SKV steam turbine major overhaul at Skaerbaek Power Plant
The contract will cover at complete overhaul of the high pressure and (assymetric) intermediate pressure turbine cylinders, see below in Section II.2.1 re Scope of the Contract.
The 416 MW GEC Alstom 5-cylinder steam turbine was commissioned in 1998 with approximately 100 000 operationg hours. It is a double re-heat system operating a live steam pressure of 290 bar and 580°C. The live steam flow is 270 kg/s.
Deadline
Fristen for modtagelse af bud var på 2013-10-09.
Indkøbet blev offentliggjort på 2013-09-10.