The commissioning manager will – in collaboration with project management for Everdrup compres-sor station – be responsible for ensuring that the overall requirements of the project are implemented and complied with during the execution of the work. The commissioning manager is responsible for ensuring compliance with the Baltic Pipe project’s overall commissioning strategy and associated schedule in the ‘Everdrup compressor station’ project. Organisationally, the commissioning manager will be reporting to the project management of the Everdrup compressor station project.
Deadline
Fristen for modtagelse af bud var på 2021-02-22.
Indkøbet blev offentliggjort på 2021-02-05.
Objekt Omfanget af udbuddet
Titel:
“Commissioning Manager for the Baltic Pipe Project at the Compressor Station Everdrup
21/01088”
Produkter/tjenester: Arkitekt-, konstruktions-, ingeniør- og inspektionsvirksomhed📦
Kort beskrivelse:
“The commissioning manager will – in collaboration with project management for Everdrup compres-sor station – be responsible for ensuring that the overall...”
Kort beskrivelse
The commissioning manager will – in collaboration with project management for Everdrup compres-sor station – be responsible for ensuring that the overall requirements of the project are implemented and complied with during the execution of the work. The commissioning manager is responsible for ensuring compliance with the Baltic Pipe project’s overall commissioning strategy and associated schedule in the ‘Everdrup compressor station’ project. Organisationally, the commissioning manager will be reporting to the project management of the Everdrup compressor station project.
The Baltic Pipe Project is a major gas infrastructure project that aims at creating a new supply corridor for gas in the European gas market; for the first time, it will enable shippers to flow gas directly from Norway to the markets in Denmark, Sweden and Poland together with their neighbouring markets. Moreover, it will also enable shippers to flow gas bidirectional from Poland to the Danish and Swedish markets.
The Baltic Pipe project will facilitate transport of Norwegian gas to Poland via Denmark. The total project includes the following main components:
• connection between the Norwegian grid (Europipe II) and the Danish grid;
• expansion of the gas transmission grid onshore Denmark;
• new compressor station in eastern Zealand at Everdrup;
• new offshore pipeline between Denmark and Poland;
• expansion of the Polish onshore grid.
The connection between the Norwegian grid and Denmark includes a Pipeline end manifold (PLEM) at the connection point to Europipe II, an offshore pipeline in the North Sea, a receiving terminal at Nybro and onshore pipeline from landfall at the Danish west coast to the terminal.
The contracting authority wants to purchase consultancy services in form of a commissioning manager to the Baltic Pipe project. The geographical location for the purchased services is at the Compressor Station Everdrup, Zealand, Denmark.
The tender is concerning a Commissioning Manager.
The commissioning manager will – in collaboration with project management for Everdrup compressor station – be responsible for ensuring that the overall requirements of the project are implemented and complied with during the execution of the work. The commissioning manager is responsible for ensuring compliance with the Baltic Pipe project’s overall commissioning strategy and associated schedule in the ‘Everdrup compressor station’ project. Organisationally, the commissioning manager will be reporting to the project management of the Everdrup compressor station project.
For further details we refer to 18/02255-77
Vis mere Kriterier for tildeling
Prisen er ikke det eneste tildelingskriterium, og alle kriterier er kun anført i udbudsdokumenterne
Omfanget af udbuddet
Anslået samlet værdi ekskl. moms: DKK 3 000 000 💰
Varighed
Startdato: 2021-04-19 📅
Slutdato: 2022-12-31 📅
Oplysninger om begrænsningerne i antallet af ansøgere, der kan indbydes
Påtænkt minimumsantal: 3
Maksimalt antal: 5
Objektive kriterier for udvælgelse af det begrænsede antal ansøgere:
“If more than 5 applicants fulfill the minimum requirements, cf. section III, the contracting authority will pre-qualify the 3-5 applicants who are evaluated...”
