I/S REFA (hereinafter ‘REFA’) operates a waste-to-energy combined heat and power plant in Nykøbing Falster, Denmark. Due to the condition of the existing turbine, showing heavy erosion-corrosion damage in its low-pressure parts, as well as reaching the end of its service life, REFA has decided to remove the existing and procure a new steam turbine. The tender concerns a turnkey project including design, manufacturing, delivery, erection, commissioning, testing and 1 overhaul of a retrofit turbine.
Deadline
Fristen for modtagelse af bud var på 2019-10-14.
Indkøbet blev offentliggjort på 2019-09-12.
Leverandører
Følgende leverandører er nævnt i tildelingsbeslutninger eller andre indkøbsdokumenter:
Objekt Omfanget af udbuddet
Titel:
“Tender for Design, Delivery, erection and Commissioning of a Retrofit Steam Turbine”
Produkter/tjenester: Bygge- og anlægsarbejder📦
Kort beskrivelse:
“I/S REFA (hereinafter ‘REFA’) operates a waste-to-energy combined heat and power plant in Nykøbing Falster, Denmark. Due to the condition of the existing...”
Kort beskrivelse
I/S REFA (hereinafter ‘REFA’) operates a waste-to-energy combined heat and power plant in Nykøbing Falster, Denmark. Due to the condition of the existing turbine, showing heavy erosion-corrosion damage in its low-pressure parts, as well as reaching the end of its service life, REFA has decided to remove the existing and procure a new steam turbine. The tender concerns a turnkey project including design, manufacturing, delivery, erection, commissioning, testing and 1 overhaul of a retrofit turbine.
Vis mere
Anslået værdi uden moms: DKK 30 000 000 💰
1️⃣
Sted for udførelsen: Vest- og Sydsjælland🏙️
Hovedsted eller sted for udførelsen: Nykøbing Falster, DENMARK.
Beskrivelse af udbuddet:
“Design, manufacturing, delivery, erection, commissioning, testing and 1 overhaul of a complete retrofit extraction condensing steam turbine including all...”
Beskrivelse af udbuddet
Design, manufacturing, delivery, erection, commissioning, testing and 1 overhaul of a complete retrofit extraction condensing steam turbine including all necessary instrumentation and control to be installed on the existing spring supported main steel frame and integrated into the existing plant. The retrofit turbine is expected to be ready for hand-over in July/August 2021.
The delivery includes all piping modification works, inclusive calculation, materials, welding, NDE and pipe support for integration into the existing plant. The turbine will be operated from the central control room and the delivery includes the control and protection system integration into the existing DCS and vibration monitoring system.
The delivery includes dismantling of the existing turbine. Civil work for dismantling of the existing turbine or erection of the retrofit turbine is not included.
The turbine will receive steam from a waste incineration boiler at approx. 48 bara and 410 C. The casing must have 2 extractions, the first supplying the deaerator and the second supplying the high-pressure district heat condenser, heating district heating water between 78 C to 89 C. The high-pressure district heat condenser also serves as condenser during plant start-up or during turbine by-pass operation. The steam is exhausted into the low-pressure district heat condenser, receiving district heating water with temperatures varying between 40 C to 60 C. The turbine load range is between approx. 1 MW to full load. At low load operation the boiler can be operated at maximum load, where surplus steam is sent to the high-pressure district heat condenser via the existing turbine bypass. The turbine allows a load change from minimum load to full load within 15 minutes.
The retrofit turbine allows to reuse as much of the existing equipment as possible, in particular, gearbox, generator, district heat condensers and deaerator. Re-use of the existing turbine auxiliary equipment, were useful, is possible, but subject to the same requirements, obligations and guarantees as for a new installation.
The defects liability period for the equipment within the scope of supply is 2 years. During the liability period any fault or defect of the delivered equipment is mended by the applicant.
The turbine is to be designed in accordance with today’s highest technical standards and quality applied to equivalent systems, for a service life of more than 20 years, operating on a very high load for more than 8 000 hours yearly, with an availability of more than 97,5 %. The turbine design should be simple and robust, using adequate material qualities to cope with erosion and corrosion within its wet sections.
Vis mere Kriterier for tildeling
Kvalitetskriterium (navn): Quality
Kvalitetskriterium (vægtning): 40 %
Pris (justeringskoefficient): 60 %
Omfanget af udbuddet
Anslået samlet værdi ekskl. moms: DKK 30 000 000 💰
Kontraktens, rammeaftalens eller det dynamiske indkøbssystems varighed
Nedenstående tidsramme er udtrykt i antal måneder.
