The Contracting Authority wants to purchase a concept study for a new Compressor Station located at the East coast at Zealand. The Compressor Station is part of the Baltic Pipe project. The Baltic Pipe project is connecting the Norwegian gas transmission system with the Danish transmission system via a subsea pipeline in the North Sea and connecting the Danish transmission system with the Polish transmission systems via a subsea pipeline in the Baltic Sea in order to facilitate the gas supply to Poland. The objective for this concept study is to mature the result from the feasibility study performed in 2016 and to define the Compressor Station in further details and prepare the necessary documentation in order to get a more firm cost estimate, realistic time schedule and a firm basis for the following detailed engineering. Further details can be seen in the tender documents.
Deadline
Fristen for modtagelse af bud var på 2017-07-07.
Indkøbet blev offentliggjort på 2017-06-22.
Leverandører
Følgende leverandører er nævnt i tildelingsbeslutninger eller andre indkøbsdokumenter:
Udbudsbekendtgørelse (2017-06-22) Objekt Omfanget af udbuddet
Titel: Arkitekt-, ingeniør- og planlægningsvirksomhed
Referencenummer: 17/01019
Kort beskrivelse:
The Contracting Authority wants to purchase a concept study for a new Compressor Station located at the East coast at Zealand. The Compressor Station is part of the Baltic Pipe project. The Baltic Pipe project is connecting the Norwegian gas transmission system with the Danish transmission system via a subsea pipeline in the North Sea and connecting the Danish transmission system with the Polish transmission systems via a subsea pipeline in the Baltic Sea in order to facilitate the gas supply to Poland. The objective for this concept study is to mature the result from the feasibility study performed in 2016 and to define the Compressor Station in further details and prepare the necessary documentation in order to get a more firm cost estimate, realistic time schedule and a firm basis for the following detailed engineering. Further details can be seen in the tender documents.
The Contracting Authority wants to purchase a concept study for a new Compressor Station located at the East coast at Zealand. The Compressor Station is part of the Baltic Pipe project. The Baltic Pipe project is connecting the Norwegian gas transmission system with the Danish transmission system via a subsea pipeline in the North Sea and connecting the Danish transmission system with the Polish transmission systems via a subsea pipeline in the Baltic Sea in order to facilitate the gas supply to Poland. The objective for this concept study is to mature the result from the feasibility study performed in 2016 and to define the Compressor Station in further details and prepare the necessary documentation in order to get a more firm cost estimate, realistic time schedule and a firm basis for the following detailed engineering. Further details can be seen in the tender documents.
Procedure
Procedureform: Udbud efter forhandling
Bud-type: Indsendelse gældende for alle delaftaler
Kriterier for tildeling
Det økonomisk mest fordelagtige bud
The applicant must submit a completed European Single Procurement Document (ESPD) to apply for prequalification for this tender procedure. The ESPD for this tender can be found in the prequalification material via EU-supply.
To complete the ESPD, please:
— Save the XML file onto your own computer.
— Open the link https://ec.europa.eu/growth/tools-databases/espd/welcome
— Choose the preferred language.
— Choose ‘I am an economic operator’.
— Choose ‘Import ESPD’.
— Upload the XML file of the ESPD.
— Choose the country of your companies origin.
— Fill out and complete the ESPD with the information required in this contract notice.
— When finished filling out the ESPD, print the version as a pdf and safe it on your computer.
— Upload the pdf version to ‘My response’ in EU-Supply as your/a part of your request for prequalification.
Please note the following:
— An applicant participating on its own, but relying on the capacities of one or more other entities (e.g. a parent or sister company or a subcontractor), must ensure that the application includes the applicants own ESPD together with a separate ESPD from each of the entities it relies on with a completed part II: ‘Information concerning the economic operator’ and part III: ‘Exclusion grounds’ of the ESPD as well as the relevant information regarding part IV: ‘Selection criteria’ and part V: ‘Reduction of the number of qualified candidates’. The ESPD from each of the entities should be duly filled and signed by the entities concerned.
Further Where an applicant wants to rely on the capacities of other entities, it shall prove to the contracting authority that it will have at its disposal the resources necessary, for example, by producing a commitment by those entities to that effect, which must be submitted as part of the final documentation.
— Where groups of economic operators, including temporary associations, participate together in the procurement procedure, a complete separate ESPD for each the participating economic operators must be submitted.
Further the final documentation must include a signed declaration by all parties of the group of economic operators (joint venture, consortium or other) stating that all economic operators assume joint and several liabilities towards the Contracting Authority for the performance of the contract as a whole.
