AC Off Shore Substation (OSS) topsides for Kriegers Flak

Energinet.dk

The scope of work includes in particular:
— Fabrication of 3 AC offshore substation topsides for two projects called Kriegers Flak AC and Kriegers Flak CGS app. weight of substation topsides between app. 900 to app. 2 000 Metric tonnes.
The fabrication will be based on detailed design issued by the procuring entities. However, Contractor shall also deliver design where required.
Delivery on sites in the Baltic Sea.
App. outline measures of the largest substation topside: length 46 m, width 33 m, height 14 m (without helideck).
— Commissioning of the AC offshore substation topsides.
— Related services.

Deadline
Fristen for modtagelse af bud var på 2015-11-17. Indkøbet blev offentliggjort på 2015-10-26.

Leverandører
Følgende leverandører er nævnt i tildelingsbeslutninger eller andre indkøbsdokumenter:
Hvem?

Hvad?

Hvor?

Indkøbshistorik
Dato Dokument
2015-10-26 Udbudsbekendtgørelse
2015-10-29 Supplerende oplysninger
2016-08-08 Bekendtgørelse om indgåede kontrakter