Pier C Extension 2015

Copenhagen Airports A/S

The extension of Pier C will provide bridge served aircraft stands to three gates for the long-haul air traffic. A small part of the building will consist of technical rooms on apron. The first floor is the primary passenger area. The extension will be connected to the existing Pier C by a ramp leading over an airport traffic lane. The necessary demolition and adjustment of existing facility is a part of the project. The second floor will consist of a technical area and a corridor for arriving non EU passengers.
The extension is primarily a concrete construction with facades of sandwich panels and glass and a modular roof construction.
A fenced construction site will be available for the contractor on apron. Before start-up on site the foundation for the construction will be provided be another contractor.
In the closing part of the construction phase, Copenhagen Airport will do minor internal installation works, such as electrical fittings, in the new building and cable- and pavement work on apron. These works will be performed by other contractors.

Deadline
Fristen for modtagelse af bud var på 2014-03-13. Indkøbet blev offentliggjort på 2014-02-05.

Hvem?

Hvad?

Hvor?

Indkøbshistorik
Dato Dokument
2014-02-05 Udbudsbekendtgørelse