Beskrivelse
Varighed: 18
Kontraktens, rammeaftalens eller det dynamiske indkøbssystems varighed
Denne kontrakt kan forlænges ✅ Beskrivelse
Beskrivelse af fornyelser:
“The tender includes an option for a 5 year maintenance agreement and an option for the extension of the maintenance agreement for a period of subsequent 5 years.”
Beskrivelse af fornyelser
The tender includes an option for a 5 year maintenance agreement and an option for the extension of the maintenance agreement for a period of subsequent 5 years.
Vis mere Oplysninger om begrænsningerne i antallet af ansøgere, der kan indbydes
Påtænkt antal ansøgere: 3
Objektive kriterier for udvælgelse af det begrænsede antal ansøgere:
“The limitation of applicants will be based on an evaluation of which applicant has documented the most relevant previous references in comparison to the...”
Objektive kriterier for udvælgelse af det begrænsede antal ansøgere
The limitation of applicants will be based on an evaluation of which applicant has documented the most relevant previous references in comparison to the purchase described in II.2.4). The evaluation of relevant previous deliveries is based on projects concerning the delivery of extraction condensing steam turbines of a size between 5 to 15 MW and retrofit projects including similar deliveries as described in Section II.2.4) will be weighted more positively than other projects. REFA will focus on the 2 best references of each applicant in regard to this selection but look at the quality and amount of the remaining references in case the 2 best references of more applicants are equally good based on the above.
Please note that any ambiguities and/or incomprehensibilities in the information submitted under Section III.1.3) may be regarded negatively in the evaluation when selecting the limited number of applicants.
Vis mere Oplysninger om valgmuligheder
Indstillinger ✅
Beskrivelse af mulighederne:
“The tender includes an option for a 5-year maintenance agreement from the date of hand-over and an option to extend the maintenance agreement with another 5 years.”
Beskrivelse af mulighederne
The tender includes an option for a 5-year maintenance agreement from the date of hand-over and an option to extend the maintenance agreement with another 5 years.
Vis mere Beskrivelse
Yderligere oplysninger:
“REFA has decided not to divide the contract into lots as this is expected to unduly increase the cost as well as the risk regarding the integration of the...”
Yderligere oplysninger
REFA has decided not to divide the contract into lots as this is expected to unduly increase the cost as well as the risk regarding the integration of the different deliveries under the contract.
Juridiske, økonomiske, finansielle og tekniske oplysninger Økonomisk og finansiel stilling
Liste og kortfattet beskrivelse af udvælgelseskriterier:
“1) The applicant must submit information on the applicant’s annual turnover for the last 3 financial years. The information shall be stated in the European...”
Liste og kortfattet beskrivelse af udvælgelseskriterier
1) The applicant must submit information on the applicant’s annual turnover for the last 3 financial years. The information shall be stated in the European Single Procurement Document (ESPD), Part IV.B ‘General yearly turnover’, cf. Section VI.3) below;
2) The applicant shall provide information on the company’s equity for the last 3 financial years. The information shall be stated in the European Single Procurement Document, Part IV.B ‘Financial key figures’, cf. Section VI.3) below. In the event REFA requires documentation for the above the applicant must provide the 3 latest audited annual financial reports. If these are not in English or Scandinavian, the applicant is asked to also provide a resume in English. Reference is made to Section VI.3) with regard to the applicant's possibility of relying on the capacity of other entities.
“1) The applicant must have achieved an annual turnover of at least 50 000 000 DKK. in each of the preceding 3 financial years. If the turnover is not stated...”
1) The applicant must have achieved an annual turnover of at least 50 000 000 DKK. in each of the preceding 3 financial years. If the turnover is not stated in said currency, REFA will calculate the turnover based on the official exchange rate on the date this notice was published;
2) The applicant must have achieved a positive equity in each of the preceding 3 financial years. In the event that the applicant’s equity in any of the last 3 years is below zero, the applicant will be excluded.
Vis mere Teknisk og faglig kompetence
Liste og kortfattet beskrivelse af udvælgelseskriterier:
“A list of the applicant’s most important former deliveries within the last 10 years from similar projects. The list should preferably include the following...”
Liste og kortfattet beskrivelse af udvælgelseskriterier
A list of the applicant’s most important former deliveries within the last 10 years from similar projects. The list should preferably include the following information on each reference:
— description of each delivery, including work/services delivered by the applicant, including if the delivery was a retrofit project,
— steam turbine type, power output, product designation and product production facility,
— steam pressure, temperature and flow at the inlet, extractions and exhaust,
— information on the contracting client and contact person,
— information on when the project was carried out, incl. start and end date, manufacturing, erection and commissioning time periods,
— information on the estimated contract sum,
— information on the applicant’s role and responsibilities.
