The purpose of the works is to carry out and document offshore geo-technical investigations at the site of Lillebælt Syd nearshore wind farm of 20 to 44 wind turbines of 3.6 MW – 8 MW each. The total installed capacity is up to 160 MW. The foundations can either be monopiles, gravity based foundations or suction buckets (to be determined). The work is part of the initial investigations alongside an environmental impact assessment.
The objective of the works is to verify the ground conditions investigated by the geophysical survey and to establish design parameters for the geo-technical design of the foundations.
The final reporting is in May, 2018.

Deadline
Fristen for modtagelse af bud var på 2018-01-23. Indkøbet blev offentliggjort på 2017-12-22.

Leverandører
Følgende leverandører er nævnt i tildelingsbeslutninger eller andre indkøbsdokumenter:
Hvem?

Hvad?

Hvor?

Indkøbshistorik
Dato Dokument
2017-12-22 Udbudsbekendtgørelse
2018-02-14 Bekendtgørelse om indgåede kontrakter