Kriegers Flak Combined Grid Solution Burial and Protection of 150 kV Submarine Cables

Energinet.dk

Kriegers Flak CGS (Combined Grid Solution) is a joint project between Energinet.dk and 50Hertz Transmission to interconnect the Danish and German grid via the two offshore wind farms at Krieger's Flak (DK) and Baltic 2 (DE). The Contracting Entity wants to procure Burial and Protection of approximately 2 x 24 km of submarine cable route, which is to be divided into trenching and jetting work for the Krieger's Flak CGS connection. The works includes inter alia:
1. Boulder Removal
2. Pre-trenching/trenching
3. Jetting
4. Covering the Trench
5. Surveys and Documentation.

Deadline
Fristen for modtagelse af bud var på 2016-12-29. Indkøbet blev offentliggjort på 2016-12-08.

Hvem?

Hvad?

Hvor?

Indkøbshistorik
Dato Dokument
2016-12-08 Udbudsbekendtgørelse
2017-10-03 Bekendtgørelse om indgåede kontrakter