JFK and Storstrømmen — Offshore — Protection and Removal
Description of the projects:
1. JFK:
In 2017 two existing 150 kV submarine cable connections has reached the end of their lifetime and need to be decommissioned. The cable connections are from Als to Funen and across Kolding Fjord. In addition two new 150 kV submarine cable connection, one between Fredericia and Funen and one between Als and Funen will reinforce the grid on Funen.
2. Storstrømmen:
Energinet.dk owns and operates 3 submarine cable systems in the strait that will have to be decommissioned and removed in connection with a new bridge being constructed. In addition two cable connections connecting Masnedø and Zealand will have to be removed due to developments in Vordingborg harbour. Therefore Energinet.dk has decided to replace these three cables with a new submarine cable connection to secure the power flow between Zealand and the Islands of Falster and Lolland.
The scope of work includes:
— Protection, via Jetting and/or pre-trenching, of two subma-rine cables of the RYT-GRP-FVO and ABS-SØN cable laying projects (also called JFK). The two sections is in total 18 km;
— Removal of 2 existing submarine cables in Lillebælt between Fynshav and Horneland and across Kolding Fjord. In total approximately 13 km submarine cable;
— The transport and laying of 18 km submarine cables of the JFK project. This Cable is to be layed in two sections of 6 and 12 km respectively, in two separate locations, one in the northern part of Lillebælt and one in the southern part of Lillebælt. The laying includes pull in operations onshore;
— Protection, via jetting and / or pre-trenching, of 6 km sub-marine cable in the Storstrømmen project;
— Removal of 5 existing cables in Storstømmen- og Madsnesund strait. In total approximately 13 km Submarine cable;
— The transport and laying of 6 km submarine cables of the Storstrømmen project. The laying includes pull in operations onshore.
Lot 1:
Protection via jetting and/or pre-trenching of two submarine cables of the RYT-GRP-FVO and ABS-SØN cable laying projects (also called JFK).
Removal of 2 existing submarine cables in Fynshav and Kolding Fjord.
Option 1: Option of transport and laying of the submarine cables of the JFK project.
Lot 2: Protection via jetting and/or pre-trenching, of the submarine cable in the Storstrømmen project.
Removal of 5 existing cables in Storstømmen- og Madsnesund strait.
Option 2: Option of transport and laying of the submarine cables of the Storstrømmen project.
Deadline
Fristen for modtagelse af bud var på 2015-05-11.
Indkøbet blev offentliggjort på 2015-04-16.
Leverandører
Følgende leverandører er nævnt i tildelingsbeslutninger eller andre indkøbsdokumenter:
Hvem?
Hvad?
Hvor?
Indkøbshistorik
Dato |
Dokument |
2015-04-16
|
Udbudsbekendtgørelse
|
2015-09-30
|
Bekendtgørelse om indgåede kontrakter
|