Purchase of Monorail for use in the Great Belt bridge

A/S Storebælt

A/S Storebælt has 3 deck shuttles located in the East Bridge of the Great Belt Link. These 3 deck shuttles are at the end of their expected life time, and hence must be substituted with 3 new deck shuttles. The deck shuttles run on a monorail situated on top of the deck shuttles. The deck shuttles must be able to carry 2 persons and their hand tools and be able to hook on a trailer for material transport.
The bridge is divided into 3 sections, and a deck shuttle is located in each section. The 3 sections are approx. 1 550 m, 2 700 m and 2 520 m long.
The delivery comprises of design, production, transport, installation and commissioning of the three (3) new deck shuttles, and three (3) trailers for material transport.

Deadline
Fristen for modtagelse af bud var på 2016-08-03. Indkøbet blev offentliggjort på 2016-06-28.

Hvem?

Hvad?

Hvor?

Indkøbshistorik
Dato Dokument
2016-06-28 Udbudsbekendtgørelse