The information shall be stated in the European Single Procurement Document (ESPD), Part IV), cf. Section VI.3) below. Reference is made to Section VI.3) with regard to the candidate's possibility of relying on the capacity of other entities.
Vis mere Betingelser for deltagelse
Betingelser for deltagelse (tekniske og faglige kvalifikationer):
“1) The applicant must with a minimum of 1 reference demonstrate experience with the delivery of steam turbines for technical facilities.” Betingelser i forbindelse med kontrakten
Betingelser for opfyldelse af kontrakten:
“The contract is a turn key contract and includes both Factory acceptance test (FAT) and performance test to be concluded before hand over to REFA.”
Procedure Type af procedure
Forhandlet procedure med forudgående indkaldelse af konkurrencer
Administrative oplysninger
Frist for modtagelse af bud eller ansøgninger om deltagelse: 2019-10-14
13:00 📅
Sprog, på hvilke bud eller ansøgninger om deltagelse kan indgives: dansk 🗣️
Sprog, på hvilke bud eller ansøgninger om deltagelse kan indgives: engelsk 🗣️
Nedenstående tidsramme er udtrykt i antal måneder.
Minimumsfrist, inden for hvilken tilbudsgiveren skal opretholde tilbuddet: 3
Supplerende oplysninger Yderligere oplysninger
“Applicants who wishes to participate in this tender process must fill in the ESPD via Ethics. Complete the ESPD with the information specified in the...”
Applicants who wishes to participate in this tender process must fill in the ESPD via Ethics. Complete the ESPD with the information specified in the contract notice, including Part II.A, II.B, II.C, III.A, III.B, III.C, IV.B and IV.C. Note that the applicant must submit several ESPDs, if the applicant forms an association of companies or is based on the capacity of other economic operators. Applicant must in the ESPD state the name, VAT/CVR number, postal address, contact person whether the applicant is a micro-enterprise, small or medium-sized enterprise and whether the applicant participates in the tender procedure with others (ESPD Part II.A). The applicant must provide the information requested in Part III) of the contract notice. The applicant must confirm that the applicant is not covered by the compulsory exclusion grounds in Sections 135 and 136 of the Danish Public Procurement Act (ESPD Part III), paragraphs A, B and C). In addition, the applicant must confirm that the applicant is not covered by the voluntary exclusion grounds in section 137 subsection 1, 2 and 5 of the Danish Public Procurement Act (ESPD Part III, Section C). The requested information forms the basis of the contracting authority's assessment of whether the applicant is suitable for carrying out the deliverables of the tender and which applicants are invited to submit a tender. If the applicant participates in the tendering procedure with others, in particular as part of a group, consortium, joint venture or the like, all affected participants must submit a separate ESPD. All required information under Part III) must be provided for each participant in the consortium. In connection with the suitability assessment, however, it will be the consortium's overall suitability that is assessed. If the required information is not provided by all consortium participants, the offer is not necessarily non-compliant, but it may affect the suitability assessment. In addition, each participant in the individual ESPD must indicate the role of the economic operator in the group, the other economic operators participating in the procedure and where appropriate, the name of the participating group (ESPD Part II.A). If the applicant is unable to meet the requirements of financial and economic and/or technical and professional capacity, the applicant may rely on the financial and economic and/or technical and professional capacity of other entities. In this case, any subcontractors of the applicant must also enclose a separate ESPD with completed Part II), sections A and B and Part III) duly completed by the entities concerned (ESDP Part II), Section C). In connection with the suitability assessment, it will be the total suitability that is assessed, including by combining key figures. The applicant can only submit obe application for pre-qualification. If the same legal entity is part of or otherwise participates in several applications, e.g. submitting its own application, but at the same time being a participant in consortium or the like applying, the applicants must ensure that the participation of the same legal entity does not entail the possibility of mutually influencing the contant of the various tenderers' offers. Application for pre-qualification must be submitted electronically to Ethics, cf.
Section I.3) of the contract notice.
Supplerende oplysninger (2019-09-17) Objekt Omfanget af udbuddet
Titel:
“Tender for Design, Delivery, Erection and Commissioning of a Retrofit Steam Turbine”
Kort beskrivelse:
“I/S REFA (hereinafter ‘REFA’) operates a waste-to-energy combined heat and power plant in Nykøbing Falster, Denmark. Due to the condition of the existing...”
