Kriegers Flak Combined Grid Solution UXO survey and services

Energinet.dk

Kriegers Flak CGS (Combined Grid Solution) is a joint project between Energinet.dk and 50Hz Transmission to interconnect the Danish and German grid via the two offshore wind farms at Kriegers Flak and Baltic 2. The Contracting Authority wants to purchase UXO survey and services in order to reduce the risk level at the installation area along the 2 cable routes to As Low As Reasonably Practicable (ALARP). The services are: 1. Geophysical Survey 2. Inspection of possible UXO objects 3. Removal/Detonation of identified UXO objects.

Deadline
Fristen for modtagelse af bud var på 2016-10-31. Indkøbet blev offentliggjort på 2016-10-14.

Leverandører
Følgende leverandører er nævnt i tildelingsbeslutninger eller andre indkøbsdokumenter:
Hvem?

Hvad?

Hvor?

Indkøbshistorik
Dato Dokument
2016-10-14 Udbudsbekendtgørelse
2017-03-27 Bekendtgørelse om indgåede kontrakter