Foundation Installation

Vattenfall Vindkraft Vesterhav Nord P/S; Vattenfall Vindkraft Vesterhav Syd P/S; Vattenfall Vindkraft Kriegers Flak P/S

Supply of all required work for the foundation installation corresponding to the requirements specified by the contracting entities.
Vattenfall has been awarded the concession for the Danish offshore wind project Vesterhav Nord and Vesterhav Syd, Danish Kriegers Flak, led by the Danish Energy Agency [DEA].
The wind farms will consist out of monopile foundations including transition pieces connected by bolted flange connection, wind turbine generators of equal or more than 8 MW and inter array cable with the following number of locations::
— Vesterhav Nord: up to 25 locations,
— Vesterhav Syd: up to 25 locations,
— Danish Kriegers Flak: up to 75 locations.

Deadline

Fristen for modtagelse af bud var på 2017-10-11. Indkøbet blev offentliggjort på 2017-09-11.

Leverandører

Følgende leverandører er nævnt i tildelingsbeslutninger eller andre indkøbsdokumenter:

Hvem? Hvad? Hvor?
Indkøbshistorik
Dato Dokument
2017-09-11 Udbudsbekendtgørelse
2019-01-15 Bekendtgørelse om indgåede kontrakter
2019-05-20 Bekendtgørelse om indgåede kontrakter
Udbudsbekendtgørelse (2017-09-11)
Objekt
Omfanget af udbuddet
Titel: Arbejder i forbindelse med udførelse af vandbygningsanlæg
Kort beskrivelse:
Supply of all required work for the foundation installation corresponding to the requirements specified by the contracting entities. Vattenfall has been awarded the concession for the Danish offshore wind project Vesterhav Nord and Vesterhav Syd, Danish Kriegers Flak, led by the Danish Energy Agency [DEA]. The wind farms will consist out of monopile foundations including transition pieces connected by bolted flange connection, wind turbine generators of equal or more than 8 MW and inter array cable with the following number of locations:: — Vesterhav Nord: up to 25 locations, — Vesterhav Syd: up to 25 locations, — Danish Kriegers Flak: up to 75 locations.
Vis mere
Bekendtgørelsens metadata
Originalsprog: engelsk 🗣️
Dokumenttype: Udbudsbekendtgørelse
Kontraktens art: Bygge og anlæg
Forordning: Den Europæiske Union
Fælles glossar for offentlige kontrakter (CPV)
Kode: Arbejder i forbindelse med udførelse af vandbygningsanlæg 📦
Yderligere CPV-kode: Arbejder i forbindelse med udførelse af vandbygningsanlæg 📦
Sted for udførelsen
NUTS-region: Danmark 🏙️
Midtjylland 🏙️
Sjælland 🏙️

Procedure
Procedureform: Udbud efter forhandling
Bud-type: Indsendelse gældende for alle delaftaler
Kriterier for tildeling
Det økonomisk mest fordelagtige bud

Ordregivende myndighed
Identitet
Land: Danmark 🇩🇰
Type af ordregivende myndighed: Forsyningsvirksomhed
Navn på ordregivende myndighed: Vattenfall Vindkraft Vesterhav Nord P/S; Vattenfall Vindkraft Vesterhav Syd P/S; Vattenfall Vindkraft Kriegers Flak P/S
Postadresse: Exnersgade 2
Postnummer: 6700
Postby: Esbjerg
Kontakt
Internetadresse: http://www.vattenfall.de 🌏
E-mail: vkf.cii@vattenfall.de 📧
URL til dokumenter: https://portal.commerce-hub.com/ 🌏

Reference
Datoer
Afsendelsesdato: 2017-09-11 📅
Tilbudsfrist: 2017-10-11 📅
Offentliggørelsesdato: 2017-09-14 📅
Startdato: 2019-01-01 📅
Slutdato: 2021-12-31 📅
Identifikatorer
Bekendtgørelsesnummer: 2017/S 176-361014
EUT-S-nummer: 176
Yderligere oplysninger
This procedure will be carried out using an electronic application, Commerce-Hub. Vattenfall will only make available the relevant documents through this website. Candidates need to submit all requested information by using this website. Use the following link to register for this tender procedure: https://portal.commerce-hub.com/index.cfm?action=sourcing:__requestform.subscribe&document=721CA50B-B156-6E47-85502CA55878ECE5
Vis mere

