HCV Peak load Boiler Plant M-01 Gasboilers
Design, manufacturing, delivery, installation and commissioning of complete natural gas fired hot water boiler plant(s). Total capacity (output to district heating system): 50 MJ/s. The delivery includes:
1. Boiler(s);
2. Flue gas ducts from boiler(s) to existing chimney on top of the boiler building;
3. Modification of existing chimney;
4. Natural gas piping;
5. Internal district heating piping.