DONG Energy Thermal Power A/S

The scope of works relates to DONG Energy Thermal Power's conversion of Studstrup Power Station's unit 3 from coal firing to 100 % wood pellet operation.
Following shall be installed:
— Fire water pumps and system;
— Carbon steel fire water piping system;
— Foam extinguishing pumps and system;
— Carbon steel foam extinguishing pipe system;
— Stainless steel N2 piping system.
All systems and equipment must be fit for purpose and designed with due consideration for QHSE and current and relevant mandatory regulations in force within the European Community.
Technical requirements enclosed with the contract provide substantial liberty for the Applicant to solve technical and process challenges as long as optimum functionality, reliability and performance is obtained.

Deadline
Fristen for modtagelse af bud var på 2015-04-15. Indkøbet blev offentliggjort på 2015-03-27.

Hvem?

Hvad?

Hvor?

Indkøbshistorik
Dato Dokument
2015-03-27 Udbudsbekendtgørelse