Kort beskrivelse
The Owner of S/S Georg Stage seeks to enter into a contract with a shipyard for the yard to carry out certain
rehabilitation works on the vessel. This is the second out of two rehabilitation projects for the vessel. As an
introduction to the scope of works, this second rehabilitation project addresses the aft- and midship of the
vessel. The overall rehabilitation tasks are:
— Interior fittings are stripped to expose shell plating and frames
— Beams, frames, bulkheads and shell plating are sandblasted, steel replaced where needed
— Gutters, half-deck and main deck
— Replacement of teak decking on half-deck and main deck.
— Re-building of interior.