Gravity Based Sub-Structures for KFA and KFBE Offshore Substations (OSS) for Kriegers Flak
Detailed Engineering, Procurement, Construction and offshore Installation based on Employers basic design and general specifications of 2 gravity based substructures (GBS). The substructures are to be used as foundations for the 3 AC offshore substation topsides (KFA, KFB and KFE) for 2 projects called Kriegers Flak AC and Kriegers Flak Combined Grid Solution (CGS).
Fabrication and Transportation of substructures to the offshore construction site, preparation of seabed, placement of the substructures, preparing of scour protection, all other relevant works for fabrication, transport and offshore installation.
The expected time for execution of the contract is Q4 2016 — Q1 2018, subject to change of time schedule. Related services.
Deadline
Fristen for modtagelse af bud var på 2016-03-14.
Indkøbet blev offentliggjort på 2016-02-26.
Leverandører
Følgende leverandører er nævnt i tildelingsbeslutninger eller andre indkøbsdokumenter:
Hvem?
Hvad?
Hvor?
Indkøbshistorik
Dato |
Dokument |
2016-02-26
|
Udbudsbekendtgørelse
|
2016-11-28
|
Bekendtgørelse om indgåede kontrakter
|