Lot M3: Boiler and auxiliary systems

HOFOR Energiproduktion A/S

Lot M3: Boiler and auxiliary and systems.
The Works includes design, engineering, documentation, fabrication, transportation, construction and commissioning of a complete functional bio-mass fired CFB-boiler plant with nominal fuel input of 500 MW inclusive boiler building and auxiliary and service systems. Fuel is clean woodchips.
Boiler.
Boiler including installations for fuel feeding, deNOx, feed water pumps, ash handling and high pressure piping for steam and feed water.
Auxiliary systems.
Low pressure piping for internal cooling water, compressed air, vacuum cleaning etc.
Air Compressor Station for entire plant.
Water sampling station and chemical dosing.
Service systems.
Ventilation for the boiler building.
Complete stationary lifting equipment, cranes and hoists in boiler building.
Elevator in boiler building.
Electrical and C&I.
Instrumentation including cabling for own scope.
Electrical installations including motors, cabling and frequency inverters.
Civil works/building.
Steel structure for the boiler building including platforms, galleries and stairs
Boiler building walls and roofing, optional cladding.
The Scope of Works excludes:
Pilling and civil works.
Main DCS system.
The supplier shall be able to provide maintenance and support to the equipment.

Deadline
Fristen for modtagelse af bud var på 2015-05-08. Indkøbet blev offentliggjort på 2015-04-01.

Leverandører
Følgende leverandører er nævnt i tildelingsbeslutninger eller andre indkøbsdokumenter:
Hvem?

Hvad?

Hvor?

Indkøbshistorik
Dato Dokument
2015-04-01 Udbudsbekendtgørelse
2016-08-10 Bekendtgørelse om indgåede kontrakter