Purchase of a Helium liquefaction set-up
The Contracting Authority puts out to 1 The liquefaction set-up should contain an intermediate low-pressure storage (called low gas permeability bag), gas purifier (purifier), compressor (high pressure compressor), and helium liquefier (liquefier). The set-up should be connected to the helium gas outlet of the Bruker 950 MHz magnet and have the possibility to connect other helium gas sources.
Deadline
Fristen for modtagelse af bud var på 2016-01-11.
Indkøbet blev offentliggjort på 2015-11-30.
Hvem?
Hvad?
Hvor?
Indkøbshistorik
Dato |
Dokument |
2015-11-30
|
Udbudsbekendtgørelse
|