This procurement by DTU Energy is conducted as a negotiated procedure and concerns the realization of a Vacuum Transfer Line System (VTLs) and Pulsed Laser Deposition chamber (PLDc).
The procurement concerns a reliable and fast ultra-high vacuum transfer connecting minimum 5 vacuum systems (XPS, 3 existing PLDs and 1 sputtering).
The holders/manipulators of the PLD chambers are different from each other and also the XPS has its own holder. DTU Energy has a need to design manipulators and sample holders that can fit in the chambers and in the XPS at the same time.
Deadline
Fristen for modtagelse af bud var på 2020-03-12.
Indkøbet blev offentliggjort på 2020-02-10.
Leverandører
Følgende leverandører er nævnt i tildelingsbeslutninger eller andre indkøbsdokumenter:
Objekt Omfanget af udbuddet
Titel: Vacuum Transfer Line and Pulsed Laser Deposition chamber
Produkter/tjenester: Apparatur til kontrol og prøvning📦
Kort beskrivelse:
“This procurement by DTU Energy is conducted as a negotiated procedure and concerns the realization of a Vacuum Transfer Line System (VTLs) and Pulsed Laser...”
Kort beskrivelse
This procurement by DTU Energy is conducted as a negotiated procedure and concerns the realization of a Vacuum Transfer Line System (VTLs) and Pulsed Laser Deposition chamber (PLDc).
The procurement concerns a reliable and fast ultra-high vacuum transfer connecting minimum 5 vacuum systems (XPS, 3 existing PLDs and 1 sputtering).
The holders/manipulators of the PLD chambers are different from each other and also the XPS has its own holder. DTU Energy has a need to design manipulators and sample holders that can fit in the chambers and in the XPS at the same time.
This procurement by DTU Energy is conducted as a negotiated procedure and concerns the realization of a Vacuum Transfer Line System (VTLs) and Pulsed Laser Deposition chamber (PLDc).
The procurement concerns a reliable and fast ultra-high vacuum transfer connecting minimum 5 vacuum systems (XPS, 3 existing PLDs and 1 sputtering).
The holders/manipulators of the PLD chambers are different from each other and also the XPS has its own holder. DTU Energy has a need to design manipulators and sample holders that can fit in the chambers and in the XPS at the same time.
Vis mere Kriterier for tildeling
Kvalitetskriterium (navn): Functionality and quality
Kvalitetskriterium (vægtning): 60 %
Pris (justeringskoefficient): 40 %
Kontraktens, rammeaftalens eller det dynamiske indkøbssystems varighed
Nedenstående tidsramme er udtrykt i antal måneder.
Beskrivelse
Varighed: 6
Oplysninger om begrænsningerne i antallet af ansøgere, der kan indbydes
Påtænkt antal ansøgere: 3
Objektive kriterier for udvælgelse af det begrænsede antal ansøgere:
“Selection will be based on the presented references. Best references are considered the ones most comparable to this procurement and the overall...”
Objektive kriterier for udvælgelse af det begrænsede antal ansøgere
Selection will be based on the presented references. Best references are considered the ones most comparable to this procurement and the overall requirements herein, including:
— size of vacuum transfer lines,
— connected vacuum systems,
— characteristics of PLD,
— innovative solutions and user friendliness.
Vis mere Oplysninger om valgmuligheder
Indstillinger ✅
Beskrivelse af mulighederne:
“Option: additional load lock chamber with multi samples storage attached to VTLs.”
Juridiske, økonomiske, finansielle og tekniske oplysninger Økonomisk og finansiel stilling
Liste og kortfattet beskrivelse af udvælgelseskriterier:
“The candidates must state the following:
— general yearly turnover for the last 3 audited financial years.” Betingelser for deltagelse
“The minimum level for suitability is 800 000 EUR calculated as an average of the turnover in the last 3 financial years.” Teknisk og faglig kompetence
Liste og kortfattet beskrivelse af udvælgelseskriterier:
“The candidates must give references for comparable contracts. Comparability are considered contracts concerning vacuum transfer lines like the one in the...”
Liste og kortfattet beskrivelse af udvælgelseskriterier
The candidates must give references for comparable contracts. Comparability are considered contracts concerning vacuum transfer lines like the one in the procurement, with regards to the overall specifications of the VTL and PLD.