The applicant must submit a completed European Single Procurement Document (ESPD) to apply for prequalification for this tender procedure. The ESPD for this tender can be found in the prequalification material via EU-supply.
— Fill out and complete the ESPD with the information required in this contract notice.
— When finished filling out the ESPD, print the version as a pdf and safe it on your computer.
— Upload the pdf version to ‘My response’ in EU-Supply as your/a part of your request for prequalification.
Please note the following:
— An applicant participating on its own, but relying on the capacities of one or more other entities (e.g. a parent or sister company or a subcontractor), must ensure that the application includes the applicants own ESPD together with a separate ESPD from each of the entities it relies on with a completed part II: ‘Information concerning the economic operator’ and part III: ‘Exclusion grounds’ of the ESPD as well as the relevant information regarding part IV: ‘Selection criteria’ and part V: ‘Reduction of the number of qualified candidates’. The ESPD from each of the entities should be duly filled and signed by the entities concerned.
Further Where an applicant wants to rely on the capacities of other entities, it shall prove to the contracting authority that it will have at its disposal the resources necessary, for example, by producing a commitment by those entities to that effect, which must be submitted as part of the final documentation.
— Where groups of economic operators, including temporary associations, participate together in the procurement procedure, a complete separate ESPD for each the participating economic operators must be submitted.
Further the final documentation must include a signed declaration by all parties of the group of economic operators (joint venture, consortium or other) stating that all economic operators assume joint and several liabilities towards the Contracting Authority for the performance of the contract as a whole.
Objekt Omfanget af udbuddet
Kort beskrivelse:
The Contracting Authority wants to purchase a concept study for a new Compressor Station located at the East coast at Zealand. The Compressor Station is part of the Baltic Pipe project. The Baltic Pipe project is connecting the Norwegian gas transmission system with the Danish transmission system via a subsea pipeline in the North Sea and connecting the Danish transmission system with the Polish transmission systems via a subsea pipeline in the Baltic Sea in order to facilitate the gas supply to Poland. The objective for this concept study is to mature the result from the feasibility study performed in 2016 and to define the Compressor Station in further details and prepare the necessary documentation in order to get a more firm cost estimate, realistic time schedule and a firm basis for the following detailed engineering.
The Contracting Authority wants to purchase a concept study for a new Compressor Station located at the East coast at Zealand. The Compressor Station is part of the Baltic Pipe project. The Baltic Pipe project is connecting the Norwegian gas transmission system with the Danish transmission system via a subsea pipeline in the North Sea and connecting the Danish transmission system with the Polish transmission systems via a subsea pipeline in the Baltic Sea in order to facilitate the gas supply to Poland. The objective for this concept study is to mature the result from the feasibility study performed in 2016 and to define the Compressor Station in further details and prepare the necessary documentation in order to get a more firm cost estimate, realistic time schedule and a firm basis for the following detailed engineering.
Varighed: 5 måneder
Beskrivelse af mulighederne:
Option 1: Alternative location of the compressor station.
Option 2: Alternative power supply.
Navn på EU-finansieret projekt eller program: The Baltic Pipe Project is a European PCI-Project (Project of Common Interest) Reference numbers: TRA-N-271 and TRA-N-780. EU funding has been obtained for the finalized feasibility studies.
Sted for udførelsen
Hovedsted eller sted for udførelsen: Zealand.
Juridiske, økonomiske, finansielle og tekniske oplysninger Betingelser for deltagelse
Økonomisk og finansiel stilling:
The contracting Authority will only enter into contract with economic solid companies. This to ensure that the company continues to exist through the whole contract period.
The applicant must confirm the economic ability in the ESPD part IV.B: ‘Economic and financial standing’ with information from the latest annual report regarding the following economic indicators:
Both economic indicators should be stated in ESPD part IV.B, number 4 (financial ratios).
If the applicant is relying on the capacities of one or more other entities (e.g. a parent or sister company or a subcontractor) the information for the ESPD part IV.B must also be given in a separate ESPD from each of the entities, cf. section VI.3 ‘Additional information’.
If the applicant is relying on the capacities of one or more other entities (e.g. a parent or sister company or a subcontractor) the information for the ESPD part IV.B must also be given in a separate ESPD from each of the entities, cf. section VI.3 ‘Additional information’.
The applicant is obliged to document the requirement by request of the Contracting Authority.
Mindstekrav til niveauet:
— Equity must be at least 5 MDKK.
— Equity ratio must be at least 20 pct.
o If the equity ratio is between 15 pct. and 20 pct. the supplier can qualify, if Equity exceeds 10 MDKK.