Objekt
Omfanget af udbuddet
Kort beskrivelse:
Supply of all required work for the foundation installation corresponding to the requirements specified by the contracting entities.
Vattenfall has been awarded the concession for the Danish offshore wind project Vesterhav Nord and Vesterhav Syd, Danish Kriegers Flak, led by the Danish Energy Agency [DEA].
The wind farms will consist out of monopile foundations including transition pieces connected by bolted flange connection, wind turbine generators of equal or more than 8 MW and inter array cable with the following number of locations::
— Vesterhav Nord: up to 25 locations,
— Vesterhav Syd: up to 25 locations,
— Danish Kriegers Flak: up to 75 locations.
Delkontraktens titel: Foundation Installation Vesterhav Nord
Delkontraktnummer: 1
Kort beskrivelse:
(Nature and quantity of works, supplies or services or indication of needs and requirements; for supplies only – state whether tenders are requested for purchase, lease, rental, hire purchase or any combination of those.)
Supply of all required work for the foundation installation for Vesterhav Nord with up to 25 locations.
See Commerce Hub Website and Selection Guide for further information on the project description.
Delkontraktens titel: Foundation Installation Vesterhav Syd
Delkontraktnummer: 2
Kort beskrivelse:
Supply of all required work for the foundation installation for Vesterhav Syd with up to 25 locations.
Delkontraktens titel: Foundation Installation Danish Kriegers Flak
Delkontraktnummer: 3
Kort beskrivelse:
(Nature and quantity of works, supplies or services or indication of needs and requirements; for supplies only –state whether tenders are requested for purchase, lease, rental, hire purchase or any combination of those.)
Supply of all required work for the foundation installation for an offshore wind farm of up to 75 locations.
Fælles glossar for offentlige kontrakter (CPV)
Supplerende CPV-kode: IA21
Sted for udførelsen
Hovedsted eller sted for udførelsen:
Danish coastal waters in the North Sea.
Danish Exclusive Economic Zone (EEZ) in the Baltic Sea.

Juridiske, økonomiske, finansielle og tekniske oplysninger
Betingelser for deltagelse
Egnethed til at udøve det erhverv: See Selection Guide, Questionnaire on the Commerce Hub website.
Liste og kortfattet beskrivelse af regler og kriterier: See Selection Guide, Questionnaire on the Commerce Hub website.
Kontraktens udførelse
Krav om deponering og sikkerhedsstillelse:
Details are stated in the procurement documents. See Commerce Hub Website and Selection Guide.
De vigtigste finansieringsbetingelser og betalingsordninger og/eller henvisning til de relevante bestemmelser, der regulerer dem:
Details are stated in the procurement documents. See Commerce Hub Website and Selection Guide.
Den juridiske form, som den sammenslutning af økonomiske aktører, der skal have kontrakten, skal have:
Details are stated in the procurement documents. See Commerce Hub Website and Selection Guide.

Procedure
Tidspunkt for modtagelse af tilbud: 20:00
Sprog, på hvilke bud eller ansøgninger om deltagelse kan indgives: engelsk 🗣️

Ordregivende myndighed
Identitet
Nationalt registreringsnummer: 38275569; 38275550; 38275577
Kontakt
Enhed: Procurement Commitee Wind
Internetadresse: www.vattenfall.de 🌏
URL til dokumenter: https://portal.commerce-hub.com/ 🌏

Reference
Yderligere oplysninger
This procedure will be carried out using an electronic application, Commerce-Hub. Vattenfall will only make available the relevant documents through this website. Candidates need to submit all requested information by using this website. Use the following link to register for this tender procedure:
Vis mere

Supplerende oplysninger
Gennemgå organ
Navn: Klagenævnet for Udbud,
Postadresse: Toldboden 2, Nævnenes Hus
Postby: Viborg
Postnummer: 8800
Land: Danmark 🇩🇰
E-mail: klfu@erst.dk 📧
Internetadresse: https://erhvervsstyrelsen.dk/klagenaevnet-for-udbud 🌏
Tjeneste, hvorfra der kan indhentes oplysninger om klageproceduren
Navn: Competition and Consumer Authority
Postadresse: Carl Jakobsens Vej 35
Postby: Valby
Postnummer: 2500
E-mail: kfst@kfst.dk 📧
Internetadresse: http://www.kfst.dk 🌏
Kilde: OJS 2017/S 176-361014 (2017-09-11)
Bekendtgørelse om indgåede kontrakter (2019-01-15)
Objekt
Omfanget af udbuddet
Kort beskrivelse:
Supply of all required work for the foundation installation corresponding to the requirements specified by the contracting entities. Vattenfall has been awarded the concession for the Danish offshore wind project Vesterhav Nord and VesterhavSyd, Danish Kriegers Flak, led by the Danish Energy Agency [DEA]. The wind farms will consist out of monopile foundations including transition pieces connected by bolted flange connection, wind turbine generators of equal or more than 8 MW and inter array cable with the following numberof locations: — Vesterhav Nord: up to 25 locations, — Vesterhav Syd: up to 25 locations, — Danish Kriegers Flak: up to 75 locations.
Vis mere
Bekendtgørelsens metadata
Dokumenttype: Bekendtgørelse om indgåede kontrakter

