Establishment of flue gas condensation plant on existing waste-to-energy facility
Retrofit of a flue gas condensation plant with direct condensation to an existing wet flue gas cleaning plant on a Waste-to-Energy facility. The flue gas condensation shall be based on a condensing scrubber and include condensate water treatment and inhouse connection to the district heating system. The Works consists of overall process layout, calculations, design, manufacturing and delivery, installation, commissioning and hand over of all machinery, controls and electrical systems.
Deadline
Fristen for modtagelse af bud var på 2015-11-13.
Indkøbet blev offentliggjort på 2015-10-12.
Leverandører
Følgende leverandører er nævnt i tildelingsbeslutninger eller andre indkøbsdokumenter:
Hvem?
Hvad?
Hvor?
Indkøbshistorik
Dato |
Dokument |
2015-10-12
|
Udbudsbekendtgørelse
|
2016-08-10
|
Bekendtgørelse om indgåede kontrakter
|