Teknisk og faglig kompetence:
The references of the most significant comparable contracts undertaken in the past three years must be stated in the ESPD part IV.C: ‘Technical and professional ability’.
The references must include:
— A detailed description of the work performed for each reference (please note the ‘description’ box can contain more text than is visible. I.e. it is possible to copy paste text into the box)
— Contract value (if possible)
— Date
— Contact information for the entity in question (including contact person)
If the applicant is relying on the capacities of one or more other entities (e.g. a parent or sister company or a subcontractor) the information for the ESPD part IV.C must also be given in a separate ESPD from each of the entities, cf. section VI.3 ‘Additional information’.
If the applicant is relying on the capacities of one or more other entities (e.g. a parent or sister company or a subcontractor) the information for the ESPD part IV.C must also be given in a separate ESPD from each of the entities, cf. section VI.3 ‘Additional information’.
The number of references should not surpass a maximum of the 5 most comparable and relevant references. If the reference list includes more than 5 references, the Contracting authority will only consider the first 5 listed. If the applicant is participating in the procurement procedure together with others in a group of economic operators (e.g. a consortium) or is relying on the capacity of one or more other entities for references the maximum number of references to be submitted must still be respected and cannot exceed 5 when combined.
The number of references should not surpass a maximum of the 5 most comparable and relevant references. If the reference list includes more than 5 references, the Contracting authority will only consider the first 5 listed. If the applicant is participating in the procurement procedure together with others in a group of economic operators (e.g. a consortium) or is relying on the capacity of one or more other entities for references the maximum number of references to be submitted must still be respected and cannot exceed 5 when combined.
In this section, the applicant must provide information about certificates or descriptions of similar QA/QC programs in accordance with section III.1.3) of the Contract Notice:
The applicant must meet the following minimum requirement:
Valid certificate by independent bodies about quality assurance standards or documentation of similar QA/QC programs used by the Applicant.
The contracting authority reserves the right to contact the stated references.
Mindstekrav til niveauet:
— Quality assurance (ESPD part IV.C)
In this section, the applicant must provide information about certificates or descriptions of similar QA/QC programs in accordance with section III.1.3) of the Contract Notice:
The applicant must meet the following minimum requirement:
Valid certificate by independent bodies about quality assurance standards or documentation of similar QA/QC programs used by the Applicant.
Liste og kortfattet beskrivelse af regler og kriterier:
The applicant must submit a completed version of the ESPD. Please see section VI.3 ‘Additional information’ for further information regarding the ESPD. The application must be submitted through EU-Supply, cf. link in section I.1 in this TED announcement. Applications not submitted via EU-supply or received after the deadline will not be accepted.
Liste og kortfattet beskrivelse af regler og kriterier
The applicant must submit a completed version of the ESPD. Please see section VI.3 ‘Additional information’ for further information regarding the ESPD. The application must be submitted through EU-Supply, cf. link in section I.1 in this TED announcement. Applications not submitted via EU-supply or received after the deadline will not be accepted.
The contracting authority reserves the right to obtain supplementary information from the applicant.
Energinet has joined Global Compact and is using the 10 principles as a platform for working with CSR and our Code of Conduct. Contractors are expected to act in accordance with Energinet's Code of Conduct and CSR profile visible at our homepage: www.energinet.dk
Liste og kortfattet beskrivelse af regler og kriterier
Energinet has joined Global Compact and is using the 10 principles as a platform for working with CSR and our Code of Conduct. Contractors are expected to act in accordance with Energinet's Code of Conduct and CSR profile visible at our homepage: www.energinet.dk
Kontraktens udførelse
Krav om deponering og sikkerhedsstillelse: The information is stated in the tender material.
De vigtigste finansieringsbetingelser og betalingsordninger og/eller henvisning til de relevante bestemmelser, der regulerer dem: The information is stated in the tender material.
Den juridiske form, som den sammenslutning af økonomiske aktører, der skal have kontrakten, skal have: The information is stated in the tender material.
Betingelser for opfyldelse af kontrakten: The information is stated in the tender material.
Procedure
Gældende udbudslovgivning: Danish.
Mindste antal ansøgere: 5
Objektive kriterier for udvælgelse af det begrænsede antal ansøgere:
The Contracting Authority will prequalify the 5 applicants who are evaluated as most qualified for the specific tender. Only these applicants will be invited to submit a tender. The selection of the applicants will be based on the submitted references. That is to which extend the reference(s) are similar to the tender assignment. As a result the number of references will not be the determining factor alone, but more importantly to which degree the specific forwarded references are comparable and relevant to the tender assignment regarding solution and scope.
