SKV40 Wood Chips - feed water tank
Introduction:
DONG Energy Thermal Power is planning to implement district heating production based on biofuels through erection of a number of wood-chip boilers, providing steam for existing steam turbine and/or stand alone district heating condenser. Two to four boilers are envisaged as an add-on to the existing gas fired plant, Skærbækværket. The new biomass fired boilers shall deliver up to 320 MW heat to the district heating system. It is envisaged that the new boiler plant shall have a capacity of maximum 280 MW and the remaining 40 MW will be provided by flue gas condensers.
Feed water tank with deaerator:
The new biofuel boilers will be equipped with 1 (one) new feed water tank with an approximate volume of 135 m³. The feed water tank shall be supplied with a deaerator and heated by the auxiliary steam system. The working temperature in the feed water tank will be approximately 130-140 deg. Celsius.
The feed water tank shall be supplied complete with the necessary pipe connections and measuring sockets. Insulation and surface covering shall not be included. Tank, deaerator, and sockets must be prepared for attachment of insulation and aluminium plates. Fittings are not included in the delivery.
The steel frame of the feed water tank including all necessary platforms and stairs shall be part of the delivery.
The delivery shall include design, manufacturing, delivery and erection of the feed water tank and steel frame. Documentation necessary for the safe operation and maintenance is included in the delivery.
Deadline
Fristen for modtagelse af bud var på 2014-05-19.
Indkøbet blev offentliggjort på 2014-05-02.
Hvem?
Hvad?
Hvor?
Indkøbshistorik
Dato |
Dokument |
2014-05-02
|
Udbudsbekendtgørelse
|