Vis mere Betingelser for deltagelse
Betingelser for deltagelse (tekniske og faglige kvalifikationer):
“The minimum level for suitability is 3 references and references cannot be more than 3 year olds.”
Procedure Type af procedure
Konkurrencepræget procedure med forhandling
Oplysninger om forhandling
Den ordregivende myndighed forbeholder sig ret til at tildele kontrakten på grundlag af de første tilbud uden at føre forhandlinger
Administrative oplysninger
Frist for modtagelse af bud eller ansøgninger om deltagelse: 2020-03-12
08:00 📅
Sprog, på hvilke bud eller ansøgninger om deltagelse kan indgives: engelsk 🗣️
Nedenstående tidsramme er udtrykt i antal måneder.
Minimumsfrist, inden for hvilken tilbudsgiveren skal opretholde tilbuddet: 6
Supplerende oplysninger Oplysninger om elektroniske arbejdsgange
Der vil blive anvendt elektronisk bestilling
Elektronisk fakturering vil blive accepteret
Der vil blive anvendt elektronisk betaling
Gennemgå organ
Navn: Klagenævnet for Udbud
Postadresse: Nævnenes hus, Toldboden 2
Postby: Viborg
Postnummer: 8800
Land: Danmark 🇩🇰
Telefon: +45 35291000📞
E-mail: klfu@erst.dk📧
URL: http://www.klfu.dk🌏 Gennemgangsprocedure
Præcise oplysninger om fristerne for gennemgangsprocedurer:
“Complaint regarding the award of contract:
Complaint regarding a decision on pre-qualification must be submitted no later than 20 calendar days, from the...”
Præcise oplysninger om fristerne for gennemgangsprocedurer
Complaint regarding the award of contract:
Complaint regarding a decision on pre-qualification must be submitted no later than 20 calendar days, from the date after a notification to the concerned candidates informing them of who has been selected, has been sent and this notification includes the grounds for the decision, cf. law regarding, Complaints board (in Danish Klagenævnet for Udbud) § 7, Section 1.
Complaint regarding the award of contract must be submitted no later than 45 calendar days from the date after the contracting authority has published a contract award notice in the European Union Official Journal informing that the contracting authority has awarded the contract, cf. Law regarding Complaints board (in Danish Klagenævnet for Udbud) § 7, Section 2, subsection 1.
Complaint regarding the award of a contract under a framework agreement with a reopening of the competition:
Complaint regarding the award of a contract under a framework agreement with a reopening of the competition, shall be submitted no later than 30 calendar days form the date after the Contracting authority has notified the concerned tenderers that a contract has been awarded, if the notification includes the grounds for the decision, cf. Law regarding Complaints board (in Danish Klagenævnet for Udbud) § 7, Section 2, subsection 2.
Complaint regarding the award of a framework agreement:
Complaint regarding the award of a framework agreement must be submitted no later than 6 months from the date after the contracting authority have notified the concerned candidates and tenderers that award of contract has happened, cf. Law regarding the Complaints board (in Danish Klagenævnet for Udbud) § 7, Section 2, subsection 3.
Complaint regarding direct award of contract:
Complaint regarding the contracting authority’s award of contract without prior publication of a contract notice in the European Union Official Journal must be submitted no later than 30 calendar days from the date after a contract award notice has been published by the contracting authority in the European Union Official Journal and that contract award notice includes the grounds for the decision to award the contract directly, cf. Law regarding Complaints board (in Danish Klagenævnet for Udbud) § 7, Section 3.
Complaint regarding public procurement below the EU threshold:
Complaint regarding public procurement below the EU threshold must be submitted no later than 45 calendar days from the date after the contracting authority has notified the tenderers about the award of contract if this notification includes the grounds for the decision; and no later than 6 months after the date where the contracting authority has notified the candidates and tenderers about that award of a framework agreement, if the notification includes the grounds for the decision, cf. Law regarding Complaints board (in Danish Klagenævnet for Udbud) § 7, Section 4, subsections 1 and 2. Compliant regarding a decision on pre-qualification on procurement below the EU threshold must be submitted no later than 20 calendar days from the date after the contracting authority has sent a notification to the concerned Candidates regarding who has been selected and this notification includes the grounds for the decision, cf. Law regarding Complaints board (in Danish Klagenævnet for Udbud) § 7, Section 5.
