Udbudsbekendtgørelse (2014-05-15) Objekt Omfanget af udbuddet
Titel: Risikovurdering i forbindelse med bygge- og anlægsarbejder
Mængde eller omfang: Reference is made to II.1.5) and the above mentioned Infodocument.
Bekendtgørelsens metadata
Originalsprog: engelsk 🗣️
Dokumenttype: Udbudsbekendtgørelse
Kontraktens art: Tjenesteydelser
Forordning: Den Europæiske Union, med deltagelse af GPA-lande
Fælles glossar for offentlige kontrakter (CPV)
Kode: Risikovurdering i forbindelse med bygge- og anlægsarbejder📦
Procedure
Procedureform: Udbud efter forhandling
Bud-type: Indsendelse gældende for alle delaftaler
Kriterier for tildeling
Det økonomisk mest fordelagtige bud
Ordregivende myndighed Identitet
Land: Danmark 🇩🇰
Type af ordregivende myndighed: Forsyningsvirksomhed
Navn på ordregivende myndighed: Metroselskabet I/S
Postadresse: Metrovej 5
Postnummer: 2300
Postby: København S
Kontakt
Internetadresse: http://www.m.dk🌏
E-mail: pos@m.dk📧
Telefon: +45 72424518📞
Three tenderers will be selected from among the applicants that comply with the minimum requirements of item III.2) of the contract notice.
The selection of Tenderers will be based on an overall assessment of how the contracting authority can obtain the most attractive tenders. This overall assessment comprises the below items A and B:
A) An assessment of technical capacity and competence on the basis of information requested in item III.2.3) of the contract notice.
B) An assessment of the applicant's capacity in regard to whether the applicant will be able to carry out the assignment quickly and flexibly, assessed on the basis of the information requested in item III.2 of the contract notice.
Regarding additional information in respect of other issues than selection criteria of tenderers reference is made to the above-mentioned Infodocument.
Questions (if any) to the procurement process shall be sent to cla@bascon.dk. Answers will be uploaded at www.bascon.dk/da/udbud
Note: the contract language will be in Danish. The working language will be either Danish or English.
Three tenderers will be selected from among the applicants that comply with the minimum requirements of item III.2) of the contract notice.
The selection of Tenderers will be based on an overall assessment of how the contracting authority can obtain the most attractive tenders. This overall assessment comprises the below items A and B:
A) An assessment of technical capacity and competence on the basis of information requested in item III.2.3) of the contract notice.
B) An assessment of the applicant's capacity in regard to whether the applicant will be able to carry out the assignment quickly and flexibly, assessed on the basis of the information requested in item III.2 of the contract notice.
Regarding additional information in respect of other issues than selection criteria of tenderers reference is made to the above-mentioned Infodocument.
The present contract notice comprises LR3CS7, Independent Safety Assessor.
The LR3CS7, Indendent Safety Assessor will be procured to assess all aspects of the specifications, design, manufacture, construction, installation, training, testing, commissioning, trial running and final acceptance of the Light Rail Transit system to verify compliance with the governing standards for the assessment services and the standards governing safety of the Ring 3 Light Rail.
The LR3CS7, Indendent Safety Assessor will be procured to assess all aspects of the specifications, design, manufacture, construction, installation, training, testing, commissioning, trial running and final acceptance of the Light Rail Transit system to verify compliance with the governing standards for the assessment services and the standards governing safety of the Ring 3 Light Rail.
Legislative basis for development of the project: A Law will be enacted by Parliament authorising construction of the Ring 3 Light Rail. Legislation, regulations, standards and norms governing safety of the design and operation of the Ring 3 Light Rail shall include (but are not limited to):
Legislative basis for development of the project: A Law will be enacted by Parliament authorising construction of the Ring 3 Light Rail. Legislation, regulations, standards and norms governing safety of the design and operation of the Ring 3 Light Rail shall include (but are not limited to):
- The applicable procedures for regulatory approval by the Danish Transport Authority (Trafikstyrelsen) must be complied with, including Order No. 56 of 24 January 2013 concerning approval of the light rail vehicles, Order No. 1187 of 12 December 2012 concerning authorisation for operation of railway subsystems, Order No. 14 of 4 January 2007 concerning safety certification of railway companies, Order No. 13 of 4 January 2007 concerning safety certification of railway infrastructure managers and Chapters 3 and 4 of the Rail Act concerning permission to operate rail services and managing rail infrastructure.
