Transport and installation of an Offshore Substation for Borkum Riffgrund 02, offshore wind farm

DONG Energy Wind Power A/S

The work comprised by the Contract (the "Work") will consist of the following 2 lots:
Lot 1: The transport and installation of the jacket and piles for the offshore substation at the Borkum Riffgrund 02 offshore wind farm.
Lot 2: The transport and installation of the topside for the offshore substation at the Borkum Riffgrund 02 offshore wind farm.
A tender regarding Lot 1 and Lot 2, respectively, can be submitted as a stand-alone tender. Moreover, a tender regarding Lot 1 and Lot 2, respectively, can be submitted as a bundled tender (i.e. a tender with a price discount conditional upon the tenderer being awarded both Lot 1 and Lot 2).
If both Lot 1 and Lot 2 are awarded to the same Contractor, one contract will be entered into covering both lots.
For further information about each Lot, please se Notice for prequalification, to be requested by the Contact Point, cf. I.1.

Deadline
Fristen for modtagelse af bud var på 2015-05-26. Indkøbet blev offentliggjort på 2015-04-22.

Leverandører
Følgende leverandører er nævnt i tildelingsbeslutninger eller andre indkøbsdokumenter:
Hvem?

Hvad?

Hvor?
  • • Deutschland

Indkøbshistorik
Dato Dokument
2015-04-22 Udbudsbekendtgørelse
2016-03-07 Bekendtgørelse om indgåede kontrakter