Energinet.dk, owner of the Vester Hassing synchronous condenser (VHA G1), has decided to invite tenders for major overhaul of the ASEA salient pole generator (phase shifter). VHA G1 is an 80MVA outdoor synchronous condenser unit commissioned around 1965 and it is still in operation. The stator winding (12kV) was rewound in 1982. The overhaul is planned to start week 39, 2017 ending no later than week 51, 2017. The major overhaul (which includes withdrawal of the rotor and bringing it to workshop), takes place at the Vester Hassing high voltage substation, Energinet.dk, Elsamvej 73, 9310, Vodskov.
Deadline
Fristen for modtagelse af bud var på 2016-10-13.
Indkøbet blev offentliggjort på 2016-09-27.
Leverandører
Følgende leverandører er nævnt i tildelingsbeslutninger eller andre indkøbsdokumenter:
Objekt Omfanget af udbuddet
Titel: Vester Hassing Synchronous Condenser Major Overhaul.
16/07780
Produkter/tjenester: Drift af kraftværker📦
Kort beskrivelse:
“Energinet.dk, owner of the Vester Hassing synchronous condenser (VHA G1), has decided to invite tenders for major overhaul of the ASEA salient pole...”
Kort beskrivelse
Energinet.dk, owner of the Vester Hassing synchronous condenser (VHA G1), has decided to invite tenders for major overhaul of the ASEA salient pole generator (phase shifter). VHA G1 is an 80MVA outdoor synchronous condenser unit commissioned around 1965 and it is still in operation. The stator winding (12kV) was rewound in 1982. The overhaul is planned to start week 39, 2017 ending no later than week 51, 2017. The major overhaul (which includes withdrawal of the rotor and bringing it to workshop), takes place at the Vester Hassing high voltage substation, Energinet.dk, Elsamvej 73, DK-9310 Vodskov.
Supplerende oplysninger Oprindelig reference til meddelelsen
Meddelelsesnummer i EUT S: 2016/S 189-338759
Ændringer Tekst, der skal berigtiges i den oprindelige meddelelse
Afsnittets nummer: III.1.5
Gammel værdi
Tekst:
“The contract is reserved to sheltered workshops and economic operators aiming at the social and professional integration of disabled or disadvantaged persons.” Ny værdi
Tekst: —
Kilde: OJS 2016/S 194-349577 (2016-10-05)
Bekendtgørelse om indgåede kontrakter (2017-05-21) Objekt Omfanget af udbuddet
Kort beskrivelse:
“Energinet.dk , owner of the Vester Hassing synchronous condenser (VHA G1), has decided to invite tenders for major overhaul of the ASEA salient pole...”
Kort beskrivelse
Energinet.dk , owner of the Vester Hassing synchronous condenser (VHA G1), has decided to invite tenders for major overhaul of the ASEA salient pole generator (phase shifter). VHA G1 is an 80MVA outdoor synchronous condenser unit commissioned around 1965 and it is still in operation. The stator winding (12kV) was rewound in 1982. The overhaul is planned to start week 39, 2017 ending no later than week 51, 2017. The major overhaul (which includes withdrawal of the rotor and bringing it to workshop), takes place at the Vester Hassing high voltage substation, Energinet.dk, Elsamvej 73, DK-9310 Vodskov.
1️⃣
Yderligere produkter/tjenester: Eldistribution og beslægtede tjenester📦
Sted for udførelsen: Danmark🏙️
Hovedsted eller sted for udførelsen: 9310 Vodskov.
Beskrivelse af udbuddet:
“Energinet.dk , owner of the Vester Hassing synchronous condenser (VHA G1), has decided to invite tenders for major overhaul of the ASEA salient pole...”
Beskrivelse af udbuddet
Energinet.dk , owner of the Vester Hassing synchronous condenser (VHA G1), has decided to invite tenders for major overhaul of the ASEA salient pole generator (phase shifter). VHA G1 is an 80MVA outdoor synchronous condenser unit commissioned around 1965 and it is still in operation. The stator winding (12kV) was rewound in 1982. The overhaul is planned to start week 39, 2017 ending no later than week 51, 2017. The major overhaul (which includes withdrawal of the rotor and bringing it to workshop), takes place at the Vester Hassing high voltage substation, Energinet.dk , Elsamvej 73, DK-9310 Vodskov.
Vis mere Oplysninger om valgmuligheder
Indstillinger ✅
Beskrivelse af mulighederne:
“1. Additional services and tests according to the technical specification.
2. Additional components according to the technical specification.”
Procedure Type af procedure
Forhandlet procedure med forudgående indkaldelse af konkurrencer
Administrative oplysninger
Tidligere offentliggørelse vedrørende denne procedure: 2016/S 189-338759
Oplysninger om afslutning af indkaldelse af konkurrencen i form af en forhåndsmeddelelse
Den ordregivende myndighed vil ikke tildele yderligere kontrakter på grundlag af ovennævnte forhåndsmeddelelse
Tildeling af kontrakt
1️⃣
Kontraktnummer: 1
Titel: Vester Hassing Synchronous Condenser Major Overhaul
Dato for indgåelse af kontrakten: 2017-03-13 📅
Navn og adresse på kontrahenten
Navn: EthosEnergy Poland SA
Nationalt registreringsnummer: PL575-00-08-008
Postadresse: ul.Powstańców Śląskich 85
Postby: Lubliniec
Postnummer: 42-701
Land: Polen 🇵🇱
E-mail: knud.brandelev@siemens.com📧
Region: Polska 🏙️
Entreprenøren er en SMV
Supplerende oplysninger Gennemgå organ
Navn: Klagenævnet for Udbud
Postadresse: Nævnenes Hus, Toldboden 2
Postby: Viborg
Postnummer: 8800
Land: Danmark 🇩🇰
Telefon: +45 35291095📞
E-mail: klfu@erst.dk📧
URL: https://erhvervsstyrelsen.dk/klagenaevnet-for-udbud🌏 Gennemgangsprocedure
Præcise oplysninger om fristerne for gennemgangsprocedurer:
“Whereas a contracting authority has initiated a restricted procedure, a negotiated procedure with prior publication of a contract notice, or a procedure of...”
Præcise oplysninger om fristerne for gennemgangsprocedurer
Whereas a contracting authority has initiated a restricted procedure, a negotiated procedure with prior publication of a contract notice, or a procedure of competitive dialogue in accordance with Directive 2004/18/EC of the European Parliament and of the Council or Directive 2004/17/EC of the European Parliament and of the Council, complaints from not pre-qualified applicants regarding the decision concerning pre-qualification must be filed to the Complaints Board for Public Procurement within 20 days from the day after the contracting authority has sent the result regarding the pre-qualification decision to all relevant candidates.
Complaints regarding any part of the procurement process within the scope of Directive 2004/18/EC of the European Parliament and of the Council and Directive 2004/17/EC of the European Parliament and of the Council, but not covered by the above paragraph shall be filed to the Complaints Board for Public Procurement within 45 days from the day after the contracting authority has made a contract award notice public in the Official Journal of the European Union.
The complainant shall inform the contracting authority about the complaint at the latest when the complaint is filed with the Complaints Board for Public Procurement. In case the complaint concerns a decision regarding award of a contract the complainant shall inform the contracting authority whether the complaint is filed within the standstill period. If the complaint is not filed within the standstill period the complainant shall inform the contracting authority whether a suspension of the contract has been requested.
Vis mere
Kilde: OJS 2017/S 099-196899 (2017-05-21)