Lot M1: Cranes and receiving hoppers

HOFOR Energiproduktion A/S

Two hydraulic port cranes including receiving hoppers for unloading wood chips from ships to quay conveyors.
The cranes shall also be able to handle logs from ships.
The hoppers shall have a dedusting system.
The cranes and hoppers are placed on rails and shall have a travelling length of app. 350 m.
Unloading capacity is app. 1 500 lm3/h per crane.
Shipsize are coasters and Handysize.
Electrical and DCS:
The supply includes all electrical works in Lot M1, including cables and cable trays from supplied equipment to employers MCC/DCS.
Scope including Engineering:
Full engineering, purchase, manufacturing, installation, commissioning, testing incl. guarantee test and documentation.
The supplier shall be able to provide maintenance and support to the equipment.
Civil is not a part of the supply.

Deadline
Fristen for modtagelse af bud var på 2015-05-08. Indkøbet blev offentliggjort på 2015-04-01.

Leverandører
Følgende leverandører er nævnt i tildelingsbeslutninger eller andre indkøbsdokumenter:
Hvem?

Hvad?

Hvor?

Indkøbshistorik
Dato Dokument
2015-04-01 Udbudsbekendtgørelse
2016-08-10 Bekendtgørelse om indgåede kontrakter