- The applicable procedures for regulatory approval by the Danish Transport Authority (Trafikstyrelsen) must be complied with, including Order No. 56 of 24 January 2013 concerning approval of the light rail vehicles, Order No. 1187 of 12 December 2012 concerning authorisation for operation of railway subsystems, Order No. 14 of 4 January 2007 concerning safety certification of railway companies, Order No. 13 of 4 January 2007 concerning safety certification of railway infrastructure managers and Chapters 3 and 4 of the Rail Act concerning permission to operate rail services and managing rail infrastructure.
- BOStrab (Verordnung über den Bau und Betrieb der Strassenbahnen) and BOStrab-Richtlinien;
- Applicable standards of Verband Deutscher Verkehrsunternehmen” (Association of German Transport Companies – VDV);
- Applicable Danish norms and standards;
- CENELEC railway standards EN 50126, 50128, 50129 (safety management, verification and validation);
- Applicable requirements of the CEN 45545 fire safety standards.
- The safety assessments shall be carried out pursuant to EN 50126 (RAMS), EN 50128 and EN 50129, which correspond respectivelyl to IEC 62278, IEC 62279 and IEC 62425.
Metroselskabet has prepared a document: “Information document - public procurement procedure for consulting services - Ring 3 Light Rail” (hereinafter refered to as the "Infodocument"), which gives potential applicants for prequalification further information about the assignment. The document is available at http://www.bascon.dk/da/udbud.
Metroselskabet has prepared a document: “Information document - public procurement procedure for consulting services - Ring 3 Light Rail” (hereinafter refered to as the "Infodocument"), which gives potential applicants for prequalification further information about the assignment. The document is available at http://www.bascon.dk/da/udbud.
Beskrivelse af mulighederne: Assessor assistance during the preliminary phase of operation
Varighed: 70 måneder Sted for udførelsen
Hovedsted eller sted for udførelsen:
At the service provider's home address, at Metroselskabets office located at Metrovej 5, DK-2300 Copenhagen S and at the offices of the Ring 3 Letbane I/S (under promotion).
Juridiske, økonomiske, finansielle og tekniske oplysninger Betingelser for deltagelse
Egnethed til at udøve det erhverv:
1) The request for participation must be submitted in three copies with the same wording and a digital copy on a USB or a CD.
2) The request may specify the company(ies) requesting prequalification; phone number; e-mail address and name of a contact person.
3) The request must include a general description of the company.
4) According to Consolidation Act No. 336 of 13 May 1997, the applicant must enclose a solemn declaration in respect of due, unpaid debt to the authorities.
5) The request must also be accompanied by a solemn declaration to the effect that the applicant is not excluded from participating in the tender procedure for reasons specified in Article 54 (4), second sentence(corresponding to the Public Procurement Directive, Article 45 (1)), and that the applicant is not excluded from participating in the tender procedure for reasons covered by the Public Procurement Directive, Article 45 (2),letters a, b, c, e and f.
5) The request must also be accompanied by a solemn declaration to the effect that the applicant is not excluded from participating in the tender procedure for reasons specified in Article 54 (4), second sentence(corresponding to the Public Procurement Directive, Article 45 (1)), and that the applicant is not excluded from participating in the tender procedure for reasons covered by the Public Procurement Directive, Article 45 (2),letters a, b, c, e and f.
If the request for participation comes from a consortium, the above-mentioned information in nos. 2-5 must be given for each participant in the consortium.
A template for the solemn declarations mentioned in nos. 4 and 5 above is available at http://www./bascon.dk/da/udbud
Økonomisk og finansiel stilling:
6) The request must be accompanied by information on the applicants economic key figures for the three last available years as follows:
— turnover;
— profit/loss for the year;
— equity capital;
— total assets.