Objektive kriterier for udvælgelse af det begrænsede antal ansøgere
If more than 5 applicants fulfill the minimum requirements, cf. section III, the contracting authority will pre-qualify the 3-5 applicants who are evaluated as most qualified for the specific tendered assignment. Only these applicants will be invited to submit a tender. The selection of the applicants will be based on the submitted references. That is to which extend the reference(s) are assed to be similar to the tendered assignment, cf. section II.2.4), in terms of comparability and relevance. As a result, the number of references will not be the determining factor alone, but more importantly to which degree the specific forwarded references are comparable and relevant to the tendered assignment regarding project type, project scale, complexity and the role and responsibilities completed by the applicant with respect to the role as commissioning manager, compression gas Station.
Vis mere Oplysninger om valgmuligheder
Indstillinger ✅
Beskrivelse af mulighederne: Option for extension: 2 x 3 months.
Beskrivelse
Yderligere oplysninger:
“That this is a negotiated procedure. With the exception of mandatory parts, the tender documents, and requirements set out herein, may be changed as part of...”
Yderligere oplysninger
That this is a negotiated procedure. With the exception of mandatory parts, the tender documents, and requirements set out herein, may be changed as part of the negotiation process. As a result, the contracting authority encourages all economic operators to submit questions concerning the tender documents and apply for pre-qualification even if a requirement may present a challenge initially.
Juridiske, økonomiske, finansielle og tekniske oplysninger Økonomisk og finansiel stilling
Liste og kortfattet beskrivelse af udvælgelseskriterier:
“The applicant must confirm the economic ability in the ESPD part IV.B: ‘Economic and financial standing’ with information from the latest annual report...”
Liste og kortfattet beskrivelse af udvælgelseskriterier
The applicant must confirm the economic ability in the ESPD part IV.B: ‘Economic and financial standing’ with information from the latest annual report regarding the following economic indicators:
1) Equity (total equity incl. share capital, reserves, revaluation, retained earning etc.);
2) Equity ratio (equity/total assets).
If the applicant is relying on the capacities of one or more other entities (e.g. a parent or sister company or a subcontractor) or the applicant is a group of economic operators (e.g. a consortium) the information for the ESPD part IV.B must also be given in a separate ESPD from each of these entities, cf. section VI.3 ‘Additional information’. It is the sole responsibility of the applicant to secure that the minimum level(s) of standards required are reached when the applicant is relying on the capacity of other entities or when the applicant is a group of economic operators (e.g. a consortium).
“Concerning 1: The equity from the latest annual report must be at least DDK 800 000.00.
Concerning 2: The equity ratio from the latest annual report must be...”
Concerning 1: The equity from the latest annual report must be at least DDK 800 000.00.
Concerning 2: The equity ratio from the latest annual report must be at least 20 pct.
• If the equity ratio is between 15 pct. and 20 pct. the applicant can qualify, if equity exceeds the total expected amount of the contract.
Vis mere Teknisk og faglig kompetence
Liste og kortfattet beskrivelse af udvælgelseskriterier:
“The applicant must include up to 5 comparable and relevant references undertaken in the past ten (10) years as part of the application. The references must...”
Liste og kortfattet beskrivelse af udvælgelseskriterier
The applicant must include up to 5 comparable and relevant references undertaken in the past ten (10) years as part of the application. The references must be stated in the ESPD part IV.C: ‘Technical and professional ability’. Undertaken in the past ten (10) years implies that the reference must not have been completed prior to the date reached when counting ten (10) years backwards from the submission date for pre-qualification. References older than this will not be taken into consideration. References which have not yet been fully completed can be included as part of the application, but if this is the case, the applicant must describe the parts which have not yet been delivered, and this may affect the evaluation of the applicant, cf. section II.2.9).
The references shall be assignments performed for gas and oil construction projects comparable to the current assignment and should at least include the following information:
• Detailed description of the reference (please note the ‘description’ box can contain more text than is visible. I.e. it is possible to copy paste text into the box), including:
— the completed scope,
— the role and task performed,
— type of project;
• reference title;
• contract value (if possible);
• date of initiation and final delivery (day, month, year);
• name and type of client company;
• contact information for the entity in question (including contact person name, email and phone number).
The contracting authority reserves the right to contact the stated references.
