the following economic indicators:
1. Equity (total equity incl. share capital, reserves, revaluation, retained earning etc.)
2. Equity ratio (equity/total assets)
If the applicant is relying on the capacities of one or more other entities (e.g. a parent or sister company or a subcontractor) or the applicant is a group of economic operators (e.g. a consortium) the information for the ESPD part IV.B must also be given in a separate ESPD from each of these entities, cf. section VI.3 “Additional information”. It is the sole responsibility of the applicant to secure that the minimum level(s) of standards required are reached on the basis of consolidation when the applicant is relying on the capacity of other entities or when the applicant is a group of economic operators (e.g. a consortium).
“Concerning 1: Equity from the latest annual report must be at least 858.000 €.
Concerning 2: Equity ratio from the latest annual report must be at least 20...”
Concerning 1: Equity from the latest annual report must be at least 858.000 €.
Concerning 2: Equity ratio from the latest annual report must be at least 20 pct. If the equity ratio is between 15 pct. and 20 pct. the applicant can qualify, if Equity exceeds the total expected amount of the contract.
Vis mere Teknisk og faglig kompetence
Liste og kortfattet beskrivelse af udvælgelseskriterier:
“The applicant must include the up to 4 most comparable and relevant references undertaken in the past ten (10) years as part of the application. The...”
Liste og kortfattet beskrivelse af udvælgelseskriterier
The applicant must include the up to 4 most comparable and relevant references undertaken in the past ten (10) years as part of the application. The references must be stated in the ESPD part IV.C: “Technical and professional ability”. Further, the references may also be included in the attached reference sheet, cf. doc.no. 21/09091-10. If this is chosen, the Contracting Authority recommends that the name of the references are included in the ESPD and the detailed information is included in the reference sheet.
Undertaken in the past ten years implies that the reference must not have been completed prior to the date reached when counting ten years backwards from the submission date for prequalification. References older than this will not be taken into consideration. References which have not yet been fully completed can be included as part of the application, but if this is the case, the applicant must describe the parts which have not yet been delivered, and this may affect the evaluation of the applicant, cf. section II.2.9.
The references should include:
1. Description of the steel construction delivered, including:
• Purpose of the steel construction
• Load bearing capacity
• Corrosion protection
3. Date of initiation and final delivery (day, month, year)
4. End customer
5. Place of installation
6. Contact at End Customer
Any ambiguities and/or incomprehensibilities concerning the above information may have a negative effect on the selection of candidates, cf. section II.2.9. Please note the “description” box can contain more text than is visible. I.e. it is possible to copy paste text into the box.
If the applicant is relying on the references of one or more other entities (e.g. a parent or sister company or a subcontractor) or the applicant is a group of economic operators (e.g. a consortium) the information for the ESPD part IV.C must also be given in a separate ESPD from each of these entities.
The number of references should not surpass a maximum of the 4 most comparable and relevant references. If the applicant is relying on the capacity of one or more other entities (e.g. a parent or sister company or a subcontractor) or the applicant is a group of economic operators (e.g. a consortium) the maximum number of references to be submitted must still be respected and cannot exceed 4 when combined. If more than 4 references are submitted, the Contracting Authority will only consider the 4 most recent references determined by date of final delivery (in this case not yet finished references will not be included unless less than 4 references have been completed, in which case the selection will be made on the basis of the earliest initiation date).
Vis mere Betingelser for deltagelse
Betingelser for deltagelse (tekniske og faglige kvalifikationer):
“The applicant must as a minimum submit one (1) delivered reference that have a Corrosion Protec-tion class of C5M (or equivalent) or higher. The term...”
Betingelser for deltagelse (tekniske og faglige kvalifikationer)
The applicant must as a minimum submit one (1) delivered reference that have a Corrosion Protec-tion class of C5M (or equivalent) or higher. The term “delivered” is to be understood as the time when the construction has been handed over to the End Customer.
Vis mere
Liste og kortfattet beskrivelse af regler og kriterier:
“The applicant must submit a completed version of the ESPD.
Applicants may not be subject to the mandatory grounds for exclusion, cf. the Danish Public...”
Liste og kortfattet beskrivelse af regler og kriterier
The applicant must submit a completed version of the ESPD.
Applicants may not be subject to the mandatory grounds for exclusion, cf. the Danish Public Procurement Act (udbudsloven) Section 135 (1-3) and 136.
