Inspection, repair and maintenance service on the vessel HDMS Hvidbjørnen carried out within 10.2.2015-19.3.2015
The assignment includes inspection, repair and maintenance service, according to the specification, of the support ship HDMS Hvidbjørnen. The assignment includes inter alia docking and bottom inspection, a start-up of Class Renewal Survey, exterior painting, repair and maintenance work on the hull and accommodation quarters, as well as general inspection, maintenance and repair work of the vessel's mechanical and electrical systems and components.
The ship's main data:
Steel ship;
— Overall length: 112,5 m;
— Length p.p.: 99,75 m;
— Width max: 14,4 m;
— Draught for: 4,51 m;
— Draught aft: 6,13 m;
— Displacement.: 3500 mt;
— Clearance below BL for lowering Azimuth: 2 m;
— Clearance below BL for lowering rudder stock: 2,5 m;
— Clearance aft of vessel for pulling tail-shaft: 15 m;
— The ship is available during the period 10.2.15-19.3.2015.
Deadline
Fristen for modtagelse af bud var på 2014-12-01.
Indkøbet blev offentliggjort på 2014-10-29.
Leverandører
Følgende leverandører er nævnt i tildelingsbeslutninger eller andre indkøbsdokumenter:
Hvem?
Hvad?
Indkøbshistorik
Dato |
Dokument |
2014-10-29
|
Udbudsbekendtgørelse
|
2014-10-31
|
Supplerende oplysninger
|
2015-02-06
|
Bekendtgørelse om indgåede kontrakter
|