Brønderslev Varme — Biomass fired CHP plant — Mechanical utillity

Brønderslev Varme A/S

The biomass-fired CHP plant must include design, supply, installation and commissioning of a complete biomass-fired CHP plant having a thermal power output of approximately 20 MW power (including flue gas condensation). The plant must be able to treat and burn wood chips with a moisture content from 30 % to 55 %. The plant must produce both electricity and heat. The system is established with ORC and exhaust gas condensing. The contract covers the total mechanical installation including cranes, batching plant, boiler, electricity producing unit (ORC), transformers, flue gas cleaning plant, flue gas condensation plant, chimney, electrical equipment and SCADA system. The biomass fired CHP plant will be connected to a solar system based on thermal oil. The complete solar system incl. thermal oil system is contained in another contract. The contractor will participate in the definition of the designparamters, the design and include the physical connection.
General: The final requirements and all design parameters, construction limits and integration into the existing plant will be specified in the tender documents.

Deadline
Fristen for modtagelse af bud var på 2015-08-14. Indkøbet blev offentliggjort på 2015-07-02.

Leverandører
Følgende leverandører er nævnt i tildelingsbeslutninger eller andre indkøbsdokumenter:
Hvem?

Hvad?

Hvor?

Indkøbshistorik
Dato Dokument
2015-07-02 Udbudsbekendtgørelse
2015-08-05 Supplerende oplysninger
2016-06-13 Bekendtgørelse om indgåede kontrakter