If the applicant is relying on the references of one or more other entities (e.g. a parent or sister company or a subcontractor) or the applicant is a group of economic operators (e.g. a consortium) the information for the ESPD part IV.C must also be given in a separate ESPD from each of these entities.
The number of references should not surpass a maximum of the 5 most comparable and relevant references. If the applicant is relying on the capacity of one or more other entities (e.g. a parent or sister company or a subcontractor) or the applicant is a group of economic operators (e.g. a consortium) the maximum number of references to be submitted must still be respected and cannot exceed 5 when combined. If the reference list(s) includes more than 5 references, the Contracting Authority will only consider the 5 most recent references determined by date of final delivery (in this case not yet finished references will not be included).
Vis mere Betingelser for deltagelse
Liste og kortfattet beskrivelse af regler og kriterier:
“Please see section VI.3) ‘Additional information’ for further information regarding the ESPD. The application must be submitted through EU-Supply, cf. link...”
Liste og kortfattet beskrivelse af regler og kriterier
Please see section VI.3) ‘Additional information’ for further information regarding the ESPD. The application must be submitted through EU-Supply, cf. link in section I.1 in this notification. Applications not submitted via EU-supply or received after the deadline will not be accepted.
The contracting authority reserves the right to request the applicant to supplement, specify or complete the information submitted.
Vis mere
Krav om deponering og sikkerhedsstillelse: No deposits or guarantees are required for this tender.
De vigtigste finansieringsbetingelser og betalingsordninger og/eller henvisning til de relevante bestemmelser, der regulerer dem:
“The information is stated in the tender documents. See especially the general terms and conditions (doc. 21/01088-6), Section 6.”
Den juridiske form, som den sammenslutning af økonomiske aktører, der skal have kontrakten, skal have:
“No special legal form is required.
If the agreements are awarded to a group of economic operators (e.g. a consortium) the participants are required to...”
Den juridiske form, som den sammenslutning af økonomiske aktører, der skal have kontrakten, skal have
No special legal form is required.
If the agreements are awarded to a group of economic operators (e.g. a consortium) the participants are required to undertake joint and several liabilities and to appoint one economic operator to represent the group.
Vis mere Betingelser i forbindelse med kontrakten
Betingelser for opfyldelse af kontrakten: The information is stated in the tender documents.
Procedure Type af procedure
Forhandlet procedure med forudgående indkaldelse af konkurrencer
Oplysninger om reduktion af antallet af løsninger eller tilbud under forhandling eller dialog
Anvendelse af en trinvis procedure for gradvist at reducere antallet af løsninger, der skal drøftes, eller af tilbud, der skal forhandles
Administrative oplysninger
Frist for modtagelse af bud eller ansøgninger om deltagelse: 2021-02-22
12:00 📅
Sprog, på hvilke bud eller ansøgninger om deltagelse kan indgives: engelsk 🗣️
Nedenstående tidsramme er udtrykt i antal måneder.
Minimumsfrist, inden for hvilken tilbudsgiveren skal opretholde tilbuddet: 6
Supplerende oplysninger Oplysninger om elektroniske arbejdsgange
Elektronisk fakturering vil blive accepteret
Der vil blive anvendt elektronisk betaling
Yderligere oplysninger
“The applicant must submit a completed ESPD to apply for pre-qualification for this tender procedure. The ESPD for this tender can be found via EU-supply....”
The applicant must submit a completed ESPD to apply for pre-qualification for this tender procedure. The ESPD for this tender can be found via EU-supply. The ESPD must be completed in EU-Supply and submitted via ‘My Response’.
Please note:
— An applicant participating on its own, but relying on the capacities of one or more other entities (e.g. a parent or sister company or a subcontractor), must ensure that the application includes the applicants own ESPD together with a separate ESPD from each of the entities it relies on with a completed part II: ‘Information concerning the economic operator’ and part III: ‘Exclusion grounds’ of the ESPD as well as the relevant information regarding part IV: ‘Selection criteria’ and part V: ‘Reduction of the number of qualified candidates’. The ESPD from each of the entities should be duly filled and signed by the entities concerned.
