Acquisition of Helicopter approach light systems for the THETIS CLASS

Danish Defence Acquisition and Logistics Organizations (DALO)

The Danish Defence Acquisition and Logistics Organization (DALO) wishes to purchase Helicopter Approach Light Systems to replace the existing systems of the THETIS CLASS (THET-CL) as the four Ships will be rebuilt to fit the new helicopter type SEAHAWK along with the existing LYNX.
The new Helicopter Approach Light System shall assist the Pilot Guiding of the Helicopter along a correct approach path towards the Ship and on to the deck. The system consists of deck light/eyeliners, stop/go lights, masthead strobe light, Helicopter In-Flight Refueling (HIFR) light, static horizontal bar, Glide slope/path Indicator (GSI/GPI) (gyro stabilized), hangar flood (working lights) and a control panel in the Flight Deck Officer (FDO) hut. The system shall be redundant controlled and all the lights shall be able to be dimmed from 0-100 % except fault/wave off light that must not be dimmed to zero. The described system is similar to the existing Helicopter light system on THET-CL.
The installation on the first ship is expected to start in June 2015 but documentation and requirements for preparation of foundations and cable installation are to be delivered no later than 2.3.2015 as cable installation and preparation of foundations is expected to be done by DALO or DALO representative (Yard). Further information is found in the tender documents.
The Helicopter Approach Light System, including installations and an initial spare parts package, will be procured on the basis of an Acquisition Contract. In addition, DALO wishes to enter into a Sustainment Contract with the successful tenderer allowing for the subsequent procurement of spare parts and repair services for the system throughout a period of up to 16-20 years, which is the expected life time for the System.
Please note that the information provided below in sections II.2.3) and II.3) concerns the duration of the Acquisition Contract. As described, the Sustainment Contract is expected to have a longer duration.

Deadline
Fristen for modtagelse af bud var på 2015-01-20. Indkøbet blev offentliggjort på 2014-12-05.

Leverandører
Følgende leverandører er nævnt i tildelingsbeslutninger eller andre indkøbsdokumenter:
Hvem?

Hvad?

Hvor?

Indkøbshistorik
Dato Dokument
2014-12-05 Udbudsbekendtgørelse
2015-03-02 Supplerende oplysninger
2015-04-13 Bekendtgørelse med henblik på frivillig forudgående gennemsigtighed
2015-09-04 Bekendtgørelse om indgåede kontrakter