Vis mere Tjeneste, hvorfra der kan indhentes oplysninger om klageproceduren
Navn: Konkurrence- og Forbrugerstyrelsen
Postadresse: Carl Jacobsens Vej 35
Postby: Valby
Postnummer: 2500
Land: Danmark 🇩🇰
Telefon: +45 41715000📞
E-mail: kfst@kfst.dk📧
URL: http://www.kfst.dk🌏
Kilde: OJS 2020/S 031-071976 (2020-02-10)
Supplerende oplysninger (2020-03-12) Objekt Omfanget af udbuddet
Titel: Vacuum Transfer Line and Pulsed Laser Deposition Chamber
Supplerende oplysninger Oprindelig reference til meddelelsen
Meddelelsesnummer i EUT S: 2020/S 031-071976
Ændringer Tekst, der skal berigtiges i den oprindelige meddelelse
Afsnittets nummer: IV.2.2)
Sted for den tekst, der skal ændres: Time limit for receipt of tenders or requests to participate
Gammel værdi
Dato: 2020-03-12 📅
Tid: 08:00
Ny værdi
Dato: 2020-03-30 📅
Tid: 08:00
Andre supplerende oplysninger
“Please be informed that the deadlines for this tender have been extended.
New deadline for submitting application is changed to 30 March 2020.”
Kilde: OJS 2020/S 054-128420 (2020-03-12)
Bekendtgørelse om indgåede kontrakter (2020-11-16) Objekt Omfanget af udbuddet
Samlet værdi af indkøbsaftalen (ekskl. moms): DKK 3 000 000 💰
Beskrivelse
Hovedsted eller sted for udførelsen: DTU, Kongens Lyngby.
Kriterier for tildeling
Kvalitetskriterium (navn): Functionality and Quality
Oplysninger om valgmuligheder
Beskrivelse af mulighederne:
“Option: Additional load lock chamber with multi samples storage attached to VTLs.”
Procedure Administrative oplysninger
Tidligere offentliggørelse vedrørende denne procedure: 2020/S 031-071976
Tildeling af kontrakt
1️⃣
Kontraktnummer: 1
Titel: Vacuum Transfer Line and Pulsed Laser Deposition Chamber
Dato for indgåelse af kontrakten: 2020-11-03 📅
Oplysninger om udbud
Antal modtagne bud: 2
Antal bud, der er modtaget ad elektronisk vej: 2
Navn og adresse på kontrahenten
Navn: Twente Solid State Technology B.V.
Nationalt registreringsnummer: NL807285420B01
Postadresse: Institutenweg 25, PO box 256
Postby: Enschede
Postnummer: 7500AG
Land: Nederlandene 🇳🇱
E-mail: groenen@tsst.nl📧
Region: Nederland 🏙️
Entreprenøren er en SMV ✅ Oplysninger om kontraktens/parcellens værdi (ekskl. moms)
Kontraktens/parcellens samlede værdi: DKK 3 000 000 💰
Supplerende oplysninger Gennemgangsprocedure
Præcise oplysninger om fristerne for gennemgangsprocedurer:
“Complaint regarding a decision on prequalification:
Complaint regarding a decision on prequalification must be submitted no later than 20 calendar days,...”
Præcise oplysninger om fristerne for gennemgangsprocedurer
Complaint regarding a decision on prequalification:
Complaint regarding a decision on prequalification must be submitted no later than 20 calendar days, from the date after a notification to the concerned Candidates informing them of who has been selected, has been sent and this notification includes the grounds for the decision, cf. law regarding, Complaints board (in Danish Klagenævnet for Udbud) § 7, section 1.
Complaint regarding the award of contract:
Complaint regarding the award of contract must be submitted no later than 45 calendar days from the date after the contracting authority has published a contract award notice in the European Union Official Journal informing that the contracting authority has awarded the contract, cf. Law regarding Complaints board (in Danish Klagenævnet for Udbud) § 7, section 2, subsection 1.
Vis mere
Kilde: OJS 2020/S 227-557238 (2020-11-16)