Further where an applicant wants to rely on the capacities of other entities, it shall prove to the contracting authority that it will have at its disposal the resources necessary, for example, by producing a commitment by those entities to that effect, which must be submitted as part of the final documentation.
— Where groups of economic operators, including temporary associations, participate together in the procurement procedure, a complete separate ESPD for each of the participating economic operators must be submitted.
Further the final documentation must include a signed declaration by all parties of the group of economic operators (joint venture, consortium or other) stating that all economic operators as-sume joint and several liabilities towards the contracting authority for the performance of the contract as a whole.
Vis mere Gennemgå organ
Navn: Klagenævntet for Udbud
Postadresse: Nævnenes Hus, Toldboden 2
Postby: Viborg
Postnummer: 8800
Land: Danmark 🇩🇰
Telefon: +45 72405708📞
E-mail: klfu@naevneneshus.dk📧
URL: https://naevneneshus.dk/start-din-klage/klagenaevnet-for-udbud/🌏 Gennemgangsprocedure
Præcise oplysninger om fristerne for gennemgangsprocedurer:
“Complaints regarding a candidate not being pre-qualified must be filed with The Complaints Board for Public Procurement within 20 calendar days starting the...”
Præcise oplysninger om fristerne for gennemgangsprocedurer
Complaints regarding a candidate not being pre-qualified must be filed with The Complaints Board for Public Procurement within 20 calendar days starting the day after the contracting authority has sent notification to the candidates involved, provided that the notification includes a short account of the relevant reasons for the decision.
Other complaints must be filed with The Complaints Board for Public Procurement within:
1) 45 calendar days after the contracting authority has published a contract award notice in the Official Journal of the European Union (with effect from the day following the publication date);
2) 30 calendar days starting the day after the contracting authority has informed the tenderers in question, that the contracting authority has entered into a contract based on a framework agreement through reopening of competition or a Dynamic Purchasing System, provided that the notification includes a short account of the relevant reasons for the decision;
3) 6 months starting the day after the contracting authority has sent notification to the candidates/tenderers involved that the contracting authority has entered into the framework agreement, provided that the notification included a short account of the relevant reasons for the decision.
Vis mere Tjeneste, hvorfra der kan indhentes oplysninger om klageproceduren
Navn: Konkurrence- og Forbrugerstyrelsen
Postadresse: Carl Jacobsen Vej 35
Postby: Valby
Postnummer: 2500
Land: Danmark 🇩🇰
Telefon: +45 41715000📞
E-mail: kfst@kfst.dk📧
URL: http://www.kfst.dk🌏
Kilde: OJS 2021/S 028-070400 (2021-02-05)
Bekendtgørelse om indgåede kontrakter (2021-03-01) Objekt Omfanget af udbuddet
Kort beskrivelse:
“The Commissioning Manager will – in collaboration with Project Management for Everdrup compressor station – be responsible for ensuring that the overall...”
Kort beskrivelse
The Commissioning Manager will – in collaboration with Project Management for Everdrup compressor station – be responsible for ensuring that the overall requirements of the project are implemented and complied with during the execution of the work. The Commissioning Manager is responsible for ensuring compliance with the Baltic Pipe project’s overall commissioning strategy and associated schedule in the ‘Everdrup compressor station’ project. Organisationally, the Commissioning Manager will be reporting to the Project Management of the Everdrup compressor station project.
Vis mere Beskrivelse
Beskrivelse af udbuddet:
“The Baltic Pipe Project is a major gas infrastructure project that aims at creating a new supply corridor for gas in the European gas market; for the first...”
Beskrivelse af udbuddet
The Baltic Pipe Project is a major gas infrastructure project that aims at creating a new supply corridor for gas in the European gas market; for the first time, it will enable shippers to flow gas directly from Norway to the markets in Denmark, Sweden and Poland together with their neighbouring markets. Moreover, it will also enable shippers to flow gas bidirectional from Poland to the Danish and Swedish markets.