Kort beskrivelse
I/S REFA (hereinafter ‘REFA’) operates a waste-to-energy combined heat and power plant in Nykøbing Falster, Denmark. Due to the condition of the existing turbine, showing heavy erosion-corrosion damage in its low-pressure parts, as well as reaching the end of its service life, REFA has decided to remove the existing and procure a new steam turbine. The tender concerns a turnkey project including design, manufacturing, delivery, erection, commissioning, testing and one overhaul of a retrofit turbine.
Supplerende oplysninger Oprindelig reference til meddelelsen
Meddelelsesnummer i EUT S: 2019/S 179-437187
Ændringer Tekst, der skal berigtiges i den oprindelige meddelelse
Afsnittets nummer: VI.4.2)
Sted for den tekst, der skal ændres: Organ med ansvar for mæglingsprocedurerne
Tomme gamle værdier
Ny værdi
Tekst:
“Pursuant to Section 3 of the Danish Consolidation Act No 593 of 2.6.2016 on the Complaints Board for Public Procurement (available at...”
Tekst
Pursuant to Section 3 of the Danish Consolidation Act No 593 of 2.6.2016 on the Complaints Board for Public Procurement (available at www.retsinformation.dk), the following time limits for filing a complaint apply:
Complaints regarding a candidate not being pre-qualified must be filed with The Complaints Board for Public Procurement within 20 calendar days starting the day after the contracting authority has sent notification to the candidates involved, cf. § 7(1) of the Act on The Complaints Board for Public Procurement, provided that the notification includes a short account of the relevant reasons for the decision.
Other complaints must in accordance with § 7(2) of the Act on The Complaints Board for Public Procurement be filed with The Complaints Board for Public Procurement within:
1) 45 calendar days after the contracting authority has published a contract award notice in the Official Journal of the European Union (with effect from the day following the publication date);
2) 30 calendar days starting the day after the contracting authority has informed the tenderers in question, that the contracting authority has entered into a contract based on a framework agreement through reopening of competition or a dynamic purchasing system, provided that the notification includes a short account of the relevant reasons for the decision;
3) 6 months starting the day after the contracting authority has sent notification to the candidates involved that the contracting authority has entered into the framework agreement, cf. § 2(2) or § 171(4) of the Public Procurement Act, provided that the notification included a short account of the relevant reasons for the decision;
4) 20 calendar days starting the day after the contracting authority has published a notice concerning its decision to uphold the contract, cf. § 185(2) of the Public Procurement Act.
The complainant must inform the contracting authority of the complaint in writing at the latest simultaneously with the lodge of the complaint to The Complaints Board for Public Procurement stating whether the complaint has been lodged in the standstill period, cf. § 6(4) of the Act on The Complaints Board for Public Procurement.If the complaint has not been lodged in the standstill period, the complainant must also state whether it is requested that the appeal is granted delaying effect, cf. § 12(1) of the said Act.
The email of The Complaints Board for Public Procurement is stated in Section VI.4.1).
The Complaints Board for Public Procurement’s own guidance note concerning complaints is available at the internet address stated in Section VI.4.1).
Vis mere
Kilde: OJS 2019/S 181-441757 (2019-09-17)
Bekendtgørelse om indgåede kontrakter (2020-04-01) Ordregivende myndighed Navn og adresser
E-mail: jko@refa.dk📧
Objekt Omfanget af udbuddet
Samlet værdi af indkøbsaftalen (ekskl. moms): DKK 31 278 228 💰
Beskrivelse
Beskrivelse af udbuddet:
“Design, manufacturing, delivery, erection, commissioning, testing and one overhaul of a complete retrofit extraction condensing steam turbine including all...”
Beskrivelse af udbuddet
Design, manufacturing, delivery, erection, commissioning, testing and one overhaul of a complete retrofit extraction condensing steam turbine including all necessary instrumentation and control to be installed on the existing spring supported main steel frame and integrated into the existing plant. The retrofit turbine is expected to be ready for hand-over in July/August 2021.
The delivery includes all piping modification works, inclusive calculation, materials, welding, NDE and pipe support for integration into the existing plant. The turbine will be operated from the central control room and the delivery includes the control and protection system integration into the existing DCS and vibration monitoring system.
The delivery includes dismantling of the existing turbine. Civil work for dismantling of the existing turbine or erection of the retrofit turbine is not included.