The information can be given as a table, dated and signed by the applicant, Metroselskabet would prefer not receive annual reports.
Metroselskabet I/S reserves the right to obtain audited annual reports upon request.
— If the request for participation comes from a consortium, the above mentioned information must be submitted for each participant in the consortium.
— If the application is based on economic and financial capacity of a third party (e.g. a parent company), such information must also be enclosed for such third party; furthermore, an availability declaration from the third party must be enclosed, cf. Article 54 (5) of the Utilities Directive.
— If the application is based on economic and financial capacity of a third party (e.g. a parent company), such information must also be enclosed for such third party; furthermore, an availability declaration from the third party must be enclosed, cf. Article 54 (5) of the Utilities Directive.
Minimum requirements regarding economic and financial capacity:
There must be no risk worth mentioning that for financial reasons the applicant will not be able to complete the assignment satisfactorily.
Teknisk og faglig kompetence:
7) The application must be accompanied by references for comparable assignments to the one put out to tender.
Each reference may contain a description of the nature of each project, the client, a contact person if available, the physical and financial size of the project, the work performed by the applicant and the time frame of the project carried out. The project must be carried out within the last five years.
Each reference may contain a description of the nature of each project, the client, a contact person if available, the physical and financial size of the project, the work performed by the applicant and the time frame of the project carried out. The project must be carried out within the last five years.
8) The request must be accompanied by information about the applicant's approximate number of employees in total and relevant for the task put out to tender.
9) Documentation of the company's fulfillment of the particular conditions described in the above paragraph III.1.4
— If the request for participation comes from a consortium, the above-mentioned information must be given for each participant in the consortium.
— If the application is based on technical capacity from a third party (e. g. a subconsultant), the said informationmust also be given for the third party; in addition, an availability declaration from the third party must beenclosed, cf. Article 54 (6) of the Utilities Directive.
— If the application is based on technical capacity from a third party (e. g. a subconsultant), the said informationmust also be given for the third party; in addition, an availability declaration from the third party must beenclosed, cf. Article 54 (6) of the Utilities Directive.
The applicant must document solid experience with – and competence for – solving assignments comparable to the one offered for tender.
Kontraktens udførelse
Krav om deponering og sikkerhedsstillelse: Will be stated in the tender documents.
De vigtigste finansieringsbetingelser og betalingsordninger og/eller henvisning til de relevante bestemmelser, der regulerer dem: Will be stated in the tender documents.
Den juridiske form, som den sammenslutning af økonomiske aktører, der skal have kontrakten, skal have:
A group of economic operators must be jointly and severally liable for the performance of the contract. A declaration to this effect must be submitted if a tender is submitted.
Andre særlige vilkår:
a) Overall aspects of the agreement are described in the Infodocument.
b) In case Ring 3 Letbane I/S is not fully established at the time for contract award Metroselskabet I/S may be the contract holder. In this case a clause will be included in the contract giving Metroselskabet I/S the right to transfer the contract (all rights and obligations) to Ring 3 Letbane I/S.
b) In case Ring 3 Letbane I/S is not fully established at the time for contract award Metroselskabet I/S may be the contract holder. In this case a clause will be included in the contract giving Metroselskabet I/S the right to transfer the contract (all rights and obligations) to Ring 3 Letbane I/S.
c) The contract, which is a part of the tender documents, contains social considerations.
d) The Independent Safety Assessor who will be assigned to the task must comply with the standards of EN/ISO/IEC-17020 and shall be approved by the Danish Railway Authority (Trafikstyrelsen (note in particular Order No. 56 and No. 1187, cf. section II.1.5)) before a contract can be entered into.
d) The Independent Safety Assessor who will be assigned to the task must comply with the standards of EN/ISO/IEC-17020 and shall be approved by the Danish Railway Authority (Trafikstyrelsen (note in particular Order No. 56 and No. 1187, cf. section II.1.5)) before a contract can be entered into.