Procedure
Bud-type: Finder ikke anvendelse

Ordregivende myndighed
Identitet
Navn på ordregivende myndighed: Vattenfall Vindkraft Kriegers Flak P/S

Reference
Datoer
Afsendelsesdato: 2019-01-15 📅
Offentliggørelsesdato: 2019-01-18 📅
Identifikatorer
Bekendtgørelsesnummer: 2019/S 013-027384
Henviser til bekendtgørelse: 2017/S 176-361014
EUT-S-nummer: 13
Yderligere oplysninger
This procedure will be carried out using an electronic application, Commerce-Hub. Vattenfall will only makeavailable the relevant documents through this website. Candidates need to submit all requested information byusing this website. Use the following link to register for this tender procedure: https://portal.commerce-hub.com/index.cfm?action=sourcing:__requestform.subscribe&document=721CA50B-B156-6E47-85502CA55878ECE5
Vis mere

Objekt
Omfanget af udbuddet
Kort beskrivelse:
Vattenfall has been awarded the concession for the Danish offshore wind project Vesterhav Nord and VesterhavSyd, Danish Kriegers Flak, led by the Danish Energy Agency [DEA].
The wind farms will consist out of monopile foundations including transition pieces connected by bolted flange connection, wind turbine generators of equal or more than 8 MW and inter array cable with the following numberof locations:
For supplies only –state whether tenders are requested for purchase, lease, rental, hire purchase or any combination of those) supply of all required work for the foundation installation for an offshore wind farm of up to 75 locations.
Sted for udførelsen
Hovedsted eller sted for udførelsen: Danish Exclusive Economic Zone (EEZ) in the Baltic Sea

Tildeling af kontrakt
Dato for kontraktindgåelse: 2018-12-20 📅
Navn: Van Oord Offshore Wind bv
Postadresse: Jan Blankenweg 2
Postby: Gorinchem
Postnummer: 4207
Land: Nederlandene 🇳🇱
Oplysninger om udbud
Antal modtagne bud: 7

Ordregivende myndighed
Identitet
Nationalt registreringsnummer: 38275577

Reference
Yderligere oplysninger
This procedure will be carried out using an electronic application, Commerce-Hub. Vattenfall will only makeavailable the relevant documents through this website. Candidates need to submit all requested information byusing this website. Use the following link to register for this tender procedure:
Vis mere
Kilde: OJS 2019/S 013-027384 (2019-01-15)
Bekendtgørelse om indgåede kontrakter (2019-05-20)
Objekt
Omfanget af udbuddet
Kort beskrivelse:
Supply of all required work for the foundation installation corresponding to the requirements specified by the contracting entities. Vattenfall has been awarded the concession for the Danish offshore wind project Vesterhav Nord and VesterhavSyd, Danish Kriegers Flak, led by the Danish Energy Agency [DEA]. The wind farms will consist out of monopile foundations including transition pieces connected by bolted flange connection, wind turbine generators of equal or more than 8 MW and inter array cable with the following number of locations: — Vesterhav Nord: up to 25 locations, — Vesterhav Syd: up to 25 locations, — Danish Kriegers Flak: up to 75 locations.
Vis mere

Procedure
Kriterier for tildeling
Den laveste pris

Reference
Datoer
Afsendelsesdato: 2019-05-20 📅
Offentliggørelsesdato: 2019-05-22 📅
Identifikatorer
Bekendtgørelsesnummer: 2019/S 098-238183
EUT-S-nummer: 98
Yderligere oplysninger
This procedure will be carried out using an electronic application, CommerceHub. Vattenfall will only make available the relevant documents through this website. Candidates need to submit all requested information by using this website. Use the following link to register for this tender procedure: https://portal.commerce-hub.com/index.cfm?action=sourcing:__requestform.subscribe&document=721CA50B-B156-6E47-85502CA55878ECE5
Vis mere

Objekt
Omfanget af udbuddet
Kort beskrivelse:
The wind farms will consist out of monopile foundations including transition pieces connected by bolted flange connection, wind turbine generators of equal or more than 8 MW and inter array cable with the following number of locations:
(nature and quantity of works, supplies or services or indication of needs and requirements; for supplies only –state whether tenders are requested for purchase, lease, rental, hire purchase or any combination of those).
See CommerceHub Website and Selection Guide for further information on the project description.
See CommerceHub Website and selection guide for further information on the project description.

Reference
Yderligere oplysninger
This procedure will be carried out using an electronic application, CommerceHub. Vattenfall will only make available the relevant documents through this website. Candidates need to submit all requested information by using this website. Use the following link to register for this tender procedure: