Insurance Services related to the ownership and operation and maintenance of the Copenhagen Metro Phases 1, 2 and 3
The call for tenders comprises insurance services (Material Damage Insurance) related to the ownership and operation and maintenance of the Copenhagen Metro Phases 1, 2 and 3. The insurance period shall be from 1.1.2015 until 31.12.2017.
Copenhagen Metro Phase 1, 2 and 3 comprises line M1 and M2, both with Vanløse as one end station and Vestamager respectively Copenhagen Airport as the other end station. M1 have 15 stations and M2 16 stations. 9 stations are common for both M1 and M2 resulting in a total of 22 stations. 13 of the stations are above ground stations and 9 underground stations of which the 6 are common for M1 and M2. A map illustrating the lines are available at
www.m.dk
A total of 34 sets of trains are serving the lines. Each set of trains consists of 3 carriages coupled together. A train set is 39 meter long, 2,65 meter width and have a capacity of 300 passengers.
More information about the Metro are available at
www.m.dk
Deadline
Fristen for modtagelse af bud var på 2014-08-15.
Indkøbet blev offentliggjort på 2014-07-03.
Hvem?
Hvad?
Hvor?
Indkøbshistorik
Dato |
Dokument |
2014-07-03
|
Udbudsbekendtgørelse
|