Please see section VI.3 “Additional information” for further information regarding the ESPD. The application must be submitted through EU-Supply, cf. link in section I.1 in this notification. Applications not submitted via EU-supply or received after the deadline will not be accepted.
The Contracting Authority reserves the right to request the applicant to supplement, specify or complete the information submitted.
Vis mere
Krav om deponering og sikkerhedsstillelse: The information is stated in the Tender Documents.
De vigtigste finansieringsbetingelser og betalingsordninger og/eller henvisning til de relevante bestemmelser, der regulerer dem: The information is stated in the Tender Documents.
Den juridiske form, som den sammenslutning af økonomiske aktører, der skal have kontrakten, skal have:
“No special legal form is required.
If the agreements are awarded to a group of economic operators (e.g. a consortium) the partici-pants are required to...”
Den juridiske form, som den sammenslutning af økonomiske aktører, der skal have kontrakten, skal have
No special legal form is required.
If the agreements are awarded to a group of economic operators (e.g. a consortium) the partici-pants are required to undertake joint and several liabilities and to appoint one economic operator to represent the group.
Vis mere Betingelser i forbindelse med kontrakten
Betingelser for opfyldelse af kontrakten: The information is stated in the Tender Documents.
Procedure Type af procedure
Forhandlet procedure med forudgående indkaldelse af konkurrencer
Oplysninger om reduktion af antallet af løsninger eller tilbud under forhandling eller dialog
Anvendelse af en trinvis procedure for gradvist at reducere antallet af løsninger, der skal drøftes, eller af tilbud, der skal forhandles
Administrative oplysninger
Frist for modtagelse af bud eller ansøgninger om deltagelse: 2022-02-04
12:00 📅
Sprog, på hvilke bud eller ansøgninger om deltagelse kan indgives: engelsk 🗣️
Nedenstående tidsramme er udtrykt i antal måneder.
Minimumsfrist, inden for hvilken tilbudsgiveren skal opretholde tilbuddet: 2
Supplerende oplysninger Oplysninger om elektroniske arbejdsgange
Elektronisk fakturering vil blive accepteret
Der vil blive anvendt elektronisk betaling
Yderligere oplysninger
“The applicant must submit a completed ESPD to apply for prequalification for this tender procedure. The ESPD for this tender can be found via EU-supply. The...”
The applicant must submit a completed ESPD to apply for prequalification for this tender procedure. The ESPD for this tender can be found via EU-supply. The ESPD must be completed in EU-Supply and submitted via “My Response”.
Please note:
- An applicant participating on its own, but relying on the capacities of one or more other entities (e.g. a parent or sister company or a subcontractor), must ensure that the application includes the applicants own ESPD together with a separate ESPD from each of the entities it relies on with a completed part II: “Information concerning the economic operator” and part III: “Exclusion grounds” of the ESPD as well as the relevant information regarding part IV: “Selection criteria” and part V: “Reduction of the number of qualified candidates”. The ESPD from each of the entities should be duly filled and signed by the entities concerned.
Further where an applicant wants to rely on the capacities of other entities, it shall prove to the contracting authority that it will have at its disposal the resources necessary, for example, by producing a commitment by those entities to that effect, which must be submitted as part of the final documentation .
- Where groups of economic operators, including temporary associations, participate together in the procurement procedure, a complete separate ESPD for each of the participating economic operators must be submitted.
Further the final documentation must include a signed declaration by all parties of the group of economic operators (joint venture, consortium or other) stating that all economic operators as-sume joint and several liabilities towards the Contracting Authority for the performance of the contract as a whole.
Bekendtgørelse om indgåede kontrakter (2022-02-14) Procedure Administrative oplysninger
Tidligere offentliggørelse vedrørende denne procedure: 2022/S 016-039259
Tildeling af kontrakt
1️⃣
Kontraktnummer: 1
Titel: Turntable for Spare Offshore Cable – Viking Link
Oplysninger om ikke-tilskudsgivende
Der blev ikke modtaget nogen bud eller ansøgninger om deltagelse, eller alle blev afvist
Supplerende oplysninger Yderligere oplysninger
“As a consequence of no suitable requests to participate the tender is cancelled.
The Contracting Authority will proceed by use of a negotiated procedure...”
As a consequence of no suitable requests to participate the tender is cancelled.
The Contracting Authority will proceed by use of a negotiated procedure without prior call for competition, cf. article 50 (a) of the utilities directive (directive 2014/25/EU). A new contract notice will therefore not be published