The Baltic Pipe project will facilitate transport of Norwegian gas to Poland via Denmark. The total project includes the following main components:
• connection between the Norwegian grid (Europipe II) and the Danish grid,
• Expansion of the gas transmission grid onshore Denmark,
• new compressor station in eastern Zealand at Everdrup,
• new offshore pipeline between Denmark and Poland,
• expansion of the Polish onshore grid.
The connection between the Norwegian grid and Denmark includes a Pipeline end manifold (PLEM) at the connection point to Europipe II, an offshore pipeline in the North Sea, a receiving terminal at Nybro and onshore pipeline from landfall at the Danish west coast to the terminal.
The contracting authority wants to purchase consultancy services in form of a Commissioning Manager to the Baltic Pipe project. The geographical location for the purchased services is at the Compressor Station Everdrup, Zealand, Denmark.
The tender is concerning a Commissioning Manager.
The Commissioning Manager will – in collaboration with Project Management for Everdrup compressor station – be responsible for ensuring that the overall requirements of the project are implemented and complied with during the execution of the work. The Commissioning Manager is responsible for ensuring compliance with the Baltic Pipe project’s overall commissioning strategy and associated schedule in the ‘Everdrup compressor station’ project. Organisationally, the Commissioning Manager will be reporting to the Project Management of the Everdrup compressor station project.
For further details we refer to 18/02255-77
Vis mere
Yderligere oplysninger:
“That this is a negotiated procedure. With the exception of mandatory parts, the Tender Documents, and requirements set out herein, may be changed as part of...”
Yderligere oplysninger
That this is a negotiated procedure. With the exception of mandatory parts, the Tender Documents, and requirements set out herein, may be changed as part of the negotiation process. As a result, the contracting authority encourages all economic operators to submit questions concerning the Tender Documents and apply for pre-qualification even if a requirement may present a challenge initially.
Procedure Administrative oplysninger
Tidligere offentliggørelse vedrørende denne procedure: 2021/S 028-070400
Tildeling af kontrakt
1️⃣
Kontraktnummer: 1
Titel:
“Commissioning Manager for the Baltic Pipe Project at the Compressor Station Everdrup” Oplysninger om ikke-tilskudsgivende
Andre årsager (afbrydelse af proceduren)
Supplerende oplysninger Yderligere oplysninger
“Contract authority has decided to cancel the tender RFT 261667 — 21/01088 — Commissioning Manager for the Baltic Pipe Project at the compressor station...”
Contract authority has decided to cancel the tender RFT 261667 — 21/01088 — Commissioning Manager for the Baltic Pipe Project at the compressor station Everdrup due changes in the scope of work for Commissioning Manager. As consequence the contract authority will have to modify the specifications for Commission Manager for the Baltic Pipe Project.
The contracting authority intends to re-tender the Commissioning Manager as soon as possible.
Vis mere Gennemgangsprocedure
Præcise oplysninger om fristerne for gennemgangsprocedurer:
“Complaints regarding a candidate not being pre-qualified must be filed with The Complaints Board for Public Procurement within 20 calendar days starting the...”
Præcise oplysninger om fristerne for gennemgangsprocedurer
Complaints regarding a candidate not being pre-qualified must be filed with The Complaints Board for Public Procurement within 20 calendar days starting the day after the contracting authority has sent notification to the candidates involved, provided that the notification includes a short account of the relevant reasons for the decision.
Other complaints must be filed with The Complaints Board for Public Procurement within:
1) 45 calendar days after the contracting authority has published a contract award notice in the Official Journal of the European Union (with effect from the day following the publication date);
2) 30 calendar days starting the day after the contracting authority has informed the tenderers in question, that the contracting authority has entered into a contract based on a framework agreement through reopening of competition or a dynamic purchasing system, provided that the notification includes a short account of the relevant reasons for the decision;
3) 6 months starting the day after the contracting authority has sent notification to the candidates/tenderers involved that the contracting authority has entered into the framework agreement, provided that the notification included a short account of the relevant reasons for the decision.
Vis mere
Kilde: OJS 2021/S 045-113964 (2021-03-01)