SKV steam turbine major overhaul at Skaerbaek Power Plant

DONG Energy Thermal Power A/S

The contract will cover at complete overhaul of the high pressure and (assymetric) intermediate pressure turbine cylinders, see below in Section II.2.1 re Scope of the Contract.
The 416 MW GEC Alstom 5-cylinder steam turbine was commissioned in 1998 with approximately 100 000 operationg hours. It is a double re-heat system operating a live steam pressure of 290 bar and 580°C. The live steam flow is 270 kg/s.

Deadline
Fristen for modtagelse af bud var på 2013-10-09. Indkøbet blev offentliggjort på 2013-09-10.

Hvem?

Hvad?

Hvor?

Indkøbshistorik
Dato Dokument
2013-09-10 Udbudsbekendtgørelse
2013-09-19 Supplerende oplysninger
2013-09-19 Supplerende oplysninger