Kriegers Flak Combined Grid Solution (KF CGS) 150 kV 3 core submarine cable including transport, laying and installation

Energinet.dk

The scope of work includes, in particular, design, production, delivery, execution and completion of 2 x 25 km 3 core 150 kV Submarine Cable including:
— Transport and laying of the 150 kV Submarine Cables;
— Pull-in onto Kriegers Flak E (KFE) and Baltic 2 platforms;
— Delivery and installation of end-terminations for the cables on the KFE and Baltic 2 platforms and
— Related services.
The transfer capability for each Submarine Cable is supposed to be at least 200 MW (steady load). The contracting entity reserves the right to increase the transfer capability of each cable to be at least 225 MW (steady load).
The relevant details will be specified in the tender documents.

Deadline
Fristen for modtagelse af bud var på 2015-11-18. Indkøbet blev offentliggjort på 2015-10-27.

Leverandører
Følgende leverandører er nævnt i tildelingsbeslutninger eller andre indkøbsdokumenter:
Hvem?

Hvad?

Hvor?

Indkøbshistorik
Dato Dokument
2015-10-27 Udbudsbekendtgørelse
2015-11-03 Supplerende oplysninger
2016-12-29 Bekendtgørelse om indgåede kontrakter