e) The Independent Safety Assessor must ALSO be able to fulfill the requirements to an independent assessment body which comes into force 2015-05-21 by the revised CSM-RA, ref: "COMMISSION IMPLEMENTING REGULATION (EU) No 402/2013 of 30 April 2013 on the common safety method for risk evaluation and assessment and repealing Regulation (EC) No 352/2009
e) The Independent Safety Assessor must ALSO be able to fulfill the requirements to an independent assessment body which comes into force 2015-05-21 by the revised CSM-RA, ref: "COMMISSION IMPLEMENTING REGULATION (EU) No 402/2013 of 30 April 2013 on the common safety method for risk evaluation and assessment and repealing Regulation (EC) No 352/2009
Udførelsen af tjenesteydelsen er forbeholdt et bestemt erhverv:
The Independent Safety Assessor who will be assigned to the task must comply with the standards of EN/ISO/IEC-17020 and shall be approved by the Danish Railway Authority (Trafikstyrelsen) before a contract can be entered into.
Procedure Sprog
Sprog: dansk 🗣️
engelsk 🗣️
Ordregivende myndighed Identitet
Navn på ordregivende myndighed: Ring 3 Letbane I/S (under prom
Postnummer: DK 2300
Kontakt
Enhed: Department for Miljø, Myndigheder og Sikkerhed (MMS)
Peter Olsen
Navn: Bascon A/S
Postadresse: Baunegårdsvej 73A
Postby: Hellerup
Postnummer: DK 2900
Enhed: Dept. K-byg
Carsten Larsen
Telefon: +45 40631014📞
E-mail: cla@bascon.dk📧
URL til dokumenter: http://www.bascon.dk🌏
URL til deltagelse: http://www.bascon.dk🌏
E-mail: kfst@kfst.dk📧
URL til dokumenter: http://www.bascon.dk/da/udbud🌏
Supplerende oplysninger Gennemgå organ
Navn: Klagenævnet for Udbud
Postadresse: Dahlerup Pakhus, Lange Linie Allé 17
Postby: København Ø
Postnummer: DK 2100 Ø
Land: Danmark 🇩🇰
E-mail: klfu@eogs.dk📧
Telefon: +45 33307700📞
Internetadresse: www.klfu.dk🌏
Oplysninger om frister for klageprocedurer:
Complaint against not being prequalified shall be lodged to Klagenævnet for Udbud not later than 20 calendar days counted from the day after the day the client has sent a notification to the affected applicants. Complaint in respect of other issues than not being prequalified shall be lodged to Klagenævnet for Udbud not later than 45 calendar days after contract award is published in TED.
Complaint against not being prequalified shall be lodged to Klagenævnet for Udbud not later than 20 calendar days counted from the day after the day the client has sent a notification to the affected applicants. Complaint in respect of other issues than not being prequalified shall be lodged to Klagenævnet for Udbud not later than 45 calendar days after contract award is published in TED.
Tjeneste, hvorfra der kan indhentes oplysninger om klageproceduren
Navn: Konkurrence- og Forbrugerstyrelsen - Center for Udbudsregler
Postadresse: Carl Jacobsens Vej 35
Postby: Valby
Postnummer: DK 2500
Telefon: +45 41715100📞
Internetadresse: www.ks.dk🌏
Kilde: OJS 2014/S 096-168482 (2014-05-15)
Bekendtgørelse om indgåede kontrakter (2014-12-04) Objekt Bekendtgørelsens metadata
Dokumenttype: Bekendtgørelse om indgåede kontrakter
Objekt Sted for udførelsen
Hovedsted eller sted for udførelsen:
At the service provider's home address, at Metroselskabets office located at Metrovej 5, DK-2300 Copenhagen S and at the offices of the Ring 3 Letbane I/S.
Ordregivende myndighed Identitet
Navn på ordregivende myndighed: Ring 3 Letbane I/S
Kontakt
E-mail: klfu@eogs.dk📧
Kilde: OJS 2014/S 237-418022 (2014-12-04)