EU call for tender for I/S Reno-Nord regarding the major overhaul of the 8 MW AEG Kanis steam turbine in production line 3 (unit 3) at the WtE plant in Aalborg.
Deadline
Fristen for modtagelse af bud var på 2019-12-19.
Indkøbet blev offentliggjort på 2019-11-18.
Objekt Omfanget af udbuddet
Titel: EU Call for Tenders Regarding 2020 Major Overhaul Steam Turbine Line 3
Produkter/tjenester: Turbiner og motorer📦
Kort beskrivelse:
“EU call for tender for I/S Reno-Nord regarding the major overhaul of the 8 MW AEG Kanis steam turbine in production line 3 (unit 3) at the WtE plant in Aalborg.”
Kort beskrivelse
EU call for tender for I/S Reno-Nord regarding the major overhaul of the 8 MW AEG Kanis steam turbine in production line 3 (unit 3) at the WtE plant in Aalborg.
1️⃣
Yderligere produkter/tjenester: Turbineudstyr📦
Yderligere produkter/tjenester: Turbineinstrumenter📦
Yderligere produkter/tjenester: Dele til vanddampturbiner📦
Sted for udførelsen: Nordjylland🏙️
Hovedsted eller sted for udførelsen: Aalborg Øst.
Beskrivelse af udbuddet:
“Recent scenario studies show that production line 3 (of the 8 MV AEG Kanis steam turbine) will be needed to provide district heating for the city of...”
Beskrivelse af udbuddet
Recent scenario studies show that production line 3 (of the 8 MV AEG Kanis steam turbine) will be needed to provide district heating for the city of Aalborg. In order to ensure reliable, safe and efficient operation of the unit a major overhaul of the steam turbine and gear box is needed. The unit is expected to be decommissioned in 2034. As other major overhauls and lifetime extension works are carried out in parallel, the boiler will be out of operation for several weeks, starting 1.6.2020. The boiler is planned to be ready to provide steam for I/S Reno-Nord to fulfill the obligations and meet the heating requirements from the grid operator not later than 1.10.2020. Thus, hot recommissioning of the turbine cannot be performed immediately after mechanical completion. Also, a replacement of the turbine control system will be carried out during the outage, and test and commissioning of the turbine must be coordinated with the test of the turbine safety functions.
For a more thorough description of the works included in this call for tender, please see the technical specification.
For a description of the terms and conditions of contract, please see general conditions, together with the contract form.
Vis mere Kriterier for tildeling
Kvalitetskriterium (navn): Execution of works
Kvalitetskriterium (vægtning): 50 %
Kvalitetskriterium (navn): Qhse
Kvalitetskriterium (vægtning): 15 %
Pris (justeringskoefficient): 35 %
Varighed
Startdato: 2020-04-01 📅
Slutdato: 2020-10-01 📅
Oplysninger om begrænsningerne i antallet af ansøgere, der kan indbydes
Maksimalt antal: 3
Objektive kriterier for udvælgelse af det begrænsede antal ansøgere:
“The selection will be based on the technical and professional ability of the applicant documented as stated in section 2.2.1, Ad. 4 of instruction to...”
Objektive kriterier for udvælgelse af det begrænsede antal ansøgere
The selection will be based on the technical and professional ability of the applicant documented as stated in section 2.2.1, Ad. 4 of instruction to tenderers.
The selection will be based on I/S Reno-Nords assessment of which of the applicants who have (listed in decreasing order of importance):
1) The most relevant, understood by I/S Reno-Nord as references that have the better similarity to scope, turbine and gear box type, and recent references. The higher number of relevant references the better;
2) Good examples of easy access to workshop facilities and field service manpower (own or subcontractors);
3) Convincing description showing that the applicant has access to qualified engineering competences and capacities and supply of spare parts.
Vis mere Oplysninger om valgmuligheder
Indstillinger ✅
Beskrivelse af mulighederne:
“The tender must include optional prices and delivery time according to the price list for the following optional deliveries:
— split line stud bolts for...”
Beskrivelse af mulighederne
The tender must include optional prices and delivery time according to the price list for the following optional deliveries:
— split line stud bolts for turbine outer casing,
— new sealing strips for the rotor,
— new sealing strips for stationary parts,
— new blades and replacement,
— control stage,
— high-speed balancing of turbine rotor,
— turbine bearings,
— gear bearings,
— seats for control valves,
— oil deflector rings for the turbine,
— additional work and extra manning from contractor,
— transport of main components to workshop,
— recommended spare parts or services.
For a more thorough description of the options included in this call for tender, please see the technical specification.
Juridiske, økonomiske, finansielle og tekniske oplysninger Økonomisk og finansiel stilling
Liste og kortfattet beskrivelse af udvælgelseskriterier:
“The applicant must inform the following regarding economic and financial standing (ESPD part IVB):
— solvency ratio, which is defined as equity/(total...”
Liste og kortfattet beskrivelse af udvælgelseskriterier
The applicant must inform the following regarding economic and financial standing (ESPD part IVB):
— solvency ratio, which is defined as equity/(total assets) x 100 %, in the last fiscal year (LFY).
Vis mere Betingelser for deltagelse
A solvency ratio of minimum 10 % in the last fiscal year (LFY).
Teknisk og faglig kompetence
Liste og kortfattet beskrivelse af udvælgelseskriterier:
“The applicant must inform the following regarding technical and professional ability (ESPD part IVC):
1) References:
List of relevant references describing...”
Liste og kortfattet beskrivelse af udvælgelseskriterier
The applicant must inform the following regarding technical and professional ability (ESPD part IVC):
1) References:
List of relevant references describing the applicant's experience with major overhaul works for a AEG Kanis G25 steam turbines or similar 5-15 MW size turbines and Renk-Tacke gears or similar type of gears within the last 5 years.
