14/19974 — COBRAcable — VSC Converters

Energinet.dk

The Scope of work for COBRAcable VSC Converter includes design, execution and completion of the following:
— HVDC-VSC Converter substation in Eemshaven, The Netherlands.
— HVDC-VSC Converter substation in Endrup, Denmark.
The transfer capability for the COBRAcable VSC Converter Plant shall be 700 MW at +/- 320kV DC with reference to IEC TR 62543:2013 Ed. 1.1 High-voltage direct current (HVDC) power transmission using voltage sourced converters (VSC).

Deadline
Fristen for modtagelse af bud var på 2014-11-07. Indkøbet blev offentliggjort på 2014-10-02.

Hvem?

Hvad?

Indkøbshistorik
Dato Dokument
2014-10-02 Udbudsbekendtgørelse
2014-11-05 Supplerende oplysninger
2014-12-05 Supplerende oplysninger