Gravity Based Sub-Structures for KFA and KFBE Offshore Substations (OSS)

Energinet.dk

The scope of work includes in particular:
Detailed Engineering, Procurement, Construction and offshore Installation based on Employers basic design and general specifications of 2 gravity based substructures (GBS). The substructures are to be used as foundations for the 3 AC offshore substation topsides (KFA, KFB and KFE) for two projects called Kriegers Flak AC and Kriegers Flak Combined Grid Solution (CGS). Fabrication and Transportation of substructures to the offshore construction site, preparation of seabed, placement of the substructures, preparing of scour protection, all other relevant works for fabrication, transport and offshore installation The expected time for execution of the contract Q3 2016 — Q1 2018, subject to change of time schedule.
Related services.

Deadline
Fristen for modtagelse af bud var på 2016-01-13. Indkøbet blev offentliggjort på 2015-12-22.

Hvem?

Hvad?

Hvor?

Indkøbshistorik
Dato Dokument
2015-12-22 Udbudsbekendtgørelse
2016-02-19 Supplerende oplysninger