Copenhagen Metro Line M1 and M2 — Wheel Lathe for the Control and Maintenance Center (CMC)
The Metro line M1 and M2 have been operated for more than 15 years.
The present underfloor wheelset lathe located at the CMC Metrovej 5 has increasingly been the subject of repair and continual breakdowns. This contract notice comprises the procurement of replacing the wheel lathe with a new.
The Technical Specifications for the new Wheel Lathe can be downloaded from
www.bascon.dk/da/udbud. The rest of the tender documents can be obtained via an e-mail to Carsten Larsen,
cla@m.dk
Deadline
Fristen for modtagelse af bud var på 2015-11-02.
Indkøbet blev offentliggjort på 2015-09-16.
Hvem?
Hvad?
Hvor?
Indkøbshistorik
Dato |
Dokument |
2015-09-16
|
Udbudsbekendtgørelse
|
2015-10-23
|
Supplerende oplysninger
|
2016-01-11
|
Supplerende oplysninger
|
Nye indkøb inden for beslægtede kategorier 🆕