The references must include the project managing role (overall responsibility during planning and project execution) and supply of all needed manpower and spare parts.
The description of the references must include:
— description of the works including type of steam turbine and type of gears and the applicant's role in the overhaul,
— start and end date of the work,
— name of the client/costumer.
2) Workshop facilities
The applicant must describe the access to workshop facilities and field service manpower (own or subcontractor's).
3) Engineering competences and capacities
The applicant must describe the access to a qualified engineering department in case of fact findings, recommended modifications or reverse engineering of spare parts should require such services.
Vis mere Betingelser for deltagelse
Betingelser for deltagelse (tekniske og faglige kvalifikationer):
“Minimum 2 references on major overhaul works for a AEG Kanis G25 steam turbine or similar 5-15 MW size turbines and Renk-Tacke gear or similar type of gears...”
Betingelser for deltagelse (tekniske og faglige kvalifikationer)
Minimum 2 references on major overhaul works for a AEG Kanis G25 steam turbine or similar 5-15 MW size turbines and Renk-Tacke gear or similar type of gears within the last 5 years. The 2 references must include the project managing role (overall responsibility during planning and project execution) and supply of all needed manpower and spare parts.
Vis mere
Krav om deponering og sikkerhedsstillelse:
“Bank guarantee as security for the contractors performance of its obligations under the contract. See general conditions clause 11.”
Procedure Type af procedure
Forhandlet procedure med forudgående indkaldelse af konkurrencer
Administrative oplysninger
Frist for modtagelse af bud eller ansøgninger om deltagelse: 2019-12-19
08:00 📅
Anslået dato for afsendelse af invitationer til at afgive tilbud eller deltage til udvalgte ansøgere: 2019-12-20 📅
Sprog, på hvilke bud eller ansøgninger om deltagelse kan indgives: dansk 🗣️
Sprog, på hvilke bud eller ansøgninger om deltagelse kan indgives: engelsk 🗣️
Nedenstående tidsramme er udtrykt i antal måneder.
Minimumsfrist, inden for hvilken tilbudsgiveren skal opretholde tilbuddet: 3
Supplerende oplysninger Oplysninger om elektroniske arbejdsgange
Elektronisk fakturering vil blive accepteret
Der vil blive anvendt elektronisk betaling
Yderligere oplysninger
“I/S Reno-Nord expects to conduct the negotiations as a relatively short course as described in instruction to tenderers section 7.
I/S Reno-Nord reserves...”
I/S Reno-Nord expects to conduct the negotiations as a relatively short course as described in instruction to tenderers section 7.
I/S Reno-Nord reserves the right to award the contract based on the ‘Initial Offer’.
The purpose of the negotiations is to clarify and negotiate the ‘Initial Offer’, so they will be optimized compared to the needs and requirements of I/S Reno-Nord. Furthermore, the purpose is to increase the understanding at both parties regarding the character, challenges and conditions of the work.
Expected period of negotiation: Week 8, 2020
Bekendtgørelse om indgåede kontrakter (2020-04-20)
Objekt Omfanget af udbuddet
Produkter/tjenester: Industrimaskiner📦 Beskrivelse
Beskrivelse af udbuddet:
“Recent scenario studies show that production line 3 (of the 8 MV AEG Kanis steam turbine) will be needed to provide district heating for the city of...”
Beskrivelse af udbuddet
Recent scenario studies show that production line 3 (of the 8 MV AEG Kanis steam turbine) will be needed to provide district heating for the city of Aalborg. In order to ensure reliable, safe and efficient operation of the unit a major overhaul of the steam turbine and gear box is needed. The unit is expected to be decommissioned in 2034. As other major overhauls and lifetime extension works are carried out in parallel, the boiler will be out of operation for several weeks, starting 1 June 2020. The boiler is planned to be ready to provide steam for I/S Reno-Nord to fulfill the obligations and meet the heating requirements from the grid operator not later than 1 October 2020. Thus, hot recommissioning of the turbine cannot be performed immediately after mechanical completion. Also, a replacement of the turbine control system will be carried out during the outage, and test and commissioning of the turbine must be coordinated with the test of the turbine safety functions.
For a more thorough description of the Works included in this call for tender, please see the technical specification.
For a description of the terms and conditions of contract, please see General conditions, together with the contract form.
Vis mere Kriterier for tildeling
Kvalitetskriterium (vægtning): 50
Pris (justeringskoefficient): 35
Oplysninger om valgmuligheder
Beskrivelse af mulighederne:
“The tender must include optional prices and delivery time for optional deliveries according to the price list. For a more thorough description of the...”
Beskrivelse af mulighederne
The tender must include optional prices and delivery time for optional deliveries according to the price list. For a more thorough description of the options included in this call for tender, please see the technical specification.
Procedure Administrative oplysninger
Tidligere offentliggørelse vedrørende denne procedure: 2019/S 224-550588
Tildeling af kontrakt
1️⃣
Dato for indgåelse af kontrakten: 2020-04-04 📅
Supplerende oplysninger Yderligere oplysninger
“I/S Reno-Nord expects to conduct the negotiations as a relatively short course as described in instruction to tenderers section 7.
I/S Reno-Nord reserves...”
I/S Reno-Nord expects to conduct the negotiations as a relatively short course as described in instruction to tenderers section 7.
I/S Reno-Nord reserves the right to award the contract based on the ‘Initial Offer’.
The purpose of the negotiations is to clarify and negotiate the ‘Initial Offer’, so they will be optimized compared to the needs and requirements of I/S Reno-Nord. Furthermore, the purpose is to increase the understanding at both parties regarding the character, challenges and conditions of the Work.
Expected period of negotiation: Week 8, 2020