The turbine will receive steam from a waste incineration boiler at approx. 48 bara and 410 C. The casing must have two extractions, the first supplying the deaerator and the second supplying the high-pressure district heat condenser, heating district heating water between 78 C to 89 C. The high-pressure district heat condenser also serves as condenser during plant start-up or during turbine by-pass operation. The steam is exhausted into the low-pressure district heat condenser, receiving district heating water with temperatures varying between 40 C to 60 C. The turbine load range is between approx. 1 MW to full load. At low load operation the boiler can be operated at maximum load, where surplus steam is sent to the high-pressure district heat condenser via the existing turbine bypass. The turbine allows a load change from minimum load to full load within 15 minutes.
The retrofit turbine allows to reuse as much of the existing equipment as possible, in particular, gearbox, generator, district heat condensers and deaerator. Reuse of the existing turbine auxiliary equipment, were useful, is possible, but subject to the same requirements, obligations and guarantees as for a new installation.
The defects liability period for the equipment within the scope of supply is 2 years. During the liability period any fault or defect of the delivered equipment is mended by the applicant.
The turbine is to be designed in accordance with today’s highest technical standards and quality applied to equivalent systems, for a service life of more than 20 years, operating on a very high load for more than 8 000 hours yearly, with an availability of more than 97.5 %. The turbine design should be simple and robust, using adequate material qualities to cope with erosion and corrosion within its wet sections.
Vis mere Kriterier for tildeling
Kvalitetskriterium (navn): Qualitative evaluation criteria 40 %
Procedure Administrative oplysninger
Tidligere offentliggørelse vedrørende denne procedure: 2019/S 179-437187
Tildeling af kontrakt
1️⃣
Kontraktnummer: 1
Dato for indgåelse af kontrakten: 2020-03-30 📅
Oplysninger om udbud
Antal modtagne bud: 3
Navn og adresse på kontrahenten
Navn: Siemens Energy A/S
Nationalt registreringsnummer: 40664904
Postadresse: Borupvang 9
Postby: Ballerup
Postnummer: 2750
Land: Danmark 🇩🇰
Region: Hovedstaden🏙️
Entreprenøren er en SMV
Oplysninger om kontraktens/parcellens værdi (ekskl. moms)
Anslået samlet værdi af kontrakten/partiet: DKK 30 000 000 💰
Kontraktens/parcellens samlede værdi: DKK 31 278 228 💰
Supplerende oplysninger Yderligere oplysninger
“The value stated in sections II.1.7) and V.2.4) is an expression of an evaluation technical price.” Gennemgangsprocedure
Præcise oplysninger om fristerne for gennemgangsprocedurer:
“Pursuant to section 3 of the Danish Consolidation Act No 593 of 2 June 2016 on the Complaints Board for Public Procurement (available at...”
Præcise oplysninger om fristerne for gennemgangsprocedurer
Pursuant to section 3 of the Danish Consolidation Act No 593 of 2 June 2016 on the Complaints Board for Public Procurement (available at www.retsinformation.dk), the following time limits for filing a complaint apply:
Complaints regarding a candidate not being pre-qualified must be filed with the Complaints Board for Public Procurement within 20 calendar days starting the day after the contracting authority has sent notification to the candidates involved, cf. § 7(1) of the Act on The Complaints Board for Public Procurement, provided that the notification includes a short account of the relevant reasons for the decision.
Other complaints must in accordance with § 7(2) of the Act on the Complaints Board for Public Procurement be filed with The Complaints Board for Public Procurement within:
1) 45 calendar days after the contracting authority has published a contract award notice in the Official Journal of the European Union (with effect from the day following the publication date);
2) 30 calendar days starting the day after the contracting authority has informed the tenderers in question, that the contracting authority has entered into a contract based on a framework agreement through reopening of competition or a dynamic purchasing system, provided that the notification includes a short account of the relevant reasons for the decision;
3) 6 months starting the day after the contracting authority has sent notification to the candidates involved that the contracting authority has entered into the framework agreement, cf. § 2(2) or § 171(4) of the Public Procurement Act, provided that the notification included a short account of the relevant reasons for the decision;
4) 20 calendar days starting the day after the contracting authority has published a notice concerning its decision to uphold the contract, cf. § 185(2) of the Public Procurement Act.
The complainant must inform the contracting authority of the complaint in writing at the latest simultaneously with the lodge of the complaint to the Complaints Board for Public Procurement stating whether the complaint has been lodged in the standstill period, cf. § 6(4) of the Act on the Complaints Board for Public Procurement.If the complaint has not been lodged in the standstill period, the complainant must also state whether it is requested that the appeal is granted delaying effect, cf. § 12(1) of the said Act.
The email of the Complaints Board for Public Procurement is stated in section VI.4.1).
The Complaints Board for Public Procurement’s own guidance note concerning complaints is available at the internet address stated in section VI.4.1).