SCADA Network and Telecommunication for Horns Rev 03 Offshore Wind Farm (HRV03)

DONG Energy Wind Power A/S

Supply Management, Telecommunication equipment and Network Equipment and options for:
— Panels,
— Network Cable Termination and
— A service agreement for either 1 or 5 years.
The Tenderer shall tender for the complete Scope of Works including options. The Contracting Entity shall have the right to deliver the options as free issue for the Contractor which will ensure flexibility.
The Scope of Works for the wind farm will include the following deliveries and services:
1.1.1 Project and supply Management
Contractor's scope of supply
— Project management
— Interface management
— Configuration and change management
— Detailed system design
— FAT, FIT, SAT and SIT for all system deliveries and panels
— Supervision and coordination during installation on substations
— Technical support
— Documentation
1.1.2 Telecommunication systems
Contractor's scope of supply
— Detailed system design and supply of
Telephone system,
Radio systems (VHF and Tetra),
LOS.
— LOS desktop study and field survey for ‘Line-Of-Sight’ verification
1.1.3 Network system
Contractor's scope of supply
— Design of fibre and Cu infrastructure incl. network panels
— ODF and patch panel supply and assembly of network equipment
— Delivery of network equipment
Employer's scope of supply
— Programming and Configuration of network equipment
— Functional test of network
1.1.4 Panel supply and integration
Contractor's scope of supply (options)
— Panel design
— Panel supply and assembly of equipment in panels
1.1.5 Installation and termination works
Contractor's scope of supply (options)
— Installation of surge arrestors on antenna cables
— Termination of antenna cables
— Fibre Splice work on substations incl. control measurement
— LAN patching (RJ45) on the onshore and offshore substations
— Installation on relay stations under-way.
Employer's scope of supply
— Installation of panels/equipment on the onshore and offshore substations
— Delivery and laying of cables on the onshore and offshore substations
1.1.6 Service agreement for either 1 or 5 years.
Contractor's scope of supply (options):
Service agreement for either 1 or 5 years.

Deadline
Fristen for modtagelse af bud var på 2014-11-25. Indkøbet blev offentliggjort på 2014-11-05.

Hvem?

Hvad?

Hvor?

Indkøbshistorik
Dato Dokument
2014-11-05 Udbudsbekendtgørelse
2015-03-24 Supplerende oplysninger