SKV40 Civil Works – New quay and quay facilities

DONG Energy Thermal Power A/S

Dong Energy Thermal Power is planning to implement district heating production based on biofuels through erection of a number of wood-chip boilers, providing steam for existing steam turbine and/or stand-alone district heating condensor. Two to four boilers are envisaged as an add-on to the existing gas fired plant, Skærbækværket. The new biomass fired boilers shall deliver up to 320 MW heat to the district heating system.
Fuel will be wood chips, which will be brought in to the plant from the sea side. The present contract concerns the establishment of a new quay wall in front of the existing quay wall including all corresponding structures as well as foundations for crane and conveyor belt system behind the quay wall.
The civil works contract concerns construction works in connection with the establishment of approximately 240 meter of new quay wall in front of an existing quay wall including:
— removal of existing scour protection,
— installation of 240 meter sheet pile wall,
— removal of soft deposits between the new and old sheet pile wall,
— backfilling of new quay wall,
— installation of anchorage,
— casting of concrete capping beam,
— installation of bollards and ladders,
— installation of fender wall,
— piling of concrete piles behind quay wall,
— foundation for crane rails,
— foundations for conveyor belt system,
— drainage and pavement,
— adjoining works.

Deadline
Fristen for modtagelse af bud var på 2014-03-17. Indkøbet blev offentliggjort på 2014-02-28.

Leverandører
Følgende leverandører er nævnt i tildelingsbeslutninger eller andre indkøbsdokumenter:
Hvem?

Hvad?

Hvor?

Indkøbshistorik
Dato Dokument
2014-02-28 Udbudsbekendtgørelse
2014-05-07 Supplerende oplysninger
2014-09-12 Bekendtgørelse om indgåede kontrakter