14/19974 — COBRAcable — VSC Converters
The Scope of work for COBRAcable VSC Converter includes design, execution and completion of the following:
— HVDC-VSC Converter substation in Eemshaven, The Netherlands.
— HVDC-VSC Converter substation in Endrup, Denmark.
The transfer capability for the COBRAcable VSC Converter Plant shall be 700 MW at +/- 320kV DC with reference to IEC TR 62543:2013 Ed. 1.1 High-voltage direct current (HVDC) power transmission using voltage sourced converters (VSC).
Deadline
Fristen for modtagelse af bud var på 2014-11-07.
Indkøbet blev offentliggjort på 2014-10-02.
Hvem?
Hvad?
Indkøbshistorik
Dato |
Dokument |
2014-10-02
|
Udbudsbekendtgørelse
|
2014-11-05
|
Supplerende oplysninger
|
2014-12-05
|
Supplerende oplysninger
|