Resource of Co-60 gamma cell 3
Re-sourcing of MDS Nordion Gamma cell 220 Irradiator S/N 220R to achieve a total activity of 15 kCi (555 TBq) of Co-60 at date of delivery. This may be achieved by the addition, or replacement, of sources in existing Gamma cell, or by the supply of an exchange Gamma cell with new sources. If ap-plicable, separate quotations for each option should be included. Estimates of “downtime” sjould also be included.
Existing loading of Gamma cell 220 S/N 220R consists of 10 (ten) loaded MDS Nordion C-198 sources of total activity 12.3 kCi (455 TBq) in December 2006.
Re-sourced or replacement Gamma cell must have at least ten individual source rods with activity dis-tributed uniformly around the source cage. Each source to be “dumb-bell” loaded with equal activity in top and bottom third of rod. The middle third to be inactive spacer. The proposed source distribution must be included in the tender documents returned to DTU Nutech
Quotation to include preparation of Gamma cell for transport, obtaining of all required transport licences and re-installation of Gamma cell after return to DTU Nutech.
Deadline
Fristen for modtagelse af bud var på 2013-06-24.
Indkøbet blev offentliggjort på 2013-05-13.
Leverandører
Følgende leverandører er nævnt i tildelingsbeslutninger eller andre indkøbsdokumenter:
Hvem?
Hvad?
Indkøbshistorik
Dato |
Dokument |
2013-05-13
|
Udbudsbekendtgørelse
|
2014-01-08
|
Bekendtgørelse om indgåede kontrakter
|