Objektive kriterier for udvælgelse af det begrænsede antal ansøgere
The Contracting Authority will prequalify the 5 applicants who are evaluated as most qualified for the specific tender. Only these applicants will be invited to submit a tender. The selection of the applicants will be based on the submitted references. That is to which extend the reference(s) are similar to the tender assignment. As a result the number of references will not be the determining factor alone, but more importantly to which degree the specific forwarded references are comparable and relevant to the tender assignment regarding solution and scope.
Tidspunkt for modtagelse af tilbud: 12:00
Sprog, på hvilke bud eller ansøgninger om deltagelse kan indgives: engelsk 🗣️
Tilbuddets gyldighedsperiode: 6 måneder
The applicant must submit a completed European Single Procurement Document (ESPD) to apply for prequalification for this tender procedure. The ESPD for this tender can be found in the prequalification material via EU-supply.
— Fill out and complete the ESPD with the information required in this contract notice.
— When finished filling out the ESPD, print the version as a pdf and safe it on your computer.
— Upload the pdf version to ‘My response’ in EU-Supply as your/a part of your request for prequalification.
Please note the following:
— An applicant participating on its own, but relying on the capacities of one or more other entities (e.g. a parent or sister company or a subcontractor), must ensure that the application includes the applicants own ESPD together with a separate ESPD from each of the entities it relies on with a completed part II: ‘Information concerning the economic operator’ and part III: ‘Exclusion grounds’ of the ESPD as well as the relevant information regarding part IV: ‘Selection criteria’ and part V: ‘Reduction of the number of qualified candidates’. The ESPD from each of the entities should be duly filled and signed by the entities concerned.
— An applicant participating on its own, but relying on the capacities of one or more other entities (e.g. a parent or sister company or a subcontractor), must ensure that the application includes the applicants own ESPD together with a separate ESPD from each of the entities it relies on with a completed part II: ‘Information concerning the economic operator’ and part III: ‘Exclusion grounds’ of the ESPD as well as the relevant information regarding part IV: ‘Selection criteria’ and part V: ‘Reduction of the number of qualified candidates’. The ESPD from each of the entities should be duly filled and signed by the entities concerned.
Further Where an applicant wants to rely on the capacities of other entities, it shall prove to the contracting authority that it will have at its disposal the resources necessary, for example, by producing a commitment by those entities to that effect, which must be submitted as part of the final documentation.
Further Where an applicant wants to rely on the capacities of other entities, it shall prove to the contracting authority that it will have at its disposal the resources necessary, for example, by producing a commitment by those entities to that effect, which must be submitted as part of the final documentation.
— Where groups of economic operators, including temporary associations, participate together in the procurement procedure, a complete separate ESPD for each the participating economic operators must be submitted.
Further the final documentation must include a signed declaration by all parties of the group of economic operators (joint venture, consortium or other) stating that all economic operators assume joint and several liabilities towards the Contracting Authority for the performance of the contract as a whole.
Further the final documentation must include a signed declaration by all parties of the group of economic operators (joint venture, consortium or other) stating that all economic operators assume joint and several liabilities towards the Contracting Authority for the performance of the contract as a whole.
Complaints regarding a candidate not being pre-qualified must be filed with The Complaints Board for Public Procurement within 20 calendar days starting the day after the contracting authority has sent notification to the candidates involved, provided that the notification includes a short account of the relevant reasons for the decision.
Complaints regarding a candidate not being pre-qualified must be filed with The Complaints Board for Public Procurement within 20 calendar days starting the day after the contracting authority has sent notification to the candidates involved, provided that the notification includes a short account of the relevant reasons for the decision.
Other complaints must be filed with The Complaints Board for Public Procurement within:
1. 45 calendar days after the contracting authority has published a contract award notice in the Official Journal of the European Union (with effect from the day following the publication date);
2. 30 calendar days starting the day after the contracting authority has informed the tenderers in question, that the contracting authority has entered into a contract based on a framework agreement through reopening of competition or a dynamic purchasing system, provided that the notification includes a short account of the relevant reasons for the decision;
2. 30 calendar days starting the day after the contracting authority has informed the tenderers in question, that the contracting authority has entered into a contract based on a framework agreement through reopening of competition or a dynamic purchasing system, provided that the notification includes a short account of the relevant reasons for the decision;
3. 6 months starting the day after the contracting authority has sent notification to the candidates/tenderers involved that the contracting authority has entered into the framework agreement, provided that the notification included a short account of the relevant reasons for the decision.
3. 6 months starting the day after the contracting authority has sent notification to the candidates/tenderers involved that the contracting authority has entered into the framework agreement, provided that the notification included a short account of the relevant reasons for the decision.
Tjeneste, hvorfra der kan indhentes oplysninger om klageproceduren
Navn: Konkurrence- og Forbrugerstyrelsen
Postadresse: Carl Jacobsen Vej 35
Postby: Valby
Postnummer: 2500
Telefon: +45 41715000📞
E-mail: kfst@kfst.dk📧
Internetadresse: http://www.kfst.dk🌏
Kilde: OJS 2017/S 120-243385 (2017-06-22)
Bekendtgørelse om indgåede kontrakter (2017-10-16) Objekt Bekendtgørelsens metadata
Dokumenttype: Bekendtgørelse om indgåede kontrakter
The applicant must submit a completed European Single Procurement Document (ESPD) to apply for prequalification for this tender procedure. The ESPD for this tender can be found in the prequalification material via EU-supply.
To complete the ESPD, please:
— Save the XML file onto your own computer,
— Open the link https://ec.europa.eu/growth/tools-databases/espd/welcome,
— Choose the preferred language,
— Choose ‘I am an economic operator’,
— Choose ‘Import ESPD’,
— Upload the XML file of the ESPD,
— Choose the country of your companies origin,
— Fill out and complete the ESPD with the information required in this contract notice,
— When finished filling out the ESPD, print the version as a pdf and safe it on your computer,
— Upload the pdf version to ‘My response’ in EU-Supply as your/a part of your request for prequalification.
Please note the following:
— An applicant participating on its own, but relying on the capacities of one or more other entities (e.g. a parent or sister company or a subcontractor), must ensure that the application includes the applicants own ESPD together with a separate ESPD from each of the entities it relies on with a completed part II: ‘Information concerning the economic operator’ and part III: ‘Exclusion grounds’ of the ESPD as well as the relevant information regarding part IV: ‘Selection criteria’ and part V: ‘Reduction of the number of qualified candidates’. The ESPD from each of the entities should be duly filled and signed by the entities concerned.
Further Where an applicant wants to rely on the capacities of other entities, it shall prove to the contracting authority that it will have at its disposal the resources necessary, for example, by producing a commitment by those entities to that effect, which must be submitted as part of the final documentation.
— Where groups of economic operators, including temporary associations, participate together in the procurement procedure, a complete separate ESPD for each the participating economic operators must be submitted.
Further the final documentation must include a signed declaration by all parties of the group of economic operators (joint venture, consortium or other) stating that all economic operators assume joint and several liabilities towards the Contracting Authority for the performance of the contract as a whole.
The applicant must submit a completed European Single Procurement Document (ESPD) to apply for prequalification for this tender procedure. The ESPD for this tender can be found in the prequalification material via EU-supply.
— Fill out and complete the ESPD with the information required in this contract notice,
— When finished filling out the ESPD, print the version as a pdf and safe it on your computer,
— Upload the pdf version to ‘My response’ in EU-Supply as your/a part of your request for prequalification.
Please note the following:
— An applicant participating on its own, but relying on the capacities of one or more other entities (e.g. a parent or sister company or a subcontractor), must ensure that the application includes the applicants own ESPD together with a separate ESPD from each of the entities it relies on with a completed part II: ‘Information concerning the economic operator’ and part III: ‘Exclusion grounds’ of the ESPD as well as the relevant information regarding part IV: ‘Selection criteria’ and part V: ‘Reduction of the number of qualified candidates’. The ESPD from each of the entities should be duly filled and signed by the entities concerned.
Further Where an applicant wants to rely on the capacities of other entities, it shall prove to the contracting authority that it will have at its disposal the resources necessary, for example, by producing a commitment by those entities to that effect, which must be submitted as part of the final documentation.
— Where groups of economic operators, including temporary associations, participate together in the procurement procedure, a complete separate ESPD for each the participating economic operators must be submitted.
Further the final documentation must include a signed declaration by all parties of the group of economic operators (joint venture, consortium or other) stating that all economic operators assume joint and several liabilities towards the Contracting Authority for the performance of the contract as a whole.
Objekt Omfanget af udbuddet
Beskrivelse af mulighederne: Option 1: Alternative location of the compressor station
Tildeling af kontrakt
Dato for kontraktindgåelse: 2017-09-19 📅
Navn: Uniper Technologies GmbH
Nationalt registreringsnummer: DE192205292
Postadresse: Alexander von Humboldt Straße 1
Postby: Gelsenkirchen
Postnummer: 45886
Land: Tyskland 🇩🇪
E-mail: adithya.